• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 26
  • 1
  • Tagged with
  • 28
  • 28
  • 14
  • 13
  • 13
  • 13
  • 8
  • 8
  • 7
  • 7
  • 7
  • 6
  • 6
  • 6
  • 6
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Sistema para localização de faltas em linhas de transmissão com subestações conectadas em derivação. / Fault location system for multi-terminal transmission lines.

Giovanni Manassero Junior 17 October 2006 (has links)
Este trabalho tem por objetivo apresentar o desenvolvimento e a implementacao em uma rotina computacional, de algoritmos para a localizacao de faltas em linhas de transmissao com subestacoes conectadas em derivacao. Os algoritmos propostos neste trabalho integram uma metodologia para localizacao de faltas, que e capaz de identificar corretamente o ponto de ocorrencia do defeito utilizando as componentes de fase dos fasores de tensoes e correntes, calculadas atraves dos registros desses sinais, efetuados por oscilografos digitais e/ou reles de protecao instalados nos terminais da linha de transmissao. Alem disso, a metodologia para localizacao de faltas tem acesso aos parametros eletricos da linha e informacoes sobre o tipo de ligacao e o carregamento dos transformadores conectados aos terminais das derivacoes. Este trabalho apresenta tambem o desenvolvimento dos modelos para os elementos do sistema de transmissao, em componentes de fase. Estes modelos sao utilizados pelos algoritmos que integram a metodologia para localizacao de faltas. / This research presents the development and implementation in a computational routine, of algorithms for fault location in multi-terminal transmission lines. The algorithms proposed in this work are part of a fault location methodology, which is capable of correctly identifying the fault point based on voltage and current phase components. The voltage and current phasors are calculated using measurements of voltage and current signals from intelligent electronic devices, located on the transmission line terminals. The algorithms have access to the electrical parameters of the transmission lines and to information about the transformers loading and their connection type. This work also presents the development of phase component models for the transmission system elements used by the fault location algorithms, that are part of the fault location methodology.
12

Metodologia para atendimento de novas cargas em sistemas de distribuição de energia elétrica. / Methodology for assessing the impact for new loads in eletric power distribution systems.

Elvis Richard Tello Ortíz 31 March 2009 (has links)
Nos países em desenvolvimento, como o Brasil, novos requerimentos de conexão às redes elétricas são solicitados constantemente como conseqüência do crescimento econômico e da conseqüente expansão da rede elétrica. Uma empresa distribuidora que atenda a uma cidade de grande porte recebe a cada mês um elevado número de solicitações de conexão de novas cargas. Assim, um dos principais desafios das áreas de projeto das empresas distribuidoras é encontrar a melhor forma, tanto técnica como economicamente, de atender a estas solicitações. Devido ao volume do trabalho envolvido, bem como à escassez de dados detalhados da rede elétrica, a prática convencional estabelece filtros para reduzir o número de estudos associados às novas cargas. Normalmente, estes filtros são baseados em um valor limite de demanda máxima. Se a nova carga possui uma demanda máxima inferior ao limite, a nova carga é ligada diretamente, sem a execução de estudos elétricos. Se, por outro lado, a demanda máxima da nova carga excede o limite, então um estudo detalhado é iniciado. Esta prática pode levar a duas decisões equivocadas por parte da empresa: (i) não-execução de um estudo quando ele era necessário, e (ii) execução de um estudo desnecessariamente. A situação de escassez de dados detalhados está mudando rapidamente nos últimos anos no mundo da distribuição de energia elétrica. Há atualmente poderosos sistemas geo-referenciados que permitem associar cada elemento da rede elétrica a uma posição geográfica bem definida. Além disso, estes sistemas contam com o apoio de bases de dados que possuem recursos para cadastrar e administrar o enorme volume de dados associados às redes de distribuição de energia elétrica. Esta nova realidade conduz naturalmente ao desenvolvimento de modelos mais sofisticados que permitem aprimorar muito a qualidade dos serviços prestados pelas empresas distribuidoras. Este trabalho propõe, desenvolve e implementa uma nova metodologia de apoio à decisão no que se refere à ligação de novas cargas em redes de distribuição de energia elétrica. A metodologia está baseada no conceito inovador de folga de potência, estabelecido no âmbito deste trabalho, pelo qual calcula-se a priori e em cada ponto da rede a máxima carga que pode ser conectada sem que os critérios técnicos, de tensão mínima e máximo carregamento, sejam transgredidos. A natureza da metodologia proposta elimina automaticamente a possibilidade de ocorrência das duas decisões equivocadas comentadas anteriormente. A utilização da metodologia desenvolvida é ilustrada através de diversos exemplos de aplicação que utilizam redes reais de distribuição, em baixa e média tensão. / Economic growth and the associated expansion of the electrical power system naturally lead to a large number of new loads being connected to the existing network. As a consequence, one of the main challenges faced by the design areas in electrical utilities refers to the problem of finding the best solution among various alternatives for connecting a new load, from both technical and economic viewpoints. Owing to the large size of the problem, and also to the lack of detailed data associated with distribution systems, electrical utilities adopted in the past a few filtering techniques so as to reduce the amount of work to reasonable levels. These filters usually define a limit for the maximum demand declared by a new customer. If the required maximum demand does not exceed the limit, the new load is connected straight away without carrying out any electrical study. On the other hand, when the maximum demand does exceed this limit, a detailed analysis is executed. Despite the savings brought about by this technique, it may lead to two potentially wrong decisions: (i) overseeing a detailed analysis when it is needed, and (ii) carrying out a study when it is not necessary. Concerning the lack of detailed data, fortunately this situation has been improving rapidly in the last few years. Currently, there exist powerful georreferenced systems capable of associating every component of the electrical system with a well-defined geographical location. These systems usually rely on supporting databases which allow efficient management of the huge amount of data normally associated with distribution networks. This new standpoint naturally leads to the development of more sophisticated models which allow considerable improvements on the quality of services offered by the utilities. This work presents a new methodology aimed at supporting the decision-making process regarding the connection of new loads in electrical distribution networks. The methodology is based upon the innovative concept of capacity margin, established within this work, by which the maximum load that can be connected to any given point is computed in advance in offline mode. The criteria for finding the maximum load are based on the common requirements of minimum voltage and maximum loading. The proposed methodology automatically eliminates the two wrong decisions mentioned above. The application of the proposed methodology is illustrated through various examples which use real distribution networks, at both low and medium voltage levels.
13

