• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 299
  • 4
  • 3
  • 3
  • Tagged with
  • 309
  • 137
  • 125
  • 77
  • 76
  • 72
  • 71
  • 70
  • 67
  • 65
  • 63
  • 62
  • 62
  • 62
  • 59
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
291

Realizace bytového domu v Uherském Hradišti / REALIZATION OF A RESIDENTIAL BUILDING IN UHERSKE HRADISTE

Sedlářová, Martina January 2018 (has links)
The subject of this master’s thesis is elaboration of selected parts of the building tech-nology project of residential building Stepnice in Uherske Hradiste. Part of the project is technical report, estate road layout, studies of major technological stages, project of site equipment, design of major machines and mechanisms, technological regulations and control and test plans for prefabricated ceiling and masonry system. Attachment of this master´s thesis is drawings of site equipment, selected construction details, working safety, instructions for using the building, budget by items and a time plan. The aim of the project is to design appropriate and economically effective procedure for realization of the building.
292

Stavebně technologický projekt polyfunkčního domu Sokolská 5 v Olomouci / Construction and technological project of polyfunctional building Sokolská 5 in Olomouc

Slováček, Ondřej January 2018 (has links)
The subject of this diploma thesis is the elaboration of the building project of Polyfunkční dům Sokolská 5. In the course of the diploma thesis is elaborated a summary technical report, report of building site and drawings for individual stages. The implementation of the waterproofing of the base structure and the reinforced concrete monolithic skeleton are subject to technological regulations and control and test plans. In this work the object time and financial plan, the use of machines and mechanisms and health and safety at work are also solved. For the main building objects, an item budget and a detailed schedule are prepared. Part of this work is also the calculation of the heat transfer through the envelope of the building.
293

Stavebně technologický projekt haly ADS s.r.o. Větřkovice / Building Construction Project - Implementation of Production Hall ADS s.r.o. Větřkovice

Ráb, Jakub January 2019 (has links)
The subject of my master's thesis is construction technological project of the hall ADS s.r.o. Větřkovice. The work includes technical report of construction technological project, facilities of construction zone, solving traffic routes from the production to the place of construction, study of the implementation of the main technological stages of the building SO02, the most appropriate machine assembly, technological specification for drilled piles and for montage of prefabricated reinforced concrete skeleton, control and test plan, schedule of work, itemized budget, plan of the safety and health protection during work, proposals of design of movement mechanisms and time and financial discretion of realization of the reinforced areas of the production hall area.
294

Příprava realizace dostavby klinické hematologie FN Brno / Preparation of realization of completion of clinical hematology, University Hospital Brno

Průcha, Aleš January 2020 (has links)
The aim of this diploma thesis is a solution of the extension of clinical hematology of the Faculty Hospital Brno. The thesis deals with the technological regulation for steel construction, coupled ceiling concrete slab with other topics including an inspection-check plan, a time schedule for carcass, time and financial schedule for structures and an item budget. In addition, this work includes the coordination site-layout of the construction with wider transport relations, mechanical assembly, the principles of the organization of site equipment and occupational safety and health risks. Finally this thesis contains several assessments for cranes, scheme of principles of fixing steel columns into structure, scheme of laying building envelope, LEED, site equipment financial assessment.
295

Bytové domy v Brně, Bystrci - příprava a organizace výstavby / The Block of Flats in Brno, Bystrc - Project Planning and Management

Šarlejová, Petra January 2014 (has links)
This thesis deals with the project planning and management of the construction of two houses of flats in Brno – Bystrc, Šemberova street. The houses of flats are designed as a newly built five floors above ground and one basement floor. The supporting system is made from brick ceramic blocks, underground floor is made of concrete blocks. This thesis processes technological project of building as preparation and building site equipment, use of machines necessary for implementation of the construction, monitoring and test plan, technological steps for basement walls of shuttering blocks. Finally, in this thesis dealt with time and cost of construction of houses of flats.
296

Centrální objekt nemocnice v Uherském Hradišti - stavebně technologická příprava stavby / Central hospital buildings in Uherske Hradiste - Building construction technology preparation

