• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • 3
  • Tagged with
  • 9
  • 9
  • 9
  • 9
  • 5
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Evaluation of the effectiveness of public participation in the Gauteng electronic tolling programme

24 April 2015 (has links)
M.A. (Public Management and Governance) / The South African road system is managed by the South African National Roads Agency Limited (SANRAL), which is an agency under the Department of Transport. The main aim of SANRAL is to connect major cities, towns and emerging villages. It has undertaken a project of upgrading and expanding of the road network in the Gauteng Province of South Africa, known as the e-tolling system. It allows for the free flow Electronic Tolling (E-Toll) system and records all vehicles passing through the tollgate without requiring them to stop or slow. A built-in device (tag) is fitted into the overhead gantry system to detect the passing vehicle, which reads an e-tag (if fitted), as well as recording the number plate of the vehicle. A fee for using the road will be charged and paid later from a registered e-toll account, linked to the vehicle user or if no e-tag is present a bill is submitted to the owner. The primary issue associated with the project relates to complaints from various interest groups, political parties and civic organisations regarding public participation in the planning and execution of e-tolling. This has resulted in mass marches and court cases, with the project, consequently undergoing delays, suspension and postponements. The study is, thus, motivated by the foregoing factors in endeavouring to assess the effectiveness of the public participation process in the initial stages of the e-tolling project. The research utilised an exploratory case study method; comprehensively appraising the public participation areas within the e-tolling project of Gauteng. The study employed both documentation reviews and interviews as data collection methods. The research design was predominantly qualitative, however data analysis was undertaken and presented in both qualitative and quantitative evaluations...
2

An assessment of e-tolling as a method of financing Gauteng roads

Ponter, Lloyd Anthony January 2015 (has links)
E-tolling was recently implemented on roads in Gauteng, South Africa. This gave rise to a great deal of protest by road users and a court battle between the South African National Roads Agency (SANRAL) and the Opposition to Urban Tolling Alliance, a body representing road users. The e-tolling system was criticised at various levels and on numerous grounds, some financial and others appearing to be emotional. This thesis attempted to analyse the various grounds for objection against the system, the main goal of the research being to analyse e-tolling in Gauteng to ascertain whether or not the introduction of e-tolling was justified or whether an alternative method of taxation to pay for the upgrading of Gauteng roads would have been more cost-effective. Secondary data in the form of documents from multiple sources was used in the analysis, including an Economic Impact Assessment that was one of the key inputs into the decision to introduce e-tolling. It was found that there are multiple problems plaguing the e-toll system and e-tolling is not the most cost-effective taxation method of paying for Gauteng roads. Using a fuel levy or general tax revenue available to the National Treasury were both found to be more cost-effective methods as they would have achieved the same result (repairing and upgrading specific Gauteng roads), at a cost of R20,0913 billion less than e-tolling. It was suggested that the best taxation method/s to pay for the roads would have been using a fuel levy and general tax revenue as the primary funding methods, with vehicle licensing fees and long distance toll roads as secondary methods to aid the primary methods.
3