Protótipo de um conjunto de sistemas especialistas para operação, monitoração e manutenção de subestações. / Expert systems for substation operation, supervision and monitoring and maintenance.

Jose Aquiles Baesso Grimoni 27 April 1994 (has links)
O trabalho apresenta o protótipo de um conjunto de sistemas especialistas para o auxílio na operação, monitoração e a avaliação do desempenho da manutenção de uma subestação de energia. Os sistemas especialistas propostos têm como objetivos básicos: o tratamento de alarmes da subestação, para depuração e triagem dos mesmos durante perturbações facilitando a análise e ações do operador; a localização de defeitos através da iteração entre alarmes gerados (fatos), regras que relacionam alarmes a causas (base de conhecimento) e a estrutura que relaciona este conjunto de regras (máquina de inferência); a reconfiguração da subestação para transferência de cargas entre circuitos através de um conjunto de manobras gerados por algoritmos de busca e de regras ligadas aos limites das grandezas elétricas dos equipamentos da rede; e ainda a análise do desempenho da manutenção baseada no conceito de índice de mérito operativo aplicado a subestações. O protótipo prevê o desenvolvimento utilizando a linguagem PROLOG, que é voltada para o tratamento declarativo de informações. Foram utilizados dados de uma subestação de uma empresa concessionária de energia para que se pudesse avaliar melhor o desenvolvimento das bases de conhecimento e da própria arquitetura do conjunto e de sua comunicação. Os testes efetuados mostraram resultados promissores e com grau de acerto elevado, o que indica que o sistema desenvolvido, é um embrião confiável para maiores sofisticações. O trabalho termina por apresentar estas novas possibilidades de aperfeiçoamento do sistema. / This work presents a set of expert systems for operation , supervision and maintenance of a electrical energy substation. The function performed by the expert systems presented here are: alarm processing, fault diagnosis, reconfiguration and the analysis of the maintenance performance. The system was developed in PROLOG language. Substation characteristics, data and information has been provided by a São Paulo utility company. The knowledge basis for the expert systems was developed with basis in such information. Tests were carried out to verify this system performance including the architecture and communication. The results are very promising and with a high level of confidence, which means that this system can be used as a seed for future improvement. The work ends by suggesting such improvements and new applications.
14

