21

Lógica fuzzy aplicados ao registro de alarmes e eventos em subestações no padrão IEC 61850. / Fuzzy logic applied to registration of alarms and events in substations in standard IEC 61850.

Ribeiro, Luiz Gustavo 23 November 2015 (has links)
A aplicação de técnicas de Inteligência artificial em sistemas elétricos de potência permite a resolução de problemas onde soluções tradicionais não mostram bons resultados. Por exemplo, após a ocorrência de uma falta, um sistema automatizado toma todas as medidas necessárias para proteger o sistema e assumir um estado seguro de operação. Nessa ocasião, cabe aos operadores verificar todas as mensagens e dados disponíveis, selecionando aquelas relevantes, para então chegar a uma conclusão sobre o evento ocorrido. Apenas após esse diagnóstico, com base em seu conhecimento, o operador pode ordenar o restabelecimento do sistema ou sua manobra para outro estado. Esse processo é lento e passível de falhas, pois as informações são usualmente conflitantes e confusas, devido à avalanche de eventos, alarmes e alertas decorrentes. Diante desta dificuldade, é interessante dispor de uma ferramenta automática de diagnóstico e apoio na tomada de decisão que torne essa tarefa mais ágil e com menores riscos. Este trabalho aborda a integração e a interoperabilidade de equipamentos de uma subestação elétrica em conformidade com a norma IEC 61850, e a utilização de sistemas inteligentes com lógica Fuzzy executados em um controlador programável moderno. O sistema proposto faz uso de recursos de comunicação da IEC 61850, com mensagens prioritárias padrão GOOSE incluindo valores analógicos de corrente de falta, além de mensagens no padrão TCP/IP MMS. Essas informações, alarmes e eventos, são processadas de forma automática por um motor Fuzzy que permite aproximar a decisão computacional à decisão humana, incluindo zonas de incerteza e lógica ponderada, permitindo respostas mais abstratas do que algo puramente binário. O sistema proposto foi submetido a um grande número de eventos com um simulador em tempo real, com equipamentos reais, tais como IEDs e um controlador programável de alto desempenho. Além disso o sistema usou um esquema de comunicação inovador para o módulo do processador de dados em tempo real (RTDP), inteiramente baseado nos protocolos da IEC 61850. / The application of artificial intelligence techniques in electric power systems allows solving problems where traditional solutions do not show good results. For example, in electric power systems, after the occurence of a fault, an automated system takes all necessary measures to protect the system and assume a safe state of operation. On this occasion, it is for operators to review all messages and data available, selecting those relevant to then come to a conclusion about the event that occurred. Only after this diagnosis, based on his knowledge the operator may order the restoration of the system or their operation to another state. This process is therefore slow and subject to failure, because the information is usually conflicting and confusing because of the avalanche of events, alarms and warnings arising. Faced with this difficulty, it is interesting to have an automatic diagnostic tool and support in decision making that makes this task quicker and with less risk. This paper addresses the integration and interoperability of an electrical substation equipment in accordance with IEC 61850, and the use of intelligent systems Fuzzy logic running on a modern programmable controller. The proposed system makes use of the IEC 61850 communication resources with priority GOOSE messages including standard analog values of fault current, as well as messages on standard TCP / IP MMS. This information, alarms and events, are processed automatically by a fuzzy engine that allows the computational approach to human decision making, including areas of uncertainty and weighted logic, allowing more abstract answers than purely binary. The proposed system has undergone a large number of events with a simulator in real time with actual equipment such as a programmable controller IEDs and high performance. In addition the system used an innovative communication scheme for the module\'s real-time data processor ( RTDP ), based entirely on the IEC 61850 standard protocols such as MMS and GOOSE messages.
22

Lógica fuzzy aplicados ao registro de alarmes e eventos em subestações no padrão IEC 61850. / Fuzzy logic applied to registration of alarms and events in substations in standard IEC 61850.

