• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 28
  • 3
  • 1
  • 1
  • Tagged with
  • 43
  • 43
  • 14
  • 14
  • 14
  • 13
  • 10
  • 10
  • 7
  • 7
  • 7
  • 6
  • 6
  • 6
  • 6
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
41

Effluent Water Quality Improvement Using Silt Fences And Stormwater Harvesting

Gogo-Abite, Ikiensinma 01 January 2012 (has links)
Construction sites are among the most common areas to experience soil erosion and sediment transport due to the mandatory foundation tasks such as excavation and land grubbing. Thus, temporary sediment barriers are installed along the perimeter to prevent sediment transport from the site. Erosion and sediment transport control measures may include, but not limited to, physical and chemical processes such as the use of a silt fence and polyacrylamide product. Runoff from construction sites and other impervious surfaces are routinely discharged into ponds for treatment before being released into a receiving water body. Stormwater harvesting from a pond for irrigation of adjacent lands is promoted as one approach to reducing pond discharge while supplementing valuable potable water used for irrigation. The reduction of pond discharge reduces the mass of pollutants in the discharge. In the dissertation, presented is the investigation of the effectiveness of temporary sediment barriers and then, development of a modeling approach to a stormwater harvesting pond to provide a comprehensive stormwater management pollution reduction assessment tool. The first part of the research presents the investigation of the performance efficiencies of silt fence fabrics in turbidity and sediment concentration removal, and the determination of flowthrough-rate on simulated construction sites in real time. Two silt fence fabrics, (1) woven and the other (2) nonwoven were subjected to material index property tests and a series of field-scale tests with different rainfall intensities and events for different embankment slopes on a tilting test-bed. Collected influent and effluent samples were analyzed for sediment concentration and turbidity, and the flow-through-rate for each fabric was evaluated. Test results revealed that the woven and nonwoven silt fence achieved 11 and 56 percent average turbidity reduction iv efficiency, respectively. Each fabric also achieved 20 and 56 percent average sediment concentration removal efficiency, respectively. Fabric flow-through-rates were functions of the rainfall intensity and embankment slope. The nonwoven fabric exhibited higher flow-throughrates than the woven fabric in both field-scale and laboratory tests. In the second part of the study, a Stormwater Harvesting and Assessment for Reduction of Pollution (SHARP) model was developed to predict operation of wet pond used for stormwater harvesting. The model integrates the interaction of surface water and groundwater in a catchment area. The SHARP model was calibrated and validated with actual pond water elevation data from a stormwater pond at Miramar Lakes, Miramar, Florida. Model evaluation showed adequate prediction of pond water elevation with root mean square error between 0.07 and 0.12 m; mean absolute error was between 0.018 and 0.07 m; and relative index of agreement was between 0.74 and 0.98 for both calibration and validation periods. The SHARP model is capable of assessing harvesting safe-yield and discharge from a pond, including the prediction of the percentage of runoff into a harvesting pond that is not discharged. The combination of silt fence and/or polyacrylamide PAM before stormwater harvesting pond in a treatment train for the reduction of pollutants from construction sites has the potential of significantly exceeding a performance standard of 85 percent reduction typically required by local authorities. In fact, the stringent requirement of equaling pre- and post-development pollutant loading is highly achievable by the treatment train approach. The significant contribution from the integration of the SHARP model to the treatment train is that real-time assessment of pollutant loading reduction by volume can be planned and controlled to achieve target performance standards.
42

The feasibility of rainwater and stormwater harvesting within a winter rainfall climate context: a commercial building focus

Viljoen, Nina Susara 18 November 2014 (has links)
Cape Town, South Africa, falls within a winter rainfall region, making it difficult to assess the feasibility of rain- and stormwater harvesting. The reason for this is because the region’s high water demand period coincides with the low rainfall summer season, thereby limiting the availability of this alternative water resource when most needed. During this study, rainwater harvesting for toilet flushing purposes, collected from roof surfaces, was practically assessed by means of inserted flow meters at a pilot study site in Kommetjie, Cape Town. The combined and single system roof- and land surface runoff yields and savings of commercial buildings within the Kommetjie business area, were also theoretically assessed by making use of a mathematical roof- and land surface runoff model specifically developed during this study. The statistical testing of the hypotheses statements relating to the pre- and post-harvesting savings at the pilot study building, compared against the average actual municipal water usage, were performed. Hypotheses testing were also performed in order to compare the theoretical rain- and stormwater runoff yields for the commercial business area against the average actual municipal water consumption. The conclusions drawn from this study indicated that valuable potable water, as well as related financial savings, can be achieved within a winter rainfall region, thereby making rain- and stormwater harvesting a feasible option for commercial businesses in Cape Town. / Environmental Sciences / M.Sc. (Environmental Management)
43

The feasibility of rainwater and stormwater harvesting within a winter rainfall climate context: a commercial building focus

Viljoen, Nina Susara 18 November 2014 (has links)
Cape Town, South Africa, falls within a winter rainfall region, making it difficult to assess the feasibility of rain- and stormwater harvesting. The reason for this is because the region’s high water demand period coincides with the low rainfall summer season, thereby limiting the availability of this alternative water resource when most needed. During this study, rainwater harvesting for toilet flushing purposes, collected from roof surfaces, was practically assessed by means of inserted flow meters at a pilot study site in Kommetjie, Cape Town. The combined and single system roof- and land surface runoff yields and savings of commercial buildings within the Kommetjie business area, were also theoretically assessed by making use of a mathematical roof- and land surface runoff model specifically developed during this study. The statistical testing of the hypotheses statements relating to the pre- and post-harvesting savings at the pilot study building, compared against the average actual municipal water usage, were performed. Hypotheses testing were also performed in order to compare the theoretical rain- and stormwater runoff yields for the commercial business area against the average actual municipal water consumption. The conclusions drawn from this study indicated that valuable potable water, as well as related financial savings, can be achieved within a winter rainfall region, thereby making rain- and stormwater harvesting a feasible option for commercial businesses in Cape Town. / Environmental Sciences / M.Sc. (Environmental Management)