• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Diagnóstico: La Reforma Laboral y las políticas necesarias en el Perú. Entrevista a Alfonso de los Heros Pérez-Albela

Monge Morales, Gonzalo J., Heros Pérez Albela, Alfonso de los 25 September 2017 (has links)
El Derecho Laboral es una rama que ha generado mucha polémica en nuestro país, pues mientras  algunos  sectores  consideran que presenta una rigidez que limita al sector privado, otros consideran que es muy flexible y no protege adecuadamente al trabajador.En esta entrevista, el autor nos ilustra sobre la normativa laboral y su impacto a lo largo de los últimos años, desde las reformas laborales que se llevaron a cabo cuando ocupó la cartera del entonces Ministerio de Trabajo y Promoción Social hasta la aprobación de la reciente Ley del Servicio Civil.
2

Propuesta metodológica para Identificar y Cuantificar el retrabajo mediante la aplicación del Total Field Rework Factor – “TFRF” – en la construcción de edificaciones multifamiliares menores a 15 pisos en la ciudad de Lima Metropolitana / Methodological proposal to identify and quantify rework through the application of the Total Field Rework Factor - "TFRF" - in the construction of multifamily buildings of less than 15 floors in the city of Lima Metropolitana

Lunarejo Villagómez, José pedro, Quinto Villegas, Erick Steve 14 January 2021 (has links)
En el Perú, no se ha determinado un procedimiento estándar para registrar y cuantificar el retrabajo en la construcción de edificios multifamiliares, lo que se ha traducido en una discrepancia en los resultados de los distintos estudios desarrollados. Además, el objetivo es plantear un método que permitirá a las empresas identificar la dimensión de los costos de retrabajo en la edificación de los proyectos y reconocer sus causas principales con el objetivo de implementar estrategias de prevención en el futuro. Al considerar que las constructoras trabajan con contratistas de su entera confianza, no se debería identificar retrabajo en las actividades de construcción o, en el peor de los casos, no debería ser muy incidente en el presupuesto inicial del proyecto; por eso, se plantea implementar la aplicación de un método para poder cuantificar el impacto del costo del retrabajo, esto, en base a la tendencia de las partidas con mayor incidencia de retrabajo en las obras de edificaciones multifamiliares. Se obtuvo información, mediante encuestas y visitas al proyecto, por parte de los miembros del staff técnico de tres obras de edificaciones multifamiliares para poder realizar el diagnóstico respectivo y de esta manera poder identificar cuáles son los principales problemas de retrabajo que se generan en las partidas y procesos constructivos en estos proyectos. Dentro de los problemas evidenciados con ayuda de la Metodología TFRF – Total Field Rework Factor, se identificó al encofrado, la excavación de sótanos y el levantamiento topográfico, como las actividades más perjudiciales dentro de los proyectos. / In Peru, a standard procedure has not been determined to record and quantify rework in the construction of multi-family buildings, which has resulted in a discrepancy in the results of the different studies. In addition, the objective is propose a method will allow companies to identify the dimension of rework costs in construction of projects and recognize their main causes with the aim of implementing prevention strategies in the future. Considering that construction companies work with contractors they trust, rework should not be identified in construction activities or, in the worst case, it should not be very incidental in the initial project budget; Therefore, it is proposed to implement the application of a method to be able to quantify the impact of the cost of rework, based on the trend of the items with the highest incidence of rework in the works of multi-family buildings. Information was obtained, through surveys and visits to the project, by members of the technical staff of three multi-family building works to be able to carry out the respective diagnosis and in this way to identify the results are the main rework problems that are generated in the items and construction processes in these projects. Among the problems evidenced with the help of the TFRF Methodology - Total Field Rework Factor, the formwork, the excavation of basements and the topographic survey were identified as the most damaging activities within the projects. / Tesis
3

Evaluación de sobrecostos en la construcción de un local comunal, en la región de Arequipa / Evaluation of overcost in the construction of a communal premises in the Arequipa region

Garcés Adrianzén, Olwer Edithson, Gómez Ruíz, Jinn Jonathan 25 January 2021 (has links)
Esta tesis abordo el tema de la identificación de sobrecostos, propuesta de una metodología de control de costos y evaluación del desempeño del proyecto, orientado a pequeñas obras ejecutadas por MYPES del sector construcción, así como también, la propuesta de una estructura organizativa durante la ejecución de los proyectos, debido a que las MYPES del sector construcción presentan informalidad y pobre cultura de gestión de proyectos, que les impide alcanzar las utilidades esperadas, ser competitivas y garantizar su permanencia en la industria de la construcción. El objetivo principal de la tesis fue proponer una metodología que permita minimizar los sobrecostos en una obra de construcción, por lo que nos enfocamos en la construcción de un local comunal en la región Arequipa. El desarrollo de la tesis se basó en la revisión, análisis y gestión de la información obtenida durante la ejecución de la obra, comprendida en el periodo del 14 de noviembre del 2019, hasta el 15 de marzo del 2020, fechas que corresponden al inicio de obra e inicio del Estado de Emergencia Nacional, declarado mediante Decreto Supremo N°044-2020-PCM, respectivamente. De acuerdo con el análisis y evaluación realizada de la información del proyecto, se concluyó que la metodología del resultado operativo y valor ganados permiten identificar en etapas tempranas los sobrecostos y otras desviaciones del proyecto, con el fin de tomar acciones preventivas y correctivas para culminar las obras dentro de las expectativas del cliente y la empresa. / The object of this thesis is to identify construction overcost, introducing a control cost and evaluation of project's performance methodology, focus on short-term projects executed by the SMEs (Small and Medium Enterprises) in construction. Furthermore, it is presented an organizational structure proposal to be apply during the execution of the projects, in order to offset the informality and scarce of project management education, in the SMEs. This fact, avoid them to reach the expected profits, being competitive and assuring their permanence in the construction industry. The main objective of the thesis was to propose a methodology to reduce cost overruns in a construction site. For our analysis, we focus on a communal premises construction, located in Arequipa region. The thesis development was based on the review, analysis and information management from the data obtained during the project execution, from November 14th, 2019 to March 15th, 2020. This period corresponds to the start of work and the beginning of the National Emergency, declared by Supreme Decree No. 044-2020-PCM, respectively. According to the analysis and evaluation carried out from the project information, we concluded that the operating result and gained value methodology helps to identify overcosts and other deviations of the project in early stages, in order to take preventive and corrective actions to complete the labours within the client and company´s expectations. / Trabajo de investigación

Page generated in 0.0261 seconds