Luiz Gustavo Ribeiro 23 November 2015 (has links)
A aplicação de técnicas de Inteligência artificial em sistemas elétricos de potência permite a resolução de problemas onde soluções tradicionais não mostram bons resultados. Por exemplo, após a ocorrência de uma falta, um sistema automatizado toma todas as medidas necessárias para proteger o sistema e assumir um estado seguro de operação. Nessa ocasião, cabe aos operadores verificar todas as mensagens e dados disponíveis, selecionando aquelas relevantes, para então chegar a uma conclusão sobre o evento ocorrido. Apenas após esse diagnóstico, com base em seu conhecimento, o operador pode ordenar o restabelecimento do sistema ou sua manobra para outro estado. Esse processo é lento e passível de falhas, pois as informações são usualmente conflitantes e confusas, devido à avalanche de eventos, alarmes e alertas decorrentes. Diante desta dificuldade, é interessante dispor de uma ferramenta automática de diagnóstico e apoio na tomada de decisão que torne essa tarefa mais ágil e com menores riscos. Este trabalho aborda a integração e a interoperabilidade de equipamentos de uma subestação elétrica em conformidade com a norma IEC 61850, e a utilização de sistemas inteligentes com lógica Fuzzy executados em um controlador programável moderno. O sistema proposto faz uso de recursos de comunicação da IEC 61850, com mensagens prioritárias padrão GOOSE incluindo valores analógicos de corrente de falta, além de mensagens no padrão TCP/IP MMS. Essas informações, alarmes e eventos, são processadas de forma automática por um motor Fuzzy que permite aproximar a decisão computacional à decisão humana, incluindo zonas de incerteza e lógica ponderada, permitindo respostas mais abstratas do que algo puramente binário. O sistema proposto foi submetido a um grande número de eventos com um simulador em tempo real, com equipamentos reais, tais como IEDs e um controlador programável de alto desempenho. Além disso o sistema usou um esquema de comunicação inovador para o módulo do processador de dados em tempo real (RTDP), inteiramente baseado nos protocolos da IEC 61850. / The application of artificial intelligence techniques in electric power systems allows solving problems where traditional solutions do not show good results. For example, in electric power systems, after the occurence of a fault, an automated system takes all necessary measures to protect the system and assume a safe state of operation. On this occasion, it is for operators to review all messages and data available, selecting those relevant to then come to a conclusion about the event that occurred. Only after this diagnosis, based on his knowledge the operator may order the restoration of the system or their operation to another state. This process is therefore slow and subject to failure, because the information is usually conflicting and confusing because of the avalanche of events, alarms and warnings arising. Faced with this difficulty, it is interesting to have an automatic diagnostic tool and support in decision making that makes this task quicker and with less risk. This paper addresses the integration and interoperability of an electrical substation equipment in accordance with IEC 61850, and the use of intelligent systems Fuzzy logic running on a modern programmable controller. The proposed system makes use of the IEC 61850 communication resources with priority GOOSE messages including standard analog values of fault current, as well as messages on standard TCP / IP MMS. This information, alarms and events, are processed automatically by a fuzzy engine that allows the computational approach to human decision making, including areas of uncertainty and weighted logic, allowing more abstract answers than purely binary. The proposed system has undergone a large number of events with a simulator in real time with actual equipment such as a programmable controller IEDs and high performance. In addition the system used an innovative communication scheme for the module\'s real-time data processor ( RTDP ), based entirely on the IEC 61850 standard protocols such as MMS and GOOSE messages.
23

Desenvolvimento de algoritmo de controle de tração para regeneração de energia metroviária - ACTREM: melhoria da eficiência energética de sistemas de tração metroviária. / Development traction control algorithm for subway energy regeneration - ACTREM: improving the energy efficiency of subway traction systems.

