• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 159
  • 40
  • 14
  • 10
  • 3
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 238
  • 238
  • 152
  • 151
  • 69
  • 52
  • 49
  • 47
  • 47
  • 45
  • 42
  • 39
  • 38
  • 37
  • 36
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
201

Obchodní centrum / Business Centre

Hándlová, Barbora January 2019 (has links)
The diploma thesis deals with design of steel structure of shopping centre, which is located in Zlín. The total ground plan‘s dimensions of the structure are 153 x 49 m. The maximum height of the building is 23,1 m. The structure of the shopping centre is formed by columns, primary and secondary beams. Floor structure is designed as composite steel and concrete structure. The roof structure, above the central part of the buildig is designed in two alternative versions. There is prepared statics calculation of the main load-bearing parts of the structure, including joints and details.
202

Skladovací areál s administrativní budovou / Storage area with administrative building

Šesták, Tomáš January 2019 (has links)
This master thesis focused on the design and elaboration of project documentation for the purpose of a storage area with an administrative building, consisting of the premises SO 01 - storage hall and SO 02 - administrative building. Objects are located on parcels no. 4006/16, 4006/17, 4006/18, 4006/19, 4006/23, 4006/24, 4006/26, 4006/27, 4006/28, 4006/29, 4006/30, 4006/31, 4006/32, in the cadastre unit Dolní Bojanovice. They are located on an investor's land. Traffic connection is provided by the exit from the car park on the local road. All engineering infrastructure engineering networks are located near the site. The design of the building respects the local zoning plan. Project documentation is prepared in accordance with the current wording of applicable laws, decrees and standards. The project solves the structure functionally divided into objects SO 01 and SO 02, which are both operationally and structurally connected. The construction of objects is statically independent. The object SO 01 is designed for the storage of building material intended for storage in dry rooms. In addition to the storage space there is the air-conditioning machine room. The SO 02 facility serves administrative and staffing facilities. In the basement of the building there are rooms of technical background and archives. The SO 01 is designed as a full-metal mounted object with a counter roof and foundation pads. The design system of the SO 01 object is columnar with steel columns. The SO 02 building is designed from a wall construction system made of aerated concrete blocks with reinforced concrete ceilings, base strips and a flat roof. The SO 01 has a 65.5x20.2 m ground plan. The perimeter shell of the building consists of assembled sandwich panels with a core of pure material. The largest ground plan dimensions of the so 02 are 26.75x10.35 m. The perimeter shell is made up of 375 mm piece concrete blocks with a 150 mm contact system.
203

Stavebně technologický projekt skladovací haly ve Zlíně / Construction Project - Implementation of Storage Hall in Zlín

Voráčová, Tereza January 2019 (has links)
The final thesis is focused on the solution of the building technology project of storage hall in Zlín. This master’s thesis includes engineering report, studies of major technological stages, solution of transport routes, project of site equipment, design of major machines and mechanisms, technological regulations for steel hall and steel fibre reinforced concrete floor, time schedule, control and test plans for steel hall and steel fibre reinforced concrete floor, budget, time and financial plan, assembly schemes for steel hall and floor assembly.
204

Obchodní galerie / Shopping gallery

Lorenc, Jakub January 2020 (has links)
The subject of this diploma thesis is the design and assessment of main load-bearing elements od the steel structure of shopping gallery in Hodonín. Part of floor plan is rectangular and rest of it is half-circled. Object's dimensions are 7é m x 147,75 m (and roof overhang 1,5 m on each side), the height of the ridge is 13,43 m and the height of the roof's dome is 22,70 m. It's a two-storey building. The load-bearing structure consist of pin-suported columns, in this case there is max. 8,5 m distance between them in direction of main frame. The distance between main frames is 9 m. The spatial rigidity of the structure is ensured with floor slabs and system of bracings. The cladding consists of sandwich panels, roof's fanlights and dome of glazed areas. Most of elements are made of S355 steel.
205

Architektonická studie sakrálního objektu Brno - Líšeň / Architectural study of the sacral object Brno - Live /Líšeň/

