• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Dagvattenfördröjning inom två kvarter och omkringliggande allmän platsmark i Täby Park : Flödesmätning, modellering och utvärdering av fördröjningsåtgärder / Stormwater detention within a neighborhood in Täby Park : Flow measurements, modeling and an evaluation of detention measures

Zaff, Sandra January 2021 (has links)
När samhällen byggs ut och mer genomsläpplig naturmark ersätts av hårdgjorda ytor ökar också mängden dagvatten. Dagvatten är regn eller smältvatten från snö och is som rinner av ytor så som tak, vägar och andra hårda ytor som skapats av människor. Dagvatten kan orsaka stora problem, exempelvis översvämningar och utsläpp av föroreningar till sjöar och vattendrag. För att förebygga dessa problem har många kommuner tagit fram dagvattenstrategier med krav och riktlinjer för hur dagvattnet ska tas hand om på bästa hållbara sätt. Ett exempel på hållbar dagvattenhantering är så kallad trög avrinning, det vill säga olika lösningar för att fördröja dagvattnet med syftet att undvika stora flöden och rena vattnet från föroreningar.  En av kommunerna som tagit fram en strategi för dagvattenhanteringen är Täby kommun. Denna dagvattenstrategi används som underlag vid planering av exploatering av områden, till exempel vid byggnation av bostadsområden. I det nya bostadsområdet Täby Park i Täby har två kvarter anlagts med lösningar för dagvattenhanteringen efter dagvattenutredningar utförda av Structor Uppsala. Det här projektet ämnade att undersöka om de lösningar som föreslogs för och sedan implementerades i de två kvarteren uppnådde Täby kommuns krav på dagvattenhantering. Kvarteren som undersöktes, vilka benämns kvarter 1:6 Opalen och kvarter 1:7 Klövern, var av liknande storlek och med liknande dagvattenlösningar. För att undersöka dagvattenflödet utfördes flödes- och nederbördsmätningar under en månads tid och en modell ställdes upp i Autodesk Storm and Sanitary Analysis för att simulera vattenflödet. Beräkningar baserade på samma metod som i dagvattenutredningen utfördes även för den slutgiltiga utformningen av respektive kvarter.  Till följd av små regnmängder samt en initial felprogrammering av en flödesmätare behövde datat från flödesmätarna bearbetas för att få fram ett resultat för fördröjningen i samband med regnhändelserna. Dessutom behövde en av flödesmätarnas data bortses från på grund av felaktiga värden, vilket innebar att det uppmätta dagvattenflödet endast speglade ungefär halva utredningsområdet. Fördröjningen mellan regnets inträffande och flödesmätarnas utslag kunde inte fastsällas som ett resultat av dagvattenlösningarnas implementering, till stor del på grund av bristande data. Dagvattenflödena som beräknades utifrån mätdatat, teoretiskt och med modellen skildes åt, men även här övervägande på grund av felkällor och bristande data. Fortsatt undersökning för modellens optimering och fler mätningar skulle kunna ge en bättre korrelation för både fördröjningen i tid (regnhändelse och flödesmätares utslag) och fördröjningen i volym som fördröjningsåtgärderna bidrar med. / When urbanization increases, one consequence of permeable land being replaced by impermeable surfaces is an increase in stormwater. Stormwater, which is water from rain or melted snow and ice that runs off from impermeable surfaces such as roofs and roads, can cause problems for infrastructure. Some of these problems entail flooding and transport of pollutants to lakes and rivers. To counteract these issues, many Swedish municipalities have compiled so called stormwater strategies (''dagvattenstrategier'') containing requirements and guidelines on how to sustainably manage stormwater. One method for sustainable stormwater management is stormwater detention, i.e. slowing down the water, which can be achieved in several ways. Through detention, large flows can be reduced and pollutants can be filtered out of the water. The municipality of Täby is one of the above mentioned municipalities with stormwater strategies. This strategy is used by exploiters when planning, for instance, new residential areas, as a mean to ensure that the stormwater is properly taken care of within the boundaries of the premise. Two apartment blocks in Täby Park, a newly built residential area in Täby, have been built with detention measures for stormwater management suggested by Structor Uppsala in their stormwater investigations for both blocks respectively. The aim of this project was to investigate whether the suggested detention measures were enough to reach the requirements in Täby's stormwater strategy. The studied apartment blocks were of similar size and had approximately the same fraction of stormwater detention measures. During the project time, precipitation and stormwater flow were measured for approximately a month and a model was made in Autodesk Storm and Sanitary Analysis to simulate the flow in the project area. Calculations for the water flow in the project were made with the rational method, which was used for the calculations done in Structor Uppsala's stormwater investigation.  As a result of little precipitation during the period of measurements, and an unfortunate initial error in a flow meter, the data from the flow measurements needed to be modified to get the resulting relationship between rain events and the detention of stormwater within the project area. An additional error came from false values from one of the flow meters, which led to it and it's data to become discarded and thus only giving the stormwater flow for roughly half of the project area. From the results a certain time delay between rain event and stormwater flow was seen. However, this could not be determined to be solely from the detention measures due to insufficient data. The stormwater flows calculated from the measured data, the theoretical calculations, and the model were significantly different. Here, the sources of error and insufficient data were certainly a contributing factor. Continued studies with an optimization of the model and more measurements could give a better correlation between the time delay between rain event and flow and the flow detention from the stormwater measures.

Page generated in 0.111 seconds