Novotný, Zdeněk January 2015 (has links)
This diploma thesis deals with construction and technological preparation of the construction of the central hospital building in the town Uherske Hradiste. The work is composed of selected parts of the building and technological project, which is annexed to the diploma thesis. On some selected parts of the building and technological project is also prepared relevant drawings. The aim of the thesis is to choose a suitable and effective implementation process object depending on the circumstances and determine the resources of time, funds, personnel and materials.
297

Rekonstrukce areálu učiliště Dubňany. Stavebně technologická příprava stavby. / 1. Reconstruction of the vocational school Dubňany. Construction Technology Preparation

Dohnálek, Marek January 2015 (has links)
The subject of this technological preparation of construction is to find out scope of work needed for reconstruction of former miners school in Dubňany.In Czech Republic exits plenty of these abandoned places and this master thesis should serve as an example of reconstruction of some theirs parts.Within this project I would like to valorize the experience gained from excursion to foreign countries, where the passive and low-energetic buildings are common.Missing project documentation of some part of this facility was replaced by 3D modelling based on my own laser measurement.The main object SO 01 has been already rebuilt into passive apartment building but without building-technological study and proper project documentation.Due to missing foundations and confidential internal documentation of the construction company is impossible to compare the real material, human and financial resources with those mentioned within this thesis. The master thesis contains technical report for the building-technological project, coordination of the transport routes, chronological and financial plan, realisation of the main technological steps, equipment of the construction project , draft of machinery, time schedule of the main project, plan of getting the needful resources, technological regulations, control and probationary plans, disposal of asbestos reports, owning contract, two roof decks comparison from the point of view of thermal technology and specialization from the building field.
298

Rezidence Sochorova - bytový dům BD 2, stavebně technologický projekt / Residence Sochorova - apartment building BD 2, construction and technology project

Vybíral, David January 2015 (has links)
This thesis describes the building of a residential house called Rezidence Sochorova BD02 in Brno, Žabovřesky. The aim was the creation of the main parts of a constructional-technological project focused on the design of transport relations, the construction site facilities and its machinery, the creation of selected technological regulations and their control and testing plans. To secure safety and to protect health during the construction work itself, a risk plan and a suggestion of safety aids was created. In addition, an itemized budget of the construction, a time plan, environmental protection and a financial and time comparison of using a hopper in contrast to a concrete pump.
299

Bytový dům Olomouc, Nezvalova ulice, stavebně technologická příprava stavby / The Flat-building in Olomouc, Nezval street, civil technological project

Drexler, Michal January 2016 (has links)
As the basis of this diploma thesis served a project of a flat house in Nezvalova Street. This flat house is designed as 7 floors high building with undergrounds garages and commercial space in the ground floor. Foundation of this building is done using reinforced concrete pilots, continued by monolithic reinforced concrete scelet. Both circumferential casing and internal walls are built using ceramic concrete blocks Porotherm, on top of which is a layer contact insulation system from EPS. Roofing of this building is done using asphalt bands into flat roof; one part of the roof is designed as “green roof” and is covered by soil substrate. This diploma thesis covers building technology preparation of construction. It includes time schedule of construction, accessibility to the building site, technical report and blueprints of building site equipment, risk plan, draft of main tools and processes for construction, instructions on how to use housing units. The main aim of this diploma thesis is around building a monolithicreinforced concrete scelet, for which a technological manual was created, control and probationary plan and blueprints of formwork for vertical and horizontal constructions. Additionally this thesis covers roofing using flat roof and asphalt belts.
300

Přístavba polyfunkčních prostor k výrobní hale - stavebně technologický projekt / Outbuilding of polyfunctional spaces for the production hall- construction technology project

Navrátil, Ondřej January 2016 (has links)
The subject thesis's topic is the technological implementation of rough upper construction's extension of the company BÖHM's polyfunctional space to technological shop floor located in district Červený Kříž in city of Jihlava. This thesis contains (includes) the implementation of the building's framework made up of ferroconcret and steel construction. The thesis namely includes the solution of the construction site equipment, the situation of the construction with the transport routes solution, the technical report, the technology study of the major technology stages, the bill of quantities and the itemized budget, the suggestion of the main lifting device, the evaluation of the main finance funds for building's construction, the technological instruction, the technical report of the construction site equipment, the schedule of work suggestion of the machine system, the control plan and test plan.

Page generated in 0.0484 seconds