Malečková, Kateřina January 2020 (has links)
The topic of this diploma thesis is design processing of a new sacral building in Brno-Líšeň district. It is a plot in the middle of a panel building between the health centre building and the building of the Salesian Youth Center, so-called Salesko. The Salesian community, which will use the building the most, has been waiting for the realization of this building for many years. The key theme is the creation of spaces enabling people to meet for worship, celebrations and social events. The design is processed by two interconnected operations - the building of the Church of the Descent of the Holy Spirit and the building of clergy house. The basic composition consists of three cubic masses - the entrance, the main liturgical space and the clergy house. The bell tower is the height dominant feature which indicates the sacral function of the building. The project consists a set of buildings with two above-ground floors and a basement in the entrance part of the church. This project also mentions the solution of open spaces around the plot and their conversion into quality public areas, marginally. The sacral space is to become a place that welcomes and takes in its visitors and gives them the feeling of safety. Inside this building, people will find peace, support and undestarstanding, so they may leave with the feeling of being a better person.
206

Nové brněnské hlavní nádraží a jeho veřejná prostranství / Brno New Train Station and its Public Spaces

Velfl, Martin January 2020 (has links)
The topic discussed in Brno for several decades is certainly the building of the new main railway station and its location. Countless architectural and urban studies have been done especially in 2018, which examined three possible locations of the station. After considering the possibilities, it was decided to place a new railway station near by the Svratka river. The advantage of the chosen location is the possibility of constructing a high-speed track, which is not possible in the current position of the station. Furthermore, this area allows the construction of a station on a green field, without limiting train traffic during the works. The capacity of the new designed train station represents an increase of 30-40 thousand passengers per day. Total capacity is approximately 100,000 passengers per day. However, construction activity in the area is limited by the flood risk factor. It is an effort to eliminate this risk with elements inspired by nature. These solutions include for example widening profle of the river , determining floodplains in such a way as to maintain access to the river. The diploma thesis offers a possible view of the architectural solution of the new railway station and its public spaces. The entrance hall of the station is located at one end of the visual axis, which is represented by the considered boulevard. The dominant building on the opposite side is the Cathedral of St. Peter and Paul. The requirements and location of the new main station mean an assumption for the creation of a new city icon. The iconic vaulted structure, which runs across the railway bridge, refers to the former glory and fame of the city. The curve of catenary arch used in the profile of vault is a symbol for the new station. The new station represents a significant impulse not only for the development of Brno, but especially for the development of new South district. The construction of the trade fairs complex a hundred years ago had a similer effect.
207

Sportovní centrum Brno / Sport Centre Brno

Havlíková, Terezie January 2013 (has links)
The theme of my dissertation is to create the architectural study of a football stadium in Brno behind Lužánky. The proposed stadium is to create facilities for football Brno, athletes and fans. Stadium capacity is 23 thousands audience. Object is an organic shape and is forming two main parts. The first part of the concrete superstructuce and second is a steel structure carrying a transparent facade composed of ETFE foil.
208

Objekt pro sportovní účely / Building for sport purposes

Navrátil, Petr January 2013 (has links)
The theme of this diploma thesis is design and check load-carrying steel structure of building for sport purposes in two variants. Building is situated in Holešov town. Primary emphasis is placed on purpose of this building and on her integration to the given locality. The steel structure is created by two objels, main (hall) and side part (admin. part). Both of this building have common east wall. Plan dimension of hall part is 40 on 40m and the highest point of this part is 15,9m height above ground. Admin. part is greated like frame with columns in 8x8m grid and 8m height. Overall height of this part is 8m. For analisys of internal forces was constructed spatial bar model which was used for an optimization of partial bars for both limit states. The cladding will be made by system of Kingspan panels.
209

Planetárium / Planetarium

Sokolová, Eva January 2013 (has links)
The master’s thesis object is to create a design of a load carrying steel structure planetarium. Its ground plan dimensions are 36,1 x 49,0 m. The planetarium hall’s roof is designed with system of trusses and purlins. The projection hall’s roof consists of ribbed cupola with radially arched ribs. The stiffness of the whole construction is ensured with bracings. The walls of the whole object are composed of columns, rails and bracings.
210

Curlingová hala / Curling building

Nováková, Hana January 2013 (has links)
Design of load bearing steel structure of a curling building. Examination of main load bearing building blocks. Examination of selected details. Drawing of disposition and selected details. Elaboration of manufactory drawings of chosen segments.

Page generated in 0.0703 seconds