Spelling suggestions: "subject:"squatter settlement.though africa."" "subject:"squatter settlement.though affrica.""
51 |
The impact of informal settlement areas on the land reform programme in South Africa.Saane, B. J. January 2005 (has links)
Informal settlement areas (often referred to as squatter settlements or
squatter camps) exist in all provinces of South Africa. These areas are
characterized by rapid and unplanned development. The result of these
is that property boundaries in most of these areas are not surveyed.
Since the plots do not have boundary beacons, the land parcel is not
properly defined and therefore, the property cannot be registered in the
user or owner's name. Consequently, ownership is not guaranteed.
Thus there are no legal documents to prove the relationship between
an individual and the property.
This paper discusses the problems in the land reform process that can
be attributed to the existence of informal settlements. The paper is
based on a research carried out to assess the effect of informal
settlements on the success of the land reform programme in South
Africa. A review of literature on the land reform programme and its
implementation plan was carried out. The research also included a
literature review on informal settlements in relation to property
ownership, cadastral surveying and land registration.
Three informal settlements in the KwaZulu-Natal province of South
Africa were identified for study. These included Cato Manor and Umlazi
section CC in Durban and Peace Valley 2 in Pietermaritzburg. / Thesis (M.Sc.)-University of KwaZulu-Natal, Pietermaritzburg, 2005.
|
52 |
The effects of prevailing attitudes to informal settlements on housing delivery in Cape TownNziweni, Andy Thabo January 2017 (has links)
Thesis (MTech (Architectural Technology))--Cape Peninsula University of Technology, 2017. / Informal settlements are increasing in the cities of the global South in line with the rapid
rate of urbanisation that is taking place in countries of this region. The growth of informal
settlements in these countries has been exacerbated by factors that are unique to this
region, factors such as scarcity of resources, colonial legacies and rapid urbanisation.
Cape Town, a city that relates to the global South both in terms of geographical location
and socio-economic context, has also seen a rapid growth of informal settlements,
particularly in the last two decades. Like other cities in this region, Cape Town has
ambitions of being regarded as a global city. Global cities are modelled on cities of the
global North such as London, New York and Tokyo. Beyond the economic prestige that is
generally associated with the cities of the global North, the imagery that they conjure up
is also seen as an inspiration to be emulated by cities across the world, and it does not
include informal settlements. As such, informal settlements generate a host of attitudes.
Attitudes towards informal settlements don’t just emanate from political authorities, but
emanate from across the spectrum that constitutes inhabitants and interest groups in
these cities, including the creators of informal settlements themselves. These individuals
and interests, according to their social standing and thus influence, have varying degrees
of agency in the matters related to informal settlements. The aim in this study is to probe
the effect of these attitudes on housing delivery to the poor. Attitudes not only influence
the choice of what is regarded as the norm, but also how any entity that is regarded as
the ‘other’ is evaluated.
Almost without exception, cities that have been characterised by large numbers of
informal settlements have attempted, without success, to eradicate informal settlements
from their urban fabrics. An overarching assumption in this study is that the resilience of
informal settlements says something about their necessity, and the failure by some, to
recognise this necessity or the utilitarian value of informal settlements is influenced by
attitudes.
This research is done by first using a literature review to elucidate on:
• the social condition, that is, the phenomenon of informal settlements,
• the relevant theories applicable to the academic field the thesis is anchored in
(architecture) and other social orders impacting architecture such as modernism,
• the construct of attitudes and its impacts on beliefs, evaluations and perceptions
on the affect of objects.