MODELAGEM DOS SISTEMAS DE PROTEÇÃO E FALHAS DE UMA SUBESTAÇÃO DE DISTRIBUIÇÃO UTILIZANDO REDES DE PETRI

Bucchianeri, Juliano Resende 11 September 2018 (has links)
Submitted by admin tede (tede@pucgoias.edu.br) on 2018-11-08T18:17:38Z No. of bitstreams: 1 JULIANO RESENDE BUCCHIANDERI.pdf: 6086819 bytes, checksum: ec188a1a0edcce38757a6e0f604df66d (MD5) / Made available in DSpace on 2018-11-08T18:17:38Z (GMT). No. of bitstreams: 1 JULIANO RESENDE BUCCHIANDERI.pdf: 6086819 bytes, checksum: ec188a1a0edcce38757a6e0f604df66d (MD5) Previous issue date: 2018-09-11 / The appropriated and secure supply of electrical energy directly impacts on the present society. The increase in demand favors the growth of electrical systems, especially in distribution networks and substations, since they are responsible for lowering the electrical voltage, allowing energy distribution to the population. To keep distribution networks and substations running, without interruption or discontinuity, is utmost importance for the maintenance of electric power supply, and it is necessary to implement means to locate and improve the electrical protections in order to reduce failures or to suspend the electricity distribution. Distribution failures may result from lightning, overcurrent, short circuits, overvoltages, oil leakage on transformers, impedance failure etc. The present work presents the problem of possible defects that result in the substation power blackout, and aims to reduce the amount and frequency of substation power blackouts, contributing to the increase in industrial production. In this regard, qualitative and quantitative models using Petri nets of an electrical substation of distribution were developed, using simulation scenarios to indicate possible improvements in the electrical protections, reducing the inaccuracies and interruptions. / O fornecimento adequado e seguro de energia elétrica impacta diretamente na sociedade atual. O aumento da demanda torna favorável o crescimento dos sistemas de eletricidade, sobretudo nas redes e subestações de distribuição, pois estas são responsáveis por rebaixar a tensão elétrica, permitindo assim distribuição de energia para a população. Manter as redes e subestações de distribuição funcionando, sem interrupções ou descontinuidade, é de suma importância para a manutenção do fornecimento de eletricidade, sendo necessário implementar meios para localizar e melhorar as proteções elétricas afim de diminuir as falhas ou a suspensão da distribuição desta. As falhas da distribuição podem resultar de descargas atmosféricas, sobrecorrente, curtoscircuitos, sobretensões, vazamento de óleo nos transformadores, falha de impedância etc. O presente trabalho expõe o problema dos possíveis defeitos que resultam no desligamento da subestação e objetiva reduzir a quantidade e a frequência dos desligamentos da subestação, colaborando para o aumento na produção industrial. Para isso, desenvolveu modelos qualitativos e quantitativos utilizando redes de Petri de uma subestação elétrica de distribuição, utilizando cenários de simulação para apontar possíveis melhorias nas proteções diminuindo as incorreções e interrupções.
15

Metodologia para atendimento de novas cargas em sistemas de distribuição de energia elétrica. / Methodology for assessing the impact for new loads in eletric power distribution systems.

