Spelling suggestions: "subject:"atandards, engineering"" "subject:"atandards, ingineering""
1 |
The house building activities of the informal sector : a case study in Las Pinas City, PhilippinesMaribbay, Annalyn. January 2000 (has links)
House building activities of the informal sector constitutes the acquisition, consolidation and use of building materials and labor that may contravene existing standards, but affords them a coping mechanism to a dynamic urban environment. Studies show that the informal housing sector is largely responsible for most of the housing stock catering for the low-income families. / The research aims at understanding the house building activities of the informal sector and is limited to identifying and describing the building materials and building methods employed, together with its underlying networks. / The case study in the informal community of Sitio Pugad Lawin, Las Pinas City, Philippines, found that, the houses were built by its owners with friends and relatives or by small contractors. They used simple timber framing methods, and combinations of indigenous, conventional and non-conventional building materials for the housing elements.
|
2 |
The house building activities of the informal sector : a case study in Las Pinas City, PhilippinesMaribbay, Annalyn. January 2000 (has links)
No description available.
|
3 |
Determining the R values for 12 inch deep Z-purlins and girts with through-fastened panels under suction loadingWibbenmeyer, Kaye Dee, January 2010 (has links) (PDF)
Thesis (M.S.)--Missouri University of Science and Technology, 2010. / Vita. The entire thesis text is included in file. Title from title screen of thesis/dissertation PDF file (viewed July 26, 2010) Includes bibliographical references (p. 58-59).
|
4 |
2005 NBCC-based seismic design of gravity retaining walls /Chikh Mohamad, Hasan. January 1900 (has links)
Thesis (M.App.Sc.) - Carleton University, 2007. / Includes bibliographical references (p. 128-137). Also available in electronic format on the Internet.
|
5 |
Predicting the failure times of glulam members exposed to fire /Simpson, Lisa May Pearl, January 1900 (has links)
Thesis (M.App.Sc.) - Carleton University, 2007. / Includes bibliographical references (p. 136-140). Also available in electronic format on the Internet.
|
6 |
Utilização do método Analytic Hierarchy Process (AHP) para localização de usina de reciclagem de resíduos da construção civilSilva, Mayara Cristina Ghedini da 07 May 2012 (has links)
CAPES / Este trabalho teve por objetivo propor uma metodologia para identificação de potenciais locais para a implantação de uma usina de reciclagem de Resíduos da Construção Civil (RCC), na cidade de Ponta Grossa. Para isto, foi desenvolvida uma contextualização sobre: sustentabilidade e desenvolvimento sustentável; Resolução do CONAMA; Norma da ABNT e legislação municipal, que impõem critérios para a implantação de usina para a reciclagem dos mesmos. Buscando responder os objetivos específicos deste trabalho, a metodologia aplicada foi dividida em cinco etapas, sendo elas: levantamentos bibliográficos e documentais, para seleção de critérios e subcritérios; validação dos critérios; definição das alternativas; desenvolvimento da estrutura hierárquica e aplicação do modelo no software Expert Choice 11.5. Com este trabalho, foi desenvolvida uma metodologia aplicável em diferentes cidades, que tenham como objetivo a implantação de uma usina de reciclagem. O método Analytic Hierarchy Process (AHP) possibilitou transformar informações qualitativas em quantitativas, facilitando assim os processos decisórios. Deste modo, concluiu-se que com a aplicação do método AHP que o critério Pilar Ambiental apresenta-se como maior fator de tomada de decisão, e o terreno localizado no bairro de Uvaranas, apresenta-se como a alternativa com maior potencial para a implantação da usina de reciclagem de RCC, na cidade de Ponta Grossa. / This research aimed to propose a methodology for identifying potential sites to locate a waste recycling plant of Civil Construction in Ponta Grossa city. For this, presenting a background on: sustainability and sustainable development; CONAMA Resolution; ABNT rules and municipal laws, which impose criteria for the establishment of the plant for recycling them. Seeking to answer the specific objectives of this study, the methodology applied was divided into five stages, namely: bibliographic and documentary, to select criteria and sub criteria; criteria validation, definition of alternatives; development of the hierarchical structure and application of the model in software Expert Choice 11.5. With this work, it was developed a applicable methodology in different cities, which have as their objective the establishment of a recycling plant. The Analytic Hierarchy Process (AHP) method allowed to transform qualitative informations into quantitative, so facilitating decision making processes. Can be concluded that with the application of AHP method which the criterion Environmental Pillar presents itself as a major factor in decision making and the land located in the Uvaranas neighborhood, presents itself as the alternative with the greatest potential to locate a waste recycling plant of Civil Construction in Ponta Grossa city.
