Spelling suggestions: "subject:"8trategic planning -- botswana."" "subject:"8trategic planning -- motswana.""
1 |
Role of knowledge management enablers in facilitating knowledge management practices in selected private higher education institutions in BotswanaMakambe, Ushe 02 1900 (has links)
This research was set out to investigate the role of knowledge management as a coping strategy for PHE institutions in Botswana, especially given that they operate in a highly regulated environment. One of the major drivers of volatility in the educational sector is
intensely volatile regulatory environment in which the institutions operate. Further, a large portion of the stakeholder community of these institutions hold a strong believe that these institutions offer poor quality education to maximise profit. The primary objective of this
study is therefore to determine the role of knowledge management (KM) enablers in facilitating KM practices in selected PHE institutions in Botswana that operate in this highly regulated environment and to develop a model for effective KM in these institutions. The study adopted a survey research design and collected quantitative data through a structured self-administered questionnaire and document reviews. The subjects comprised all five degree-awarding PHE institutions, which were strictly regulated by the Tertiary
Education Council (TEC). The population surveyed came to 670 and sample size was 350. Data was analysed through various statistical measures such as Structural Equation Modelling (SEM) in the form of Analysis of Variance (ANOVA), multiple regression analysis, and Chi-square test. The results of the study revealed that KM enablers were playing an insignificant role in facilitating KM practices in selected PHE institutions in Botswana. Results of the study can be generalised to similar institutions elsewhere operating in similar environments. In order to enhance KM practices in PHE institutions, it is recommended that the institutions adopt a systematic approach to KM, establish an organisational culture and structure that promote KM practices, and enhance the quality of their human capital including leadership. It should be noted that the state of KM in organisations operating in an uncertain environment can be enhanced if the leadership carefully controls the family-owned setting and organisational culture as these factors can detract from the organisation’s effective practising of KM. However, strategic leadership, organisational structure, and the role played by stakeholders played positive deterministic factors in ensuring an enhanced KM drive. / Business Management / D.Admin. (Business Management)
|
2 |
Stakeholder involvement in strategic planning: a strategy to mitigate the effects of HIV and AIDS on secondary education in BotswanaMgomezulu, Victor Yobe 30 November 2007 (has links)
Stakeholder involvement in strategic planning: a strategy to mitigate the effects of HIV and AIDS on secondary education in Botswana.
This study explores the involvement of stakeholders in strategic planning to mitigate the effect of HIV and AIDS in secondary education in Botswana. The prevalence of HIV and AIDS-related illness and deaths is high in Botswana and affects both teachers and learners. Education provision has been affected through increased mortality and morbidity and increased absenteeism which affect education-related personnel and the demand for education has been reduced due to growing numbers of orphaned and vulnerable children as a consequence of parent/guardian mortality and morbidity related to HIV and AIDS. The problem was investigated by means of a literature review and an empirical inquiry which combined quantitative and qualitative data collection. Based on the findings, in addition to medical and other interventions, an education management approach is required to mitigate the effects of HIV and AIDS on secondary education in Botswana. The strategies of coping, caring and preventing have been effective in this regard. Some internal stakeholders of the Department of Secondary Education (DSE) are not meaningfully involved in strategic planning. Similarly, most of the selected external stakeholders were not involved in the DSE HIV and AIDS strategic plan. Both external and internal stakeholders should be involved at all stages of planning. Furthermore, inducement-contribution exchanges and teacher credibility should be considered in a strategic plan. To improve the current DSE strategic plan, a stakeholder involvement model to involve internal and external stakeholders was designed. Based on this model and the above findings, recommendations for practice and suggestions for future research are made. / Educational Studies / D.Ed.(Educational Management)
|
3 |
Stakeholder involvement in strategic planning: a strategy to mitigate the effects of HIV and AIDS on secondary education in BotswanaMgomezulu, Victor Yobe 30 November 2007 (has links)
Stakeholder involvement in strategic planning: a strategy to mitigate the effects of HIV and AIDS on secondary education in Botswana.
This study explores the involvement of stakeholders in strategic planning to mitigate the effect of HIV and AIDS in secondary education in Botswana. The prevalence of HIV and AIDS-related illness and deaths is high in Botswana and affects both teachers and learners. Education provision has been affected through increased mortality and morbidity and increased absenteeism which affect education-related personnel and the demand for education has been reduced due to growing numbers of orphaned and vulnerable children as a consequence of parent/guardian mortality and morbidity related to HIV and AIDS. The problem was investigated by means of a literature review and an empirical inquiry which combined quantitative and qualitative data collection. Based on the findings, in addition to medical and other interventions, an education management approach is required to mitigate the effects of HIV and AIDS on secondary education in Botswana. The strategies of coping, caring and preventing have been effective in this regard. Some internal stakeholders of the Department of Secondary Education (DSE) are not meaningfully involved in strategic planning. Similarly, most of the selected external stakeholders were not involved in the DSE HIV and AIDS strategic plan. Both external and internal stakeholders should be involved at all stages of planning. Furthermore, inducement-contribution exchanges and teacher credibility should be considered in a strategic plan. To improve the current DSE strategic plan, a stakeholder involvement model to involve internal and external stakeholders was designed. Based on this model and the above findings, recommendations for practice and suggestions for future research are made. / Educational Studies / D.Ed.(Educational Management)
|
Page generated in 0.0801 seconds