Tello Ortíz, Elvis Richard 31 March 2009 (has links)
Nos países em desenvolvimento, como o Brasil, novos requerimentos de conexão às redes elétricas são solicitados constantemente como conseqüência do crescimento econômico e da conseqüente expansão da rede elétrica. Uma empresa distribuidora que atenda a uma cidade de grande porte recebe a cada mês um elevado número de solicitações de conexão de novas cargas. Assim, um dos principais desafios das áreas de projeto das empresas distribuidoras é encontrar a melhor forma, tanto técnica como economicamente, de atender a estas solicitações. Devido ao volume do trabalho envolvido, bem como à escassez de dados detalhados da rede elétrica, a prática convencional estabelece filtros para reduzir o número de estudos associados às novas cargas. Normalmente, estes filtros são baseados em um valor limite de demanda máxima. Se a nova carga possui uma demanda máxima inferior ao limite, a nova carga é ligada diretamente, sem a execução de estudos elétricos. Se, por outro lado, a demanda máxima da nova carga excede o limite, então um estudo detalhado é iniciado. Esta prática pode levar a duas decisões equivocadas por parte da empresa: (i) não-execução de um estudo quando ele era necessário, e (ii) execução de um estudo desnecessariamente. A situação de escassez de dados detalhados está mudando rapidamente nos últimos anos no mundo da distribuição de energia elétrica. Há atualmente poderosos sistemas geo-referenciados que permitem associar cada elemento da rede elétrica a uma posição geográfica bem definida. Além disso, estes sistemas contam com o apoio de bases de dados que possuem recursos para cadastrar e administrar o enorme volume de dados associados às redes de distribuição de energia elétrica. Esta nova realidade conduz naturalmente ao desenvolvimento de modelos mais sofisticados que permitem aprimorar muito a qualidade dos serviços prestados pelas empresas distribuidoras. Este trabalho propõe, desenvolve e implementa uma nova metodologia de apoio à decisão no que se refere à ligação de novas cargas em redes de distribuição de energia elétrica. A metodologia está baseada no conceito inovador de folga de potência, estabelecido no âmbito deste trabalho, pelo qual calcula-se a priori e em cada ponto da rede a máxima carga que pode ser conectada sem que os critérios técnicos, de tensão mínima e máximo carregamento, sejam transgredidos. A natureza da metodologia proposta elimina automaticamente a possibilidade de ocorrência das duas decisões equivocadas comentadas anteriormente. A utilização da metodologia desenvolvida é ilustrada através de diversos exemplos de aplicação que utilizam redes reais de distribuição, em baixa e média tensão. / Economic growth and the associated expansion of the electrical power system naturally lead to a large number of new loads being connected to the existing network. As a consequence, one of the main challenges faced by the design areas in electrical utilities refers to the problem of finding the best solution among various alternatives for connecting a new load, from both technical and economic viewpoints. Owing to the large size of the problem, and also to the lack of detailed data associated with distribution systems, electrical utilities adopted in the past a few filtering techniques so as to reduce the amount of work to reasonable levels. These filters usually define a limit for the maximum demand declared by a new customer. If the required maximum demand does not exceed the limit, the new load is connected straight away without carrying out any electrical study. On the other hand, when the maximum demand does exceed this limit, a detailed analysis is executed. Despite the savings brought about by this technique, it may lead to two potentially wrong decisions: (i) overseeing a detailed analysis when it is needed, and (ii) carrying out a study when it is not necessary. Concerning the lack of detailed data, fortunately this situation has been improving rapidly in the last few years. Currently, there exist powerful georreferenced systems capable of associating every component of the electrical system with a well-defined geographical location. These systems usually rely on supporting databases which allow efficient management of the huge amount of data normally associated with distribution networks. This new standpoint naturally leads to the development of more sophisticated models which allow considerable improvements on the quality of services offered by the utilities. This work presents a new methodology aimed at supporting the decision-making process regarding the connection of new loads in electrical distribution networks. The methodology is based upon the innovative concept of capacity margin, established within this work, by which the maximum load that can be connected to any given point is computed in advance in offline mode. The criteria for finding the maximum load are based on the common requirements of minimum voltage and maximum loading. The proposed methodology automatically eliminates the two wrong decisions mentioned above. The application of the proposed methodology is illustrated through various examples which use real distribution networks, at both low and medium voltage levels.
16

Emerging technologies and future trends in substation automation systems for the protection, monitoring and control of electrical substations

Morais, Bruno Tiago Pires January 2013 (has links)
Tese de Mestrado Integrado. Engenharia Electrotécnica e de Computadores (Automação). Faculdade de Engenharia. Universidade do Porto. 2013
17

Modelo em escala reduzida ao ar livre como ferramenta de validação de simulação computacional de barreiras acústicas / Scale outdoor models as validation tool for computer simulation of noise barriers