Carlos Alberto de Sousa 01 September 2015 (has links)
Esta tese propõe um modelo de regeneração de energia metroviária, baseado no controle de paradas e partidas do trem ao longo de sua viagem, com o aproveitamento da energia proveniente da frenagem regenerativa no sistema de tração. O objetivo é otimizar o consumo de energia, promover maior eficiência, na perspectiva de uma gestão sustentável. Aplicando o Algoritmo Genético (GA) para obter a melhor configuração de tráfego dos trens, a pesquisa desenvolve e testa o Algoritmo de Controle de Tração para Regeneração de Energia Metroviária (ACTREM), usando a Linguagem de programação C++. Para analisar o desempenho do algoritmo de controle ACTREM no aumento da eficiência energética, foram realizadas quinze simulações da aplicação do ACTREM na linha 4 - Amarela do metrô da cidade de São Paulo. Essas simulações demonstraram a eficiência do ACTREM para gerar, automaticamente, os diagramas horários otimizados para uma economia de energia nos sistemas metroviários, levando em consideração as restrições operacionais do sistema, como capacidade máxima de cada trem, tempo total de espera, tempo total de viagem e intervalo entre trens. Os resultados mostram que o algoritmo proposto pode economizar 9,5% da energia e não provocar impactos relevantes na capacidade de transporte de passageiros do sistema. Ainda sugerem possíveis continuidades de estudos. / This thesis proposes a subway energy regeneration model, based on control stops and train departures throughout his trip, with the use of energy from the regenerative braking in the drive system. The goal is to optimize the power consumption, improve efficiency, in view of sustainable management. Applying Genetic Algorithm (GA) to get the better of the trains traffic configuration, the research develops and tests the Traction Control Algorithm for Subway Energy Regeneration (ACTREM), using the C ++ programming language. To analyze the performance of ACTREM control algorithm in enhancing energy efficiency, there were fifteen simulations of applying ACTREM on line 4 - Yellow subway in São Paulo. These simulations showed the ACTREM efficiency to generate automatically diagrams schedules optimized for energy savings in metro systems, taking into account the system\'s operational constraints such as maximum each train capacity, total wait time, total travel time and interval between trains. The results show that the proposed algorithm can save 9.5% of the energy and not cause significant impacts on the transportation system capacity passengers. Also suggest possible continuities studies.
24

Sistema especialista para análise pós-evento da proteção em subestações distribuidoras. / Expert system for post-event analysis of the protection system in distribution substations.

Matsuo, Igor Brandão Machado 08 June 2015 (has links)
É importante que as redes elétricas tenham altos índices de confiabilidade, de forma a se manter a agilidade e a manutenção ideais para um melhor funcionamento. Por outro lado, o crescimento inesperado da carga, falhas em equipamentos e uma parametrização inadequada das funções de proteção tornam a análise de eventos de proteção mais complexas e demoradas. Além disso, a quantidade de informações que pode ser obtida de relés digitais modernos tem crescido constantemente. Para que seja possível uma rápida tomada de decisão e manutenção, esse projeto de pesquisa teve como objetivo a implementação de um sistema completo de diagnóstico que é ativado automaticamente quando um evento de proteção ocorrer. As informações a serem analisadas são obtidas de uma base de dados e de relés de proteção, via protocolo de comunicação IEC 61850 e arquivos de oscilografia. O trabalho aborda o sistema Smart Grid completo incluindo: a aquisição de dados nos relés, detalhando o sistema de comunicação desenvolvido através de um software com um cliente IEC61850 e um servidor OPC e um software com um cliente OPC, que é ativado por eventos configurados para dispará-lo (por exemplo, atuação da proteção); o sistema de pré-tratamento de dados, onde os dados provenientes dos relés e equipamentos de proteção são filtrados, pré-processados e formatados; e o sistema de diagnóstico. Um banco de dados central mantém atualizados os dados de todas essas etapas. O sistema de diagnóstico utiliza algoritmos convencionais e técnicas de inteligência artificial, em particular, um sistema especialista. O sistema especialista foi desenvolvido para lidar com diferentes conjuntos de dados de entrada e com uma possível falta de dados, sempre garantindo a entrega de diagnósticos. Foram realizados testes e simulações para curtos-circuitos (trifásico, dupla-fase, dupla-fase-terra e fase-terra) em alimentadores, transformadores e barras de uma subestação. Esses testes incluíram diferentes estados do sistema de proteção (funcionamento correto e impróprio). O sistema se mostrou totalmente eficaz tanto no caso de disponibilidade completa quanto parcial de informações, sempre fornecendo um diagnóstico do curto-circuito e analisando o funcionamento das funções de proteção da subestação. Dessa forma, possibilita-se uma manutenção muito mais eficiente pelas concessionárias de energia, principalmente no que diz respeito à prevenção de defeitos em equipamentos, rápida resposta a problemas, e necessidade de reparametrização das funções de proteção. O sistema foi instalado com sucesso em uma subestação de distribuição da Companhia Paulista de Força e Luz. / It is important that electrical networks have high levels of reliability in order to maintain the ideal agility and maintenance for better functioning. On the other hand, the often unexpected load growth, failures of protectionrelated equipment and inadequate parameterization of protection functions make the analyses of protection events more complex and time-consuming. Besides, the amount of information that can be retrieved from modern digital relays is constantly increasing. In order to aid a quick decision-making and maintenance practices, this research project aimed to implement a complete diagnosis system that is automatically activated whenever a protection-related event occurs. Information to be analyzed is obtained from a database and from the protection relays, via IEC 61850 communication protocol and oscillography files. The full smart grid system is addressed, including: the data acquisition and communication system developed through a software with an IEC61850 client and an OPC server and another software with an OPC client, which is activated by set triggering events (e.g. protection tripping); the data pre-processing system, in which the data is filtered, preprocessed and formatted; and the diagnostic system. A central database maintains updated all the data. For the diagnostic system, conventional algorithms and artificial intelligence techniques are applied; particularly, an expert system is implemented. The expert system was designed to deal with different sets of input information and uses different techniques to deal with a possible lack of data, always ensuring the delivery of diagnoses. Tests and simulations were performed for short-circuits (three-phase, phase-to-phase, double-phase-to-ground and phase-to-ground) on feeders, transformers and bus bars of a substation. These tests included different states of the protection system (proper functioning and malfunctioning). The diagnostic system proved to be fully effective under both complete and partial availability of information, always providing the fault diagnosis and the analysis of the protection functions. In brief, the system enables a much more efficient maintenance to power distribution utilities, especially when preventing equipment malfunctioning, quick responses towards system problems and the need to re-define some protection functions are required. It was successfully installed in a distribution substation of Companhia Paulista de Força e Luz, a Brazilian power distribution utility.
25