Mega project analysis : a case study of the Gauteng Freeway Improvement Project

Parrock, Philip 04 1900 (has links)
Thesis (MA)--Stellenbosch University, 2015. / ENGLISH ABSTRACT: Mega projects have fascinated human beings for as long as history can remember. The urge to build something bigger and better than has ever been done before has always been a driving force behind the human race’s relentless pursuit of technological advancement. It is in this vein that mega projects have evolved over time, as methods of construction improved, so did the scale on which people could attempt new projects. The Channel Tunnel between England and France, the Hoover Dam in America and the Millau Viaduct in the French countryside are some of the biggest examples of infrastructure projects in the world and these are all unequivocally, mega projects. Costing at least $ 250 million and incorporating major technological challenges, mega projects continue to inspire and motivate artists and engineers alike. This thesis seeks to expand people’s understanding of the analysis of these mega projects. Mega project analysis is a field that has struggled to differentiate itself ordinary project analysis. The Gauteng Freeway Improvement Project (GFIP) and the associated e-tolling mega project will be analysed in this thesis. The framework for analysis will be provided by the work of Flyvbjerg, Bruzelius and Rothengatter (2003), who seek to analyse mega project success or failure based on three key indicators of economic sustainability, environmental concerns and the effect of public support. This thesis will use the indicators of economic sustainability and the effect of public support to determine whether the Gauteng Freeway Improvement Project (GFIP) can be viewed as a failed mega project or not. After an in-depth study of the data and material available, this descriptive and explanatory study shows that the GFIP and associated e-tolling mega project is indeed a failed mega project. This is because it has failed the analysis in both categories of economic sustainability and the effect of public support. / AFRIKAANSE OPSOMMING: Megaprojekte het al eeue lank die mens gefasineer. Die neiging van die mens om iets groter en beter te maak as wat al ooit gemaak was het nog altyd baie dryfkrag verskaf vir die mens se strewe na tegnologiese verbetering. Dit is met hierdie idee in gedagte dat megaprojekte met tyd verander het, soos wat boumetodes verbeter het, so ook het die grootte van projekte verander wat mense kon aanpak. Die Channel Tonnel tussen Engeland en Frankryk, die Hoover Dam in Amerika en die Millau Brug in die Franse platteland is voorbeelde van die grootste infrastruktuur projekte ter wêreld en hierdie is al drie, sonder enige twyfel, megaprojekte. Teen ‘n koste van ten minste $ 250 miljoen en met grootskaalse tegnologiese uitdaging, hou megaprojekte aan om vir beide kunstenaars en ingenieurs te motiveer en uit te daag. Hierdie tesis poog om mense se kennis van die analise van megaprojekte te verbreed. Megaprojek analise is ‘n veld wat al jare lank sukkel om verskille te bewerkstellig tussen homself en gewone projek analise. Die “Gauteng Freeway Improvement Project” (GFIP) en die verwante e-toll megaprojek sal geanaliseer word in hierdie tesis. Die raamwerk vir analise sal deur Flyvbjerg, Bruzelius en Rothengatter (2003) verskaf word, waar die outeurs poog om megaprojekte se sukses of mislukking te bepaal gebaseer op die sleutel aanwysers van ekonomiese volhoubaarheid, omgewingskwessies en die effek van openbare ondersteuning. Hierdie tesis sal gebruik maak van die ekonomiese volhoubaarheid en openbare ondersteuning aanwysers om te bepaal of die GFIP beskou kan word as a mislukte megaprojek of nie. Na ‘n in-diepte study van die data en materiaal beskikbaar, sal hierdie beskrywende en verduidelikende studie wys dat die GFIP en verwante e-toll megaprojek inderdaad ‘n mislukte megaprojek is, as gevolg daarvan dat die GFIP megaprojek analise aandui dat die megaprojek misluk het in beide die ekonomiese volhoubaarheid en publieke ondersteunings aanwysers.
4

An analysis of implementing open road tolling through the Gauteng freeway improvement project

Malahleha, Thabiso 03 1900 (has links)
Thesis (MDF)--Stellenbosch University, 2011. / The aim of this research report is to analyse the feasibility of Open Road Tolling (ORT) and its development in South Africa through the Gauteng Freeway Improvement Project (GFIP). ORT represents the next generation of Electronic Toll Collection (ETC) and this research report will assess to what extent the GFIP scheme is in line with other comparable tolling schemes; and is the institutional environment amenable to ORT. This will allow one to gauge the feasibility of the scheme and its potential for acceptability and success. The research report outlines the number of risks that come with an ORT scheme and these include amongst others collection risk, enforcement, technology, privacy and public acceptance. The success of the GFIP will largely be determined by how well these risks are mitigated and how the benefits can be marketed to the users. The literature review illustrates that whether road pricing schemes have failed to move forward, have been implemented, are currently under development, or still in the planning stage as a concept there are several consistent lessons and critical success factors one should apply when structuring a scheme. In the discussions with stakeholders, the following conclusions with regards to the feasibility of ORT and its development in South Africa were as follows: The factors which need to be addressed include political risk, effective marketing of the scheme to the public, obtaining political will and support, building trust between the scheme developer and the user, managing perceptions and acknowledgement of the fact that the scheme will need to prove itself over time. Inadequate demonstration of equity for the user along with poor communication would compromise public acceptance and the success of the scheme. Incorporating interoperability yields benefits in terms in terms of network externalities, the ability to use a single transponder for multiple tolling plazas and points, along with the potential for alternative uses for the transponder. ORT as a viable solution for the GFIP is feasible from a technical point in that it's the only way in which one can collect tolls from a high volume network and not cause disruptions in the flow of traffic. However, there are a number of persistent residual risks that SANRAL cannot entirely mitigate and some fall under the realm of political risk. While SANRAL has applied best practice principles in structuring the GFIP with the aim of providing value for money for the user and as far as possible tackling the issue of affordability, there are certain realities, such as the recent global financial crisis, the infrastructure backlog of the country, users paying for roads which were free and challenges with overall service delivery which place a strain on the legitimacy of the GFIP ORT scheme.
5