Lisot, Aline, 1980- 08 September 2013 (has links)
Orientador: Stelamaris Rolla Bertoli / Tese (doutorado) - Universidade Estadual de Campinas, Faculdade de Engenharia Civil, Arquitetura e Urbanismo / Made available in DSpace on 2018-08-23T15:55:45Z (GMT). No. of bitstreams: 1 Lisot_Aline_D.pdf: 22929481 bytes, checksum: b4a8e502fe551c84db705e90815efafe (MD5) Previous issue date: 2013 / Resumo: As barreiras acústicas têm sido empregadas como soluções de mitigação de ruído ambiental. O estudo sobre desempenho de barreiras acústicas é comumente realizado por meio de simulações computacionais em programas específicos de propagação sonora. Testes de modelos em escala reduzida efetuados em câmara anecóica também são ferramentas empregadas neste tipo de avaliação e podem auxiliar na validação do modelo computacional elaborado. A restrição de acesso a câmaras anecóicas e as grandes dimensões de algumas fontes sonoras, como é o caso de subestações elétricas, podem impossibilitar a realização de ensaios em tais câmaras e conduzir aos testes de modelos reduzidos ao ar livre. Estes testes são praticamente inexistentes na literatura, o que confere caráter original à pesquisa apresentada neste trabalho. No caso de subestações elétricas que porventura sejam causadoras de perturbação sonora no seu entorno, assinala-se a impossibilidade de implementação de soluções mitigadoras para posterior validação da solução empregada. Tal restrição ocorre devido, principalmente, à complexidade e às dimensões da fonte. Em casos como o mencionado, é indispensável um estudo prévio da solução mitigadora, o que pode ser feito por meio de simulações computacionais validadas através de modelos em escala reduzida. O presente trabalho tem por objetivo a verificação da viabilidade de utilização de modelos em escala reduzida ao ar livre como ferramenta de validação de simulação computacional de barreiras acústicas. De caráter experimental e cunho exploratório, o trabalho buscou validar modelo de barreira acústica em escala reduzida ao ar livre para teste de propagação sonora em subestação elétrica. A metodologia envolveu a caracterização da fonte sonora em questão, a construção e teste de modelo e a modelagem/simulação computacional da situação reproduzida em escala reduzida com o programa SoundPLAN 6.4®. Os resultados dos testes em escala reduzida foram empregados para validação de simulação computacional de barreira acústica. Concluiu-se que é possível utilizar modelos reduzidos para tal fim, porém, é necessário que se avalie as condições do entorno durante os ensaios. Dentre as características do entorno a serem avaliadas, citam-se as variáveis climáticas no momento da medição, o ruído de fundo do local, a topografia, o tipo de solo e a presença de vegetação e de edificações. Tais informações podem auxiliar na obtenção de resultados fidedignos e, desta forma, garantir o futuro desempenho de soluções mitigadoras de ruído por meio da utilização de modelos em escala reduzida para validação de simulação computacional / Abstract: Noise barriers have been used as solutions to mitigate environmental noise. The study on performance of noise barriers is commonly accomplished through computer simulations with the specific sound propagation software. Tests of reduced scale models made in anechoic chamber are also tools used in this type of evaluation and can assist in validating the developed computer model. The restriction of access to anechoic chambers and the large dimensions of certain sources, such as electrical substations, may not allow tests in these chambers and lead to reduced model tests outdoors. These tests are practically nonexistent in the literature, which gives unique character to the research presented in this work. In the case of electrical substations that may be causing noise disturbance in their surroundings, it is pointed out the impossibility of implementing mitigation solutions to post-validate the solution employed. This restriction is due mainly to the complexity and size of the source. In similar cases, it is necessary a previous study on mitigation solutions, which may be done by way of computer simulations validated through reduced scale models. This work aims to verify the feasibility of using reduced scale outdoor models as a tool for validation of computer simulation of noise barriers. On the basis of experimental approach and exploratory nature, the application to the sound propagation in electrical substations is considered. The methodology involves the characterization of the sound source in question, the construction and testing of reduced scale model and modeling/simulation of the situation reproduced on a reduced scale with the software SoundPLAN 6.4®. The results of tests with scale outdoor model were used to validate computer simulation of acoustic barrier. It was concluded that it is possible to use reduced models for this purpose; however, it is necessary to evaluate the conditions of the environment during the tests. Among the characteristics of the environment to be evaluated, climatic variables at the time of measurement, background noise of the place, topography, soil type and presence of vegetation and buildings are considered. Such information can assist in obtaining reliable results and thus they guarantee the future performance of noise mitigation solutions through the use of reduced scale models for validating computer simulation / Doutorado / Arquitetura e Construção / Doutora em Engenharia Civil
18

Estudo da IEC 61850 e o seu impacto no sistema de automação de subestações. / Study of IEC 61850 and its impact in substation automation system.