Sistema especialista para análise pós-evento da proteção em subestações distribuidoras. / Expert system for post-event analysis of the protection system in distribution substations.

Igor Brandão Machado Matsuo 08 June 2015 (has links)
É importante que as redes elétricas tenham altos índices de confiabilidade, de forma a se manter a agilidade e a manutenção ideais para um melhor funcionamento. Por outro lado, o crescimento inesperado da carga, falhas em equipamentos e uma parametrização inadequada das funções de proteção tornam a análise de eventos de proteção mais complexas e demoradas. Além disso, a quantidade de informações que pode ser obtida de relés digitais modernos tem crescido constantemente. Para que seja possível uma rápida tomada de decisão e manutenção, esse projeto de pesquisa teve como objetivo a implementação de um sistema completo de diagnóstico que é ativado automaticamente quando um evento de proteção ocorrer. As informações a serem analisadas são obtidas de uma base de dados e de relés de proteção, via protocolo de comunicação IEC 61850 e arquivos de oscilografia. O trabalho aborda o sistema Smart Grid completo incluindo: a aquisição de dados nos relés, detalhando o sistema de comunicação desenvolvido através de um software com um cliente IEC61850 e um servidor OPC e um software com um cliente OPC, que é ativado por eventos configurados para dispará-lo (por exemplo, atuação da proteção); o sistema de pré-tratamento de dados, onde os dados provenientes dos relés e equipamentos de proteção são filtrados, pré-processados e formatados; e o sistema de diagnóstico. Um banco de dados central mantém atualizados os dados de todas essas etapas. O sistema de diagnóstico utiliza algoritmos convencionais e técnicas de inteligência artificial, em particular, um sistema especialista. O sistema especialista foi desenvolvido para lidar com diferentes conjuntos de dados de entrada e com uma possível falta de dados, sempre garantindo a entrega de diagnósticos. Foram realizados testes e simulações para curtos-circuitos (trifásico, dupla-fase, dupla-fase-terra e fase-terra) em alimentadores, transformadores e barras de uma subestação. Esses testes incluíram diferentes estados do sistema de proteção (funcionamento correto e impróprio). O sistema se mostrou totalmente eficaz tanto no caso de disponibilidade completa quanto parcial de informações, sempre fornecendo um diagnóstico do curto-circuito e analisando o funcionamento das funções de proteção da subestação. Dessa forma, possibilita-se uma manutenção muito mais eficiente pelas concessionárias de energia, principalmente no que diz respeito à prevenção de defeitos em equipamentos, rápida resposta a problemas, e necessidade de reparametrização das funções de proteção. O sistema foi instalado com sucesso em uma subestação de distribuição da Companhia Paulista de Força e Luz. / It is important that electrical networks have high levels of reliability in order to maintain the ideal agility and maintenance for better functioning. On the other hand, the often unexpected load growth, failures of protectionrelated equipment and inadequate parameterization of protection functions make the analyses of protection events more complex and time-consuming. Besides, the amount of information that can be retrieved from modern digital relays is constantly increasing. In order to aid a quick decision-making and maintenance practices, this research project aimed to implement a complete diagnosis system that is automatically activated whenever a protection-related event occurs. Information to be analyzed is obtained from a database and from the protection relays, via IEC 61850 communication protocol and oscillography files. The full smart grid system is addressed, including: the data acquisition and communication system developed through a software with an IEC61850 client and an OPC server and another software with an OPC client, which is activated by set triggering events (e.g. protection tripping); the data pre-processing system, in which the data is filtered, preprocessed and formatted; and the diagnostic system. A central database maintains updated all the data. For the diagnostic system, conventional algorithms and artificial intelligence techniques are applied; particularly, an expert system is implemented. The expert system was designed to deal with different sets of input information and uses different techniques to deal with a possible lack of data, always ensuring the delivery of diagnoses. Tests and simulations were performed for short-circuits (three-phase, phase-to-phase, double-phase-to-ground and phase-to-ground) on feeders, transformers and bus bars of a substation. These tests included different states of the protection system (proper functioning and malfunctioning). The diagnostic system proved to be fully effective under both complete and partial availability of information, always providing the fault diagnosis and the analysis of the protection functions. In brief, the system enables a much more efficient maintenance to power distribution utilities, especially when preventing equipment malfunctioning, quick responses towards system problems and the need to re-define some protection functions are required. It was successfully installed in a distribution substation of Companhia Paulista de Força e Luz, a Brazilian power distribution utility.
26