|
7 |
Investigation into cracking in reinforced concrete water-retaining structuresMcLeod, Christina Helen 03 1900 (has links)
Thesis (MScEng)--Stellenbosch University, 2013. / Durability and impermeability in a water-retaining structure are of prime importance if the structure is to fulfill its function over its design life. In addition, serviceability cracking tends to govern the design of water retaining structures. This research concentrates on load-induced cracking specifically that due to pure bending and to direct tension in South African reinforced concrete water retaining structures (WRS).
As a South African design code for WRS does not exist at present, South African designers tend to use the British codes in the design of reinforced concrete water-retaining structures. However, with the release of the Eurocodes, the British codes have been withdrawn, creating the need for a South African code of practice for water-retaining structures. In updating the South African structural design codes, there is a move towards adopting the Eurocodes so that the South African design codes are compatible with their Eurocode counterparts. The Eurocode crack model to EN1992 (2004) was examined and compared to the corresponding British standard, BS8007 (1989). A reliability study was undertaken as the performance of the EN1992 crack model applied to South African conditions is not known. The issues of the influence of the crack width limit and model uncertainty were identified as being of importance in the reliability crack model.
|
8 |
Análise da vida útil estimada das edificações baseada na norma de desempenho (ABNT NBR 15.575:2013)Nina Celeste Macario Simões da Silva 25 February 2016 (has links)
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / Conselho Nacional de Desenvolvimento Científico e Tecnológico / A análise da vida útil (VU) de uma edificação exige a observação de muitas variáveis, especialmente aquelas voltadas para o desempenho e durabilidade. Nesse sentido, a ABNT NBR 15.575:2013 Edificações habitacionais Desempenho estabelece requisitos, critérios e métodos de avaliação para analisar o desempenho das construções, e ao mesmo tempo subsidiar os projetistas a determinar a vida útil de projeto (VUP) condizente com o nível de desempenho desejado pelo construtor e usuário. Acrescente-se que o cálculo para a vida útil estimada (VUE) das construções leva em consideração o envelhecimento natural dos componentes dos sistemas construtivos, mas não contempla o efeito dos danos provocados pela entrada em operação e uso da edificação ou ausência de manutenção. Além disso, a ABNT NBR 5674:2012 - Manutenção de edificações Requisitos para o sistema de gestão de manutenção, indica quais os sistemas e serviços devem passar pelo processo de manutenção e em qual período, possibilitando a gestão da manutenção com qualidade. Entretanto, não é sempre o que ocorre nas edificações após a entrada em operação e uso. Na pesquisa, procurou-se, então, verificar qual a relação entre a vida útil estimada e os prazos de garantia das obras. Para medir a diferença percentual entre a VUP e a VUE, após a intervenção da ATPO foi utilizado o método dos fatores previsto na ISO 15.686:2000 - Building and construction assets service life planning e recomendado pela NBR 15.575-1:2013. As informações analisadas foram cedidas por uma construtora atuante na cidade do Recife, coletadas de um banco de dados proveniente da assistência técnica pós-obra (ATPO) de oito empreendimentos construídos na Região Metropolitana do Recife. A frequência de ocorrência de danos nas edificações foi analisada através da determinação da taxa de falhas dos empreendimentos. Os resultados assinalam para um percentual de redução da vida útil de projeto (VUP), da ordem de 20% da vida útil de referência (VUR), valores adotados da NBR 15.575:2013; apontam também, para uma concentração de avarias no estágio inicial da construção, acima de 50%, que correlacionando com a curva de probabilidade condicional de falha (curva da banheira) obtém-se um alto índice de falha brusca, classificando a edificação na fase da mortalidade infantil. Esses resultados refletem uma variação não planejada do nível de desempenho proposto para a edificação. Diante desse contexto, sugere-se vincular o prazo de garantia da obra com o nível de desempenho efetivo da construção. A aplicação de conceitos de confiabilidade permite inferir sobre os prazos de garantia da obra e fazer comparações com o valor previsto no aparato legal brasileiro. / Analysis of service life of a building requires the observation of many variables, especially corre-lating to the performance and durability. In this meaning, the NBR 15.575:2013 - Residential Buildings - Performance establishes requirements, criteria and methods assessment for analyz-ing the performance of buildings, and sometimes subsidize designers to determine the design life consistent with the performance level desired by the builder and user. Adding that the calculation of the estimated service life of buildings takes into account the natural aging of the building sys-tems components, but