Analysing the implementation process of open road tolling in Gauteng

Netshidzati, Ashley 28 October 2015 (has links)
M.Phil. (Engineering Management) / The daunting peak-hour traffic periods have affected Gauteng road users and the economy due to traffic congestion in the recent years. A total of 157 000 vehicles used the Gauteng freeway network each day in 2006, which went up to approximately 200 000 in 2011. This means that the average growth in traffic volumes had grown on average by 7% between 2006 and 2011. As a management strategy, The South African National Road Agency (SANRAL) launched the Gauteng Freeway Improvement Project (GFIP) in 2007 to improve the infrastructural network. The introduction of the GFIP road-user charging scheme in Gauteng has been followed by a renewed interest in the subject of urban road tolling both by practitioners and academics ...
6

Transport economic regulatory intervention in the transport infrastructure : a public-private partnership exploratory study

Maluleka, Khulumane John 31 January 2008 (has links)
The aim of this study is to determine whether the introduction of a transport economic regulatory authority would serve as a valid intervention mechanism in the Public-Private Partnership of the transport infrastructure in South Africa. In order to achieve this objective, the study focused on the analysis of the concept of Public-Private Partnership, and how it has unfolded in a number of industrialised countries. Much attention was devoted in examining how the Public-Private Partnership arrangements followed by the studied countries influenced the current transport infrastructure management process in South Africa. To deal with the above, a host of macro-environmental variables were analysed in respect of their potential impact on the South African Department of Transport. The establishment of various agencies by the Department of Transport was seen as a consequence of the influence of the prevailing environmental forces. The outcome of the analysis revealed that a sustainable transport infrastructural development is a product of genuine partnership between the public and private sectors. Competition for the market and the significance of such competition in the transport infrastructure were outlined. The main goal of competition within the context of this study is to diffuse the economic power of the toll road industry and the protection of the individual's fundamental rights. The study also unearthed a need to deepen the talent and skills of both public and private sector officials as this would enable them to protect the citizens' right to make well-considered choices in the toll road industry. The study identified a need to establish a transport economic regulatory authority that would control the market dynamics of power relationships in the transport industry. Such a body should be creative and need to have regulatory oversight over transport infrastructure. / Transport Logistics & Tourism / D. Comm.
7

Application of value for money assessment in public-private partnerships in the road transport sector : a case of the N4 (East) toll road

Muvirimi, Nyasha 12 1900 (has links)
Thesis (MDF)--Stellenbosch University, 2012. / ENGLISH ABSTRACT: The purpose of this research was to understand how value for money (‘VfM’), an important decision pillar in public procurement, is applied in South Africa, and compare the VfM regulated framework with other global practices in the United Kingdom, Canada, Australia, Singapore and Hong Kong. VfM is applied when deciding the most appropriate procurement method that utilises public funds in the most cost effective, equitable and transparent manner. Although VfM is vital in the public sector, it is one of the most misunderstood and controversial procurement aspects. The various actors in public procurement processes tend to complicate this key aspect due to their conflicting objectives in relation to a given project. Chief among these are the political influences on the public managers, which tend to manipulate the procurement choice. Consequently over the years, the VfM assessments performed before selecting a procurement method have not been publicly available, thereby increasing concern on whether VfM is achieved, particularly when involving the private sector through public-private partnership (‘PPP’) arrangements. The study explores the various components of VfM, which are the public sector comparator, risk allocation mechanisms, particularly for the road sector projects, discount rates and post project implementation monitoring systems. More importantly, the research analysed how these various aspects were assessed on procuring the N4 toll road. South African National Road Agency SOC Limited (‘SANRAL’), although it did not have the benefit of a PPP guideline as is the case now, it performed extensive feasibility studies and held a transparent procurement process before selecting the private sector party to the PPP. Interestingly, project that was pre-identified as a PPP procurement model and had political support from both the Mozambique and South African governments from inception in order to make it work. The comparative analysis of the South African PPP framework and the selected global PPP markets revealed that the local VfM guidelines were comparable in most aspects such as the PSC construction and risk management methodologies. However, the South African practices could be further improved with increased transparency incorporated in the procurement process such as the publication of the PPP contract once finalised – a practice common in the developed markets analysed. This will go a long way to increasing acceptance of the PPP procurement model in a market that is tainted with mistrust of same. There is need for the civil servants to be trained on the VfM assessment processes so that such analyses are not limited to PPP-type projects, but to conventionally-procured infrastructure projects for increased accountability and effective use of public funds.
8