The Joe Slovo informal settlement is then used as an analytic case study to investigate the
effects of attitudes on the dynamics that have seen the site being transformed into what
had been conceived as a prototype for transforming informal settlements to formal
housing. The study shows that such transformations, although often carried out in the
name of changing the lives of the inhabitants of informal settlements, do not necessarily
entail them remaining at the site post its transformation. In the case of Joe Slovo, it
actually resulted in a sizeable number of the original inhabitants being relocated to a new,
less favourable site.
|
53 |
The effectiveness of poverty alleviation initiatives in Buffalo City Metropolitan municipalityBenya, Zoliswa (Nqolase) January 2011 (has links)
The South African democratic government has, since 1994, implemented various programs that aim to alleviate poverty through policy interventions. The Provincial Growth and Development Plan (Eastern Cape 2004-2014) commit its self to halving poverty by 2014. The research seeks to evaluate the effectiveness of poverty alleviation initiatives in Buffalo City Metropolitan Municipality (BCMM), East London; focussing in Nompumelelo informal settlement. The study applied quantitative and qualitative approaches for biographical and socio economic information; and for in-depth understanding and verification respectively. Data collection was through structured interviews and survey questionnaires. The findings reveal that there are random, short-term poverty alleviation initiatives taking place in Nompumelelo informal settlement area. Projects that could have been self-sustaining collapsed due to lack of skills and training. The study indicates that the level of unemployment is high at 68 percent.
|
54 |
An evaluation of the gaps and barriers in implementing the national waste management policy and its implementation in formal and informal urban areas in Ekurhuleni Municipality, South AfricaTembon, Mbamuku-Nduku Fayez 10 1900 (has links)
Waste management is a global challenge due to high waste generation resulting from high industrialization, urbanization and challenges relating to the efficient implementation of waste management policies acts and standards. Although South Africa has established a number of good waste management policies and related acts and standards, most municipalities still find it challenging to efficiently implement waste management strategies. Ekurhuleni Municipality is facing challenges with the implementation of effective waste management strategies and compliance to the National Environmental Management Waste Act (2008), (NEMWA) (Act No 59 of 2008). An evaluation of the gaps that exist between NEMWA and the local implementation in the formal and informal parts of the Ekurhuleni Municipality was undertaken in this study. Data on the waste management scenario as collected through questionnaires, interviews and observations revealed that differences relating to the poor establishment of an integrated approach to waste management exist between NEMWA and the local implementation of the act. This was realized through the fact that there is limited community education on waste management, no waste recycling facilities in some residences, irregular and insufficient collection of waste and non compliance with tariff payments for most informal residents and some formal residents. Differences also exist in the waste management strategies between the formal and informal areas of the municipality primarily due to the fact that the informal settlements are mostly unplanned and considered illegal. According to this study, informal residents are not billed for waste management services and as such most of them do not pay for waste management services. To that end, waste is not efficiently managed due to municipal financial constraints. Waste management challenges in Ekurhuleni Municipality are also attributed to lack of or insufficient knowledge regarding sustainable waste management practices and its benefits amongst the waste generators and some waste management employees. / Environmental Sciences / M.A. (Environmental Management)
|
55 |
Tshwane Metropolitan Municipality's responses to informal settlements : a case study of MamelodiMoloisane, Mary January 2018 (has links)
The persistence and enormity of the housing backlog facing the poorest of the poor is an indication of the gravity of the housing crisis in Gauteng. The challenge exists despite government efforts to provide low-cost housing and formalize informal settlements. Against the background of this persistent need, this study investigates the City of Tshwane Municipality’s response to informal settlements in Mamelodi Phase 3, Gauteng. Participants from Mamelodi Phase 3 and officials from the City of Tshwane Municipality were purposively sampled. Research findings indicated that informal settlements in Mamelodi are caused by various factors, which include movement from rural to urban areas, movement from other provinces to Gauteng and natural population growth. Furthermore, the persistence of the informal settlements is caused by poverty. Most people continue to live in informal settlements since they cannot access financial assistance from the banks as per the National Credit Regulation (NCR). Corruption is also a formidable problem as some informal settlement dwellers