• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 299
  • 4
  • 3
  • 3
  • Tagged with
  • 309
  • 137
  • 125
  • 77
  • 76
  • 72
  • 71
  • 70
  • 67
  • 65
  • 63
  • 62
  • 62
  • 62
  • 59
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
191

Ubytování pro mládež / Youth Apartment Building

Juhászová, Michaela January 2016 (has links)
The aim of this thesis is the design of an youth apartment building in the range of designing the documentation for building construction. The building is situated on the flat plot no. 873/21 in the cadastral area „Horní Heršpice“ 612065. In the building there is 42 rooms, 2 wheelchair-accessible rooms and 4 student apartments. The capacity of the building is designed to accommodate 86 students under 18 years and 16 students older than 18 years. In the building there is also a dining room, a library, a fitness room and a gym for free time. It is partly a two-storey and partly a four-storey building without a basement, roofed by a flat roof. Masonry is designed from clay blocks and floor slab is designed by a cast-in-place reinforced concrete floor structure.
192

Náklady životního cyklu majetku ve vlastnictví města / Life Cycle Costs of Property Owned by the City

Vlastníková, Tereza January 2016 (has links)
The master thesis focuses on problems connected with the life cycle cost of property owned by the city. It analyses general issues of the life cycle cost of construction, but it mainly analyses the ways in which local authorities manage their properties and their cost. Those methods are applied in a case study, that addresses the cost and management of swimming pool sites which are owned by the city Brno.
193

Rozdíl mezi předběžnou a výslednou cenou stavební zakázky / The difference between preliminary and final price of construction contract

Zatloukal, Ondřej January 2016 (has links)
This thesis is focused on comparing prices for a preliminary reconstruction of the building and the final price after its finished. Theoretical part deals with the procurement, pricing and budget construction. In the practical part I describe ways to create a price of the selected object reconstruction, the change in the course of implementation and the results upon completion.
194

Tepelně-vlhkostní analýza konstrukcí masivních dřevostaveb / Hygrothermal analysis of massive wooden structures

Uherka, Pavel January 2016 (has links)
This thesis deals with massive wooden buildings especially with regard to the current approach to their design, assessment and approval. In this thesis are shown future possibilities of development of traditional wooden buildings with regard to current thermal technical requirements. Theoretical considerations are then compared with measurements which were performed on massive wooden wall samples.
195

Stavebno technologický projekt bytových domov Zdravie v Hornom Smokovci / Building Technology Project of residential buildings Health in Horný Smokovec

Šifrová, Sláva January 2016 (has links)
The subject solutions diploma works are objects of apartment buildings II Health in Upper Smokovec. The work is focused on the bottom shell construction based versions of risk analysis. The content of the work are equipment, detailed construction schedule, budget and technical procedures of selected parts of the building.
196

Rekonstrukce městského úřadu / Renovation of municipality office

John, Josef January 2017 (has links)
This thesis deals with the reconstruction of the Adamov municipality,based on a solution of barrier-free building use, overall improvement of the energy performance of the building and creation of new office spaces in the form of a loft. The object is located on a building site in the town Adamov. The object is currently connected to a III. road, parking space and utilities. It is a building with three above-ground floors and one basement floor. The ground plan of the municipality is rectangle-shaped, the maximum outline dimensions of the rectangle are 28.38 x 16.70m. Existing vertical supporting constructions are mason made of fired bricks. The roof frame structure is made of wood, construction framework stagnant stool, fired tiles are used as roofing. Floor surfaces are formed by ceramic tiles or vinyl. The entrance part is covered with a flat roof. The entrance area will be redesigned as a barrier-free, with a connection to the elevator that goes through the entire object. The sanitary facilities in the first and in the second floor will be renovated. Newly created attic floor will be – except for the lift - connected to the interior of the building by a new steel staircase and the walls on this floor will be of a light type. Holes fillings will be changed in the perimeter walls. A thermal insulation of the entire object by a contact heating system will take place. This thesis consists of preparatory work and studies, implementing documentation, text reports, calculations of the thermal technical assessment and fire safety solutions. Project documentation is made in accordance with currently valid laws, regulations and standards.
197

Objekt ubytovny pro studenty / Student Hostel

Purket, Petr January 2017 (has links)
The aim of this thesis is design of an apartment building for students. The design is in the range of the documentation for designing building construction based on the decree 499/2006 Sb. as amended by decree 62/2013 Sb. The building is situated on the plots 1220, 1219/1, 1218/11 and 1218/2 in the cadastral area „Letovice“. The new building is designed to accommodate students for year-round occupancy. There is a dining room for staying students and students from nearby schools as well. In the new building are also multimedia classrooms, library, reading rooms, club rooms, gym and lecture hall available for students. In the building are 30 rooms. The capacity of the building is designed to accommodate 81 students. The building has three floors, a loft and no basement. Masonry is designed from clay blocks and floor slab is designed as a cast-in-place reinforced concrete floor structure.
198

Rekonstrukce objektu bazénu ZŠ Pastviny / Reconstruction of the building pool ZŠ Pastviny

Říhová, Petra January 2017 (has links)
This diploma thesis aims to prepare documentation for the execution of the project. This is a reconstruction of object pool primary school Pastviny. Primary school is situated on the territory of the Jihomoravský region in the Brno. Diploma thesis include two outbuilding, one is the entrance of building and the second are auxiliary facilities, and extension classrooms. The building is designed as a brick building , where the vertical and horizontal structures are designed from the structural system Ytong. It has two floors and is covered with a flat roof.
199

Vývoj systémů zděných konstrukcí s použitím v záplavových oblastech / Development of masonry systems with utilization in flood areas

Fabiánková, Aneta January 2017 (has links)
Thesis describes the system of masonry structures in floodareas. It is based on liteature review of floods, mapping mansonry load during floods, dyinig after the passage of the flood wave solutions and water impermeability construction to prevent degradation and destruction. The main part is the design of the wall, which connectes hydrophobic individual elements of construction to provide resistence during floods. The diploma thesis includes practical verification of the functionality of a complete proposal to ensure the smallest possible water absorption caúitaly of the structure.
200

Liniová stavba v rámci životního cyklu z pohledu BIM / Line construction within the life cycle from the perspective of BIM

Vacková, Veronika January 2017 (has links)
The aim of the work was the usage of the Building Information Modelling system to ensure the complete building-up, including the working part of the line constructions. In the first part of my thesis I was dealing with the costs of the total life of the line construction, the line construction life-cycle, with the difference between the Building Information Modelling model and traditional projecting, with the participators participants of the Building Information Modelling model and which levels in the Building Information Modelling exist. In the practical part I was dealing with two levels of the Building Information Modelling designing, in which I set the total price of the building researched and then I was comparing them. In the final chapter of the thesis working expenses were set which are involved in the expenses of the total life.

Page generated in 0.0201 seconds