not contemplates of the damage effect caused by the entry into operation and use of the building or absence conservation. Moreover, the NBR 5.674:2012 - Buildings Maintenance - Requirements for the maintenance management system, indicates which systems and services that must go through the maintenance process and in what period, enabling mainte-nance management quality. However, it is not always what happens in the buildings after entry into operation and use. In the survey, we tired so verify the relationship between the predicted service life and the warranty period of the building. The information analyzed were provided by an active construction of Recife, collected in a database from the technical assistance after work eight buildings in the Metropolitan Region of Recife. To measure the percentage difference be-tween the design life and estimated service life, following the intervention of the technical assis-tance after work was used the factors method set out in ISO 15.686:2000 - Building and construc-tion assets - Service life planning and recommended by NBR 15575-1:2013. The frequency of occurrence damage in buildings was analyzed by determining the rates of failure in the buildings. The results show to a reduction of the design life of the order of 20% of the reference service life, from values adopted in the Performance of Brazilian Standard; also point to a concentration of damage in the initial stage of construction, above 50%, which correlate with the conditional prob-ability of failure curve (Bathtub Curve) sorting a high abrupt failure rate, ranking the building at the stage of infant mortality. These results reflect an unplanned variation in performance level proposed for the building. In this context, it is suggested to link the period of the works guarantee to the level of actual performance of the building. The application of reliability concepts allows infer about warranty period of the Building and make comparisons with the requirement of Brazi-lian law enforcement.
|
9 |
Caracterização de impacto ambiental no solo em um aterro de pequeno porte /Bellezoni, Rodrigo Augusto. January 2012 (has links)
Orientador: Jorge Hamada / Banca: Ana Silvia Palcheco Peixoto / Banca: Vagner Roberto Elis / Resumo: A disposição de resíduos sólidos no solo gera frequentes preocupações ambientais, sociais e de saúde pública. Os aterros sanitários de pequeno porte são uma alternativa sugerida por órgãos ambientais no Estado de SP para que pequenos municípios possam destinar seus resíduos de forma ambientalmente segura, a custos reduzidos. Esta pesquisa teve como objetivo avaliar, sob a análise de aspectos físicos e geofísicos, se este mecanismo possui capacidade em conter os líquidos percolados das colunas de resíduos, evitando riscos de contaminação no solo e águas subterrâneas. Para tanto, características físicas da área de influência do aterro foram determinadas com auxílio de mapas, assim como as características físicas foram determinadas através de ensaios padrão. O método da Eletrorresistividade foi empregado para caracterizar o solo em subsuperfície e estimar sua capacidade na atenuação de contaminantes. Os resultados mostraram o potencial de aplicação deste método, através da relação entre elevada carga iônica e baixa resistividade elétrica, definindo com clareza o limite das plumas de contaminantes. O chorume ocorre em grande parte das valas mais recentes, devido à etapa de decomposição. Valas antigas apresentaram tendência de aumento na resistividade, significando queda na geração de chorume, concomitante ao aumento do tempo de resistividade dos resíduos. Assim, a zona de influência dos resíduos limitou-se à 20 m da área de disposição no plano horizontal e até 8,5 em profundidade. As propriedades físico-químicas do solo argiloso local influenciaram o comportamento da pluma de contaminantes, visto a redução destas ao longo do tempo. Destacam-se o mineral de argila e a granulometria como os possíveis principais responsáveis pela atenuação natural dos contaminantes. Em alguns... (Resumo completo, clicar acesso eletrônico abaixo) / Abstract: The disposal of solid waste in the soil often creates environmental, social and public health concerns. Small landfills are an alternative suggestion by environmental agencies in the State of São Paulo so small cities direct their waste in an environmentally safe manner, at costs. This research is aimed to evaluate, under the analysis of physical and geophysical concepts, if this mechanism has the capacity to contain lanchated liquid from the columns of waste, avoiding risks of contamination in soil and groundwater. Thus, physical characteristics of landfill catchment area were determined with the aid of maps, as well as the physical characteristics of the local soil were determined by standard assays. The Electrical Resistivity method was employed to characterize the subsoil and to estimate its ability to attenuate contaminants. The results showed the potential application of this method through the relationship between hhigh ionic charge and low resistivity, defining clearly the limits of