Transport economic regulatory intervention in the transport infrastructure : a public-private partnership exploratory study

Maluleka, Khulumane John 31 January 2008 (has links)
The aim of this study is to determine whether the introduction of a transport economic regulatory authority would serve as a valid intervention mechanism in the Public-Private Partnership of the transport infrastructure in South Africa. In order to achieve this objective, the study focused on the analysis of the concept of Public-Private Partnership, and how it has unfolded in a number of industrialised countries. Much attention was devoted in examining how the Public-Private Partnership arrangements followed by the studied countries influenced the current transport infrastructure management process in South Africa. To deal with the above, a host of macro-environmental variables were analysed in respect of their potential impact on the South African Department of Transport. The establishment of various agencies by the Department of Transport was seen as a consequence of the influence of the prevailing environmental forces. The outcome of the analysis revealed that a sustainable transport infrastructural development is a product of genuine partnership between the public and private sectors. Competition for the market and the significance of such competition in the transport infrastructure were outlined. The main goal of competition within the context of this study is to diffuse the economic power of the toll road industry and the protection of the individual's fundamental rights. The study also unearthed a need to deepen the talent and skills of both public and private sector officials as this would enable them to protect the citizens' right to make well-considered choices in the toll road industry. The study identified a need to establish a transport economic regulatory authority that would control the market dynamics of power relationships in the transport industry. Such a body should be creative and need to have regulatory oversight over transport infrastructure. / Transport Logistics and Tourism / D. Comm.
9

Witbank-Middelburg toll road : some strategic considerations for affected businesses

Marx, Liezle 15 August 2012 (has links)
M.Comm. / The fundamental purpose of the dissertation was a descriptive analysis and a theoretical evaluation of the petroleum industry and its functions in South Africa, as well as the relevance of toll roads in South Africa. Toll roads provide the opportunity whereby an urgently needed road can be built at an earlier date than would be the case normally. The strategic management of businesses under normal market conditions has been studied extensively. Less importance has been given to the strategic management of businesses affected by external market forces such as quotas, import tariffs, restricted licenses and toll roads. South Africa has more than 200 000 kilometers of roads and more than seven million cars. Therefore demand for petrol has grown substantially over the last few years. There are ten different petroleum companies in South Africa; namely Afric Oil, BP, Caltex, Engen, Exel, Sasol, Shell, Tepco, Total and Zenex and there is no discernible difference between the fuels from the different oil companies. In May 1996, the governments of South Africa and Mozambique announced their vision and their objectives for the Maputo Development Corridor. In particular they expressed their belief that the corridor initiative held substantial opportunities for both the public and private sectors. The Trans African Concession (TRAC) was awarded the concession to develop the corridor. Concession grants the private sector a right to collect tollfees, which are used to service the loans incurred for: designing, construction, operations and maintenance of toll roads in the Maputo Development. The concessioning right usually extends for a period of 30 years after which the road is handed back to the South African National Road Agency. The first of five toll roads opened on the 8 December 1998 between Witbank and Middelburg. Tollfees are collected (R20,60 per car) by Plaza operators, and tariffs are adjusted annually. Toll Roads affect businesses, such as petrol stations, restaurants etc., due to high tollfees. Thereby some motorists use alternative routes. The study focuses on the petroleum industry, and more particularly on the retail of fuel and related products in the Maputo Development Corridor. An external market force in the form of the N3 toll road is affecting this market and industry. Consequently the strategic management of Shell Ultra City Middelburg and other affected businesses have to adapt from the task