Gilberto Igarashi 29 February 2008 (has links)
Nos Sistemas de Automação de Subestação atuais são utilizados equipamentos digitais chamados IED (Dispositivos Eletrônicos Inteligentes), incorporando as funções de proteção, automação e medição. Estes, para trocarem informações entre si, utilizam um canal de comunicação serial, sendo os dados transmitidos de forma digital por meio de vários protocolos, muitos deles proprietários, o que dificulta a integração entre eles. Neste cenário entra a norma IEC 61850 oferecendo um padrão a ser seguido entre os fabricantes de IED. Este trabalho tem por objetivo apresentar um estudo da norma e a análise de sua aplicação no Sistema de Automação de Subestação. O estudo proposto da norma a analisará utilizando os principais conceitos estabelecidos por ela para atingir os objetivos propostos: interoperabilidade, liberdade de configuração e estabilidade a longo prazo. Como ensaio de aplicação da norma será apresentado um comparativo com um protocolo utilizado atualmente e a implementação de funções de proteção. No comparativo entre protocolos foi escolhido o DNP3, um dos mais utilizados atualmente no setor elétrico, com o objetivo de verificar as principais diferenças entre eles e vantagens de cada um. Para a implementação de funções de proteção foram escolhidos dois exemplos: a falha de disjuntor e o bloqueio reverso, implementadas da forma tradicional, por meio de sinais elétricos de comando transmitidos por cabos, e por meio dos serviços de mensagens prioritárias da IEC 61850, com o objetivo de analisar suas dinâmicas, seus tempos de atuação e o comportamento frente a eventuais defeitos. / In current Substation Automation System, digital equipaments called IED (Intelligent Electronic Devices) are used with protection, automation and measurement functions incorporated. These devices, to exchange information among them, use serial communication buses with information transmitted in digital form through many procotols, many of them proprietary, making their integration very hard. In this scene, IEC61850 standard appears offering a standard to be followed by IED manufacturers. This research presents a IEC 61850 standard study and an analysis of its application in Substation Automation System. The proposed study will analise the standard through the most important topics used by the standard to reach its main goals: interoperability, free configuration and long-term stability. In the application analysis, a comparative with a protocol used nowadays and a implementation of protection functions will be presented. In the comparative between protocols the chosen was DNP3, one of most used protocols in electric plants, with the purpose of verifying the main diferences and advantages of each one. Two examples of protection functions implementation were chosen: breaker failure and reverse blocking, implemented through traditional techniques, using wires and electrical signals, and through high performance IEC 61850 services, with the purpose of analising their dynamics, their actuation times and their behavior in eventual failures.
19

Detecção e classificação de distúrbios de tensão usando redes neurais ARTMAP Euclidiana modificada com treinamento continuado /