alleged that officials of the City of Tshwane Municipality allocated houses in contravention of set procedures. This research shows that the City of Tshwane’s informal upgrading policies have failed in terms of providing adequate housing. Further, the housing policy has not succeeded in creating long-term sustainability in the delivery of low-cost housing to deal with the problems of the informal settlements. Although the City of Tshwane has implemented the Re aga Tshwane, which involves a wide range of policies, programmes and strategies to address the developmental challenges facing dwellers in informal settlements, more is required. On this basis, it is recommended that proper consultation with the community should be held to improve the lives of people in informal settlements in line with Section 26 of the Constitution of the Republic of South Africa (1996), regarding every person’s right to have access to adequate housing. / Public Administration and Management / M.B.A. (Public Administration)
|
56 |
Towards promoting food security amongst poor urban households : the case of Phomolong in MamelodiAlusala, Loice Nandako 06 1900 (has links)
Promoting household food security for many poor people globally and more so
in Sub-Saharan Africa continues to be a challenge today. Ever rising poverty
levels, an influx in the prevalence of the HIV/ AIDS pandemic, reduced rainfall
accompanied by changing climatic patterns, environmental bankruptcy, the
complexities associated with urbanization, globalisation as well as technology
shift in the agricultural sector and capitalistic market economies all play a role in
the food security debate.
This research has highlighted some of the factors that influence the food
economy and related these to the household food security of poor informal
settlement dwellers.
Achieving household food security for poor urban households requires an
integrated approach in terms of poverty eradication as well as deliberate efforts
with regards to food production and distribution within a framework of ecological
integrity, with an aim of empowering the poor and ensuring that their household
food security is guaranteed. / Development Studies / Thesis (M.A. (Development Studies))
|
57 |
The balanced scorecard as a performance measurement tool for the South Africa government's upgrading of informal settlements programmeJulyan, Leoni 06 1900 (has links)
The perceived lack of progress by the Department of Human Settlements (“Department”) in meeting the increased demand for subsidised housing post-1994 is a ticking time bomb, given the repeated promises without any prospect of meeting the commitment to eradicate or upgrade all informal settlements by 2014. Despite ongoing delivery of subsidised housing, the backlog remained at 2,4 million households from 2005 to 2009, the indicator being the number of informal settlement households. The “Department” has acknowledged the existence of bureaucratic blockages throughout the housing delivery chain. Despite the urgency of the situation, there appears to be no research on the departmental factors hampering delivery under the Upgrading of Informal Settlements Programme (“programme”) and finding a solution that would maximise delivery within budgetary constraints. This research assesses the suitability of the Balanced Scorecard (BSC), a Strategic Management Accounting performance measurement and management tool, for addressing the departmental factors hampering delivery (“factors”) under the “programme” and develops a conceptual framework to guide any future application of the BSC to the “programme”.The complexity of housing delivery and the proposed integration of the BSC call for a detailed literature study of the post-1994 national housing and “programme” documentation and that of the public sector BSC. The theoretical study will establish how and by whom housing delivery should be done, the “factors” and the BSC framework and translation process. This will serve as the basis for the assessment of the suitability of the BSC for addressing the “factors” and the development of the conceptual framework.This study revealed that the BSC is suitable for addressing seven of the eight departmental factors hampering delivery under the “programme” and partially suitable for addressing the remaining factor. The recommendation is that the BSC be applied to the “programme” according to the conceptual framework provided. This study has contributed to knowledge by: producing an overall picture of the national framework for the delivery of subsidised housing, presenting the BSC as a suitable performance measurement tool for addressing the departmental factors hampering delivery under the “programme”, and developing a conceptual framework for any future BSC application to the “programme”. / Accounting Sciences / D. Com. (Accounting)
|
58 |
Legalising of squatters as a factor in social developmentMorake, Makau Winnie Lindi 27 August 2014 (has links)
The study focused on City of Tshwane Metropolitan Municipality situated in Gauteng Province. The study aims to explore the City of Tshwane Metropolitan Municipality process of legalising squatters in relation to social development. A qualitative approach using semi- structured interviews, focus groups, observations and public documents was used to explore the process of legalising of squatters in relation to social development.