contaminant plumes. Leachate occurs largely in the more recent dithes, due to the decomposition phase. Older ditches tended to increase in resistivity; it means decrease of leachate generation, as well the increase of waste time residence. Thus, the waste influence zone was limited to 10 m of the disposal area in the horizontal plane and up to 8.5 m in depth. The physicochemical properties of the clay soil spot have influenced the contaminants plume behavior, to reduce it along the time. Emphasizing this are the clay mineral and grain size held as possible primary accountable for natural attenuation of contaminants. At some ponts, it is estimated that the layer of unsaturated soil under the ditches be less that one meter, it does not comply the criteria for exemption of additional waterproofing, established in NBR 15.849:2010 Municipal solid waste... (Complete abstract click electronic access below)
|
10 |
Caracterização de impacto ambiental no solo em um aterro de pequeno porteBellezoni, Rodrigo Augusto [UNESP] 27 August 2012 (has links) (PDF)
Made available in DSpace on 2014-06-11T19:29:30Z (GMT). No. of bitstreams: 0
Previous issue date: 2012-08-27Bitstream added on 2014-06-13T19:38:36Z : No. of bitstreams: 1
bellezoni_ra_me_bauru.pdf: 3031269 bytes, checksum: fb9929ec904e2ea3a2320a92f75db9df (MD5) / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / A disposição de resíduos sólidos no solo gera frequentes preocupações ambientais, sociais e de saúde pública. Os aterros sanitários de pequeno porte são uma alternativa sugerida por órgãos ambientais no Estado de SP para que pequenos municípios possam destinar seus resíduos de forma ambientalmente segura, a custos reduzidos. Esta pesquisa teve como objetivo avaliar, sob a análise de aspectos físicos e geofísicos, se este mecanismo possui capacidade em conter os líquidos percolados das colunas de resíduos, evitando riscos de contaminação no solo e águas subterrâneas. Para tanto, características físicas da área de influência do aterro foram determinadas com auxílio de mapas, assim como as características físicas foram determinadas através de ensaios padrão. O método da Eletrorresistividade foi empregado para caracterizar o solo em subsuperfície e estimar sua capacidade na atenuação de contaminantes. Os resultados mostraram o potencial de aplicação deste método, através da relação entre elevada carga iônica e baixa resistividade elétrica, definindo com clareza o limite das plumas de contaminantes. O chorume ocorre em grande parte das valas mais recentes, devido à etapa de decomposição. Valas antigas apresentaram tendência de aumento na resistividade, significando queda na geração de chorume, concomitante ao aumento do tempo de resistividade dos resíduos. Assim, a zona de influência dos resíduos limitou-se à 20 m da área de disposição no plano horizontal e até 8,5 em profundidade. As propriedades físico-químicas do solo argiloso local influenciaram o comportamento da pluma de contaminantes, visto a redução destas ao longo do tempo. Destacam-se o mineral de argila e a granulometria como os possíveis principais responsáveis pela atenuação natural dos contaminantes. Em alguns... / The disposal of solid waste in the soil often creates environmental, social and public health concerns. Small landfills are an alternative suggestion by environmental agencies in the State of São Paulo so small cities direct their waste in an environmentally safe manner, at costs. This research is aimed to evaluate, under the analysis of physical and geophysical concepts, if this mechanism has the capacity to contain lanchated liquid from the columns of waste, avoiding risks of contamination in soil and groundwater. Thus, physical characteristics of landfill catchment area were determined with the aid of maps, as well as the physical characteristics of the local soil were determined by standard assays. The Electrical Resistivity method was employed to characterize the subsoil and to estimate its ability to attenuate contaminants. The results showed the potential application of this method through the relationship between hhigh ionic charge and low resistivity, defining clearly the limits of contaminant plumes. Leachate occurs largely in the more recent dithes, due to the decomposition phase. Older ditches tended to increase in resistivity; it means decrease of leachate generation, as well the increase of waste time residence. Thus, the waste influence zone was limited to 10 m of the disposal area in the horizontal plane and up to 8.5 m in depth. The physicochemical properties of the clay soil spot have influenced the contaminants plume behavior, to reduce it along the time. Emphasizing this are the clay mineral and grain size held as possible primary accountable for natural attenuation of contaminants. At some ponts, it is estimated that the layer of unsaturated soil under the ditches be less that one meter, it does not comply the criteria for exemption of additional waterproofing, established in NBR 15.849:2010 Municipal solid waste... (Complete abstract click electronic access below)
|
Page generated in 0.0724 seconds