Barros, Ana Claudia. January 2013 (has links)
Orientador: Carlos Roberto Minussi / Banca: Anna Diva Plasencia Lotufo / Banca: Mara Lúcia Martins Lopes / Banca: Fernanda Caseño Lima Trindade / Banca: José Carlos de Melo Vieira Junior / Resumo: Apresenta-se, nesta pesquisa, uma metodologia para realizar a detecção e classificação de distúrbios de tensão em sistemas de distribuição de energia elétrica, usando como ferramenta, as análises estatística e direta multinível dos sinais de tensão no domínio wavelet para o processo de detecção e uma rede neural ARTMAP Euclidiana Modificada com Treinamento Continuado (ARTMAP-EMTC) para o processo de classificação. Com o auxílio destas duas ferramentas obtém-se maior precisão, segurança e confiabilidade na tomada de decisão para o restabelecimento das operações normais do sistema. A rede neural ARTMAP-EMTC é capaz de se adaptar às constantes mudanças que sofre o setor elétrico, e.g., fornece o diagnóstico de um distúrbio desconhecido pela rede neural que possa surgir com o passar do tempo. Além disso, permite a inclusão de novos padrões na memória da rede neural sem a necessidade de reiniciar o treinamento, o que não ocorre com outros tipos de redes neurais. Trata-se, por conseguinte, de uma nova abordagem da aplicação de redes neurais onde é realizada, permanentemente, a extração do conhecimento do sistema sob análise, a partir de informações disponibilizadas na operação do sistema (resultado das análises, simulação, etc.). Os sinais de tensão, necessários para realizar os diagnósticos de distúrbios de tensão, foram obtidos por meio de simulações de um modelo de alimentador radial no software ATP (Alternative Transients Program) e Matlab, empregando-se a transformada wavelet discreta, análise multirresolução e o conceito de energia. Os resultados obtidos mostram a eficiência da metodologia proposta, o que possibilita sua aplicação, com sucesso, na proteção dos sistemas de distribuição, auxiliando os operadores no processo de decisão visando restabelecer o sistema e contribuindo, desta forma, para a melhoria da qualidade da energia elétrica fornecida aos consumidores. / Abstract: This research presents a methodology to detect and classify voltage disturbances in electrical distribution systems using as tool, statistical and multilevel direct analysis of voltage signals in wavelet domain for the detection process and modified Euclidean ARTMAP neural network with continuous training for the classification (ARTMAP- MECT). These two tools provide velocity, security and reliability for decision making when it is necessary to restore the normal operations. The ARTMAP-MECT is able to adapt to continuous changes at the electrical system, e.g. to provide a diagnosis of unknown disturbances by the neural network Furthermore, it allows the inclusion of new patterns in the memory of the neural network without reinitializing the training, which is not possible in other neural networks. It is a new approach of neural network application where the knowledge is permanently extracted from the system under analysis from information available in the system operation (results from analysis, simulation, etc.). The voltage signals that are necessary to execute the voltage disturbance diagnosis are obtained from simulations of a radial feeder using the ATP (Alternative Transients Program) and MATLAB using the discrete wavelet transform, multi-resolution analysis and energy concept. The obtained results show the efficiency of the proposed methodology allowing the application in distribution protection, aiding the operators in decision procedures to restore the system and contributing to improve the power quality provided to the users. / Doutor
20

Desenvolvimento de algoritmo de controle de tração para regeneração de energia metroviária - ACTREM: melhoria da eficiência energética de sistemas de tração metroviária. / Development traction control algorithm for subway energy regeneration - ACTREM: improving the energy efficiency of subway traction systems.

Sousa, Carlos Alberto de 01 September 2015 (has links)
Esta tese propõe um modelo de regeneração de energia metroviária, baseado no controle de paradas e partidas do trem ao longo de sua viagem, com o aproveitamento da energia proveniente da frenagem regenerativa no sistema de tração. O objetivo é otimizar o consumo de energia, promover maior eficiência, na perspectiva de uma gestão sustentável. Aplicando o Algoritmo Genético (GA) para obter a melhor configuração de tráfego dos trens, a pesquisa desenvolve e testa o Algoritmo de Controle de Tração para Regeneração de Energia Metroviária (ACTREM), usando a Linguagem de programação C++. Para analisar o desempenho do algoritmo de controle ACTREM no aumento da eficiência energética, foram realizadas quinze simulações da aplicação do ACTREM na linha 4 - Amarela do metrô da cidade de São Paulo. Essas simulações demonstraram a eficiência do ACTREM para gerar, automaticamente, os diagramas horários otimizados para uma economia de energia nos sistemas metroviários, levando em consideração as restrições operacionais do sistema, como capacidade máxima de cada trem, tempo total de espera, tempo total de viagem e intervalo entre trens. Os resultados mostram que o algoritmo proposto pode economizar 9,5% da energia e não provocar impactos relevantes na capacidade de transporte de passageiros do sistema. Ainda sugerem possíveis continuidades de estudos. / This thesis proposes a subway energy regeneration model, based on control stops and train departures throughout his trip, with the use of energy from the regenerative braking in the drive system. The goal is to optimize the power consumption, improve efficiency, in view of sustainable management. Applying Genetic Algorithm (GA) to get the better of the trains traffic configuration, the research develops and tests the Traction Control Algorithm for Subway Energy Regeneration (ACTREM), using the C ++ programming language. To analyze the performance of ACTREM control algorithm in enhancing energy efficiency, there were fifteen simulations of applying ACTREM on line 4 - Yellow subway in São Paulo. These simulations showed the ACTREM efficiency to generate automatically diagrams schedules optimized for energy savings in metro systems, taking into account the system\'s operational constraints such as maximum each train capacity, total wait time, total travel time and interval between trains. The results show that the proposed algorithm can save 9.5% of the energy and not cause significant impacts on the transportation system capacity passengers. Also suggest possible continuities studies.

Page generated in 0.4495 seconds