The researcher, based on the evidence from the respondents, public documents and the discussion of findings, concludes that there is a positive relationship between the process of legalising of squatters in the City of Tshwane Metropolitan Municipality and social development as an approach. The City of Tshwane Metropolitan Municipality process of legalising squatters is in line with the South African legislations and social policies.
The finding will add value to the City of Tshwane Metropolitan Municipality, Department of Human Settlements, Non –governmental and Faith Based Organisations and other sector stakeholders working with informal settlement dwellers in the following ways:
a) Helping the City of Tshwane Metropolitan Municipality in the implementation of informal settlement policies and processes;
b) Recommendations to policy issues;
c) Advancement of knowledge. / Social Work / M. A. (Social Work)
|
59 |
The role of social capital in the creation of sustainable livelihoods : a case study of the Siyazama Community Allotment Gardening Association (SCAGA)Jacobs, Cindy 03 1900 (has links)
Thesis (MPhil (Sociology and Social Anthropology))--University of Stellenbosch, 2009. / Cape Town’s growing economy has benefited greatly from its natural resources. The city
boasts the unique Table Mountain; Blue Flag beaches; and the distinctive fynbos of the Cape
Floral Kingdom, all of which have contributed considerably to the revenue generated by the
tourism industry. Even though the city’s economy appears robust, many people living in
townships on the Cape Flats continue to face a reality of being trapped in a state of
deprivation; unable to access those natural resources as a means to make a living; and unable
to cope with shocks, trends and seasonality in a dynamic, vulnerable society plagued by
inequitable distribution of wealth and environmental degradation.
Yet, while access to financial, natural (and other) assets is limited, poor people can rely upon
their social assets – or Social Capital (SC) in order to make a living.
This case study explores the three types of Social Capital – (i) Bonding SC (between project
beneficiaries), (ii) Bridging SC (between project beneficiaries and implementing agents) and
(iii) Linking SC (between implementing agents and local government organs) – in an attempt
to understand their impact on the livelihoods of project beneficiaries involved in the
Khayelitsha-based Siyazama Community Allotment Gardening Association (SCAGA). This
was done with the purpose of enabling development practitioners, government officials and
local people to work together to plan sustainable initiatives that enhance peoples’ quality of
life.
Although case studies have been criticised by some authors as lacking scientific rigor and do
not address generalisability, this study employed a case study approach due to its
appropriateness when dealing with a small number of participants and the specific context of
their complex real-life activities in great depth. By taking a post-positivistic stance, the
researcher was able to appreciate the different constructions and meanings that people place
upon their life experiences.
|
60 |
Legalising of squatters as a factor in social developmentMorake, Makau Winnie Lindi 27 August 2014 (has links)
The study focused on City of Tshwane Metropolitan Municipality situated in Gauteng Province. The study aims to explore the City of Tshwane Metropolitan Municipality process of legalising squatters in relation to social development. A qualitative approach using semi- structured interviews, focus groups, observations and public documents was used to explore the process of legalising of squatters in relation to social development.
The researcher, based on the evidence from the respondents, public documents and the discussion of findings, concludes that there is a positive relationship between the process of legalising of squatters in the City of Tshwane Metropolitan Municipality and social development as an approach. The City of Tshwane Metropolitan Municipality process of legalising squatters is in line with the South African legislations and social policies.
The finding will add value to the City of Tshwane Metropolitan Municipality, Department of Human Settlements, Non –governmental and Faith Based Organisations and other sector stakeholders working with informal settlement dwellers in the following ways:
a) Helping the City of Tshwane Metropolitan Municipality in the implementation of informal settlement policies and processes;
b) Recommendations to policy issues;
c) Advancement of knowledge. / Social Work / M. A. (Social Work)
|
Page generated in 0.1165 seconds