Cálculo de parâmetros de malhas de aterramento em geometrias não convencionais / Computation of grounding grids parameters on unconventional geometry

Pires, Thyago Gumeratto 28 March 2016 (has links)
Submitted by Jaqueline Silva (jtas29@gmail.com) on 2016-09-13T17:53:11Z No. of bitstreams: 2 Dissertação - Thyago Gumeratto Pires - 2016.pdf: 3317577 bytes, checksum: c905ac50dff6e34d77078f57380def44 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) / Approved for entry into archive by Jaqueline Silva (jtas29@gmail.com) on 2016-09-13T17:53:23Z (GMT) No. of bitstreams: 2 Dissertação - Thyago Gumeratto Pires - 2016.pdf: 3317577 bytes, checksum: c905ac50dff6e34d77078f57380def44 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) / Made available in DSpace on 2016-09-13T17:53:23Z (GMT). No. of bitstreams: 2 Dissertação - Thyago Gumeratto Pires - 2016.pdf: 3317577 bytes, checksum: c905ac50dff6e34d77078f57380def44 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Previous issue date: 2016-03-28 / This work presents the methodology for the calculation of the ground resistance, the ground potential rise, the surface potential, the touch voltage and step voltage in grounding grids with any geometry and buried at any depth within strati ed soil in two layers. The values of potential, touch voltage and step voltage are obtained at any point over the grid. The proposed equation uses the images and the average potential methods. The main feature of this modeling in relation to the other methods is the possibility of calculation of grids containing electrodes positioned at any distance and at any angle. The results obtained with the proposed methodology are presented and discussed. / Este trabalho apresenta metodologia para o c alculo da resist^encia de terra, da eleva c~ao do potencial da malha, do potencial na superf cie do solo, da tens~ao de toque e da tens~ao de passo em malhas de aterramento com qualquer geometria e posicionada a qualquer profundidade em solos estrati cados em duas camadas. Os valores do potencial e das tens~oes de toque e de passo s~ao obtidos em qualquer ponto sobre a malha. O equacionamento proposto utiliza os m etodos das imagens e do potencial m edio. A principal caracter stica desta modelagem em rela c~ao as demais e a possibilidade do c alculo de malhas contendo eletrodos posicionados a qualquer dist^ ancia e em qualquer ^angulo. Os resultados obtidos com a metodologia proposta s~ao apresentados e discutidos.
27

Simulador de uma subestação elétrica para ensino de princípios básicos de eletricidade

SILVA, Hudson Afonso Batista da 08 February 2017 (has links)
Submitted by Nathalya Silva (nathyjf033@gmail.com) on 2017-06-28T18:54:38Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_SimuladorSubestacaoEletrica.pdf: 3283553 bytes, checksum: 9943354b2bea5a845f4a41347e9945bb (MD5) / Approved for entry into archive by Irvana Coutinho (irvana@ufpa.br) on 2017-08-11T15:05:46Z (GMT) No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_SimuladorSubestacaoEletrica.pdf: 3283553 bytes, checksum: 9943354b2bea5a845f4a41347e9945bb (MD5) / Made available in DSpace on 2017-08-11T15:05:46Z (GMT). No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_SimuladorSubestacaoEletrica.pdf: 3283553 bytes, checksum: 9943354b2bea5a845f4a41347e9945bb (MD5) Previous issue date: 2017-02-08 / Este trabalho apresenta o projeto e implementação de um simulador, composto de uma parte em software e outra em hardware, para o auxílio do professor no ensino de princípios de eletricidade e operação básica de uma subestação, tendo como caso de uso a subestação da Eletronorte no município de Marabá localizada na região Sudeste do estado do Pará. Para o desenvolvimento do simulador foram utilizados em conjunto a plataforma Unity em 2D e um mini circuito utilizando Arduino. O Simulador passou por avaliações em sala de aula com alunos e com o professor e se mostrou uma ferramenta capaz de auxiliar ao ensino de princípios básicos de eletricidade e operação básica de uma subestação. / This work presents the design and implementation of a simulator, composed of a part in software and a part in hardware, to help the teacher in the teaching of electricity principles and basic operation of a substation, using as a case of use the Eletronorte substation in the Municipality of Marabá located in the Southeast region of the state of Pará. For the development of the simulator were used together the Unity platform in 2D and a mini circuit using Arduino. The Simulator underwent classroom evaluations with students and the teacher and proved to be a tool capable of assisting in the teaching of basic principles of electricity and basic operation of a substation.
28

Análise computacional numérica do comportamento de ruptura dos solos em fundações superficiais com excentricidade gerada por cargas horizontais

Pereira, Paulo Henrique 30 May 2012 (has links)
Em subestações de transmissão e distribuição de energia elétrica são utilizadas estruturas metálicas ou de concreto para o suporte de equipamentos e ancoragem de linhas de transmissão. Nestas estruturas os esforços principais atuam horizontalmente pela ação do vento e da tração nos cabos de transmissão de energia elétrica. Devido aos baixos esforços verticais, normalmente, utilizam-se como solução fundações rasas, uma vez que apresentam menor custo e maior facilidade de execução quando comparadas com fundações profundas. Devido a distância de aplicação das cargas horizontais em relação à base, os momentos gerados por estas se tornam elevados em relação à carga vertical atuante. Esta configuração faz com que a resultante dos esforços, frequentemente, esteja fora do núcleo central da fundação. Segundo a NBR 6122 (1996), para a avaliação da capacidade de suporte das fundações nos casos de cargas excêntricas, deve ser adotada uma área efetiva onde os esforços de compressão são considerados uniformemente distribuídos. Este procedimento simplificado muitas vezes torna os dimensionamentos extremamente conservadores, tendo em vista os baixos carregamentos verticais e as grandes excentricidades. Esta pesquisa visa, através de utilização de modelos computacionais numéricos, caracterizar o comportamento de ruptura dos solos solicitados por fundações superficiais sujeitas a esforços combinados verticais, horizontais e momentos. Além disso, os resultados obtidos nos modelos numéricos são comparados com as formulações clássicas de dimensionamento de fundações. / For power substations, both steel and reinforced concrete structures are normally used to support the equipments and the high voltage wiring. In such cases, the wind forces predominate and cause tension in the electrical cables and structures. As the vertical loads are relatively small, generally shallow foundations apply, being also easily executed under lower costs. Due to the distance between the horizontal forces and the structural foundation, high moments are generated comparatively to the vertical loads present, defining big eccentricity in the foundation. According to ABNT-NBR 6122 (1996), to determine the foundation bearing capacity, an effective area way be considered for the compression stresses to act. This situation often yields to unrealistic foundation design. The present dissertation intend to model the failure behavior of the soil supporting shallow foundation by means of computational methods, considering vertical and horizontal forces acting along with moments. A comparison is also mode with commonly used bearing capacity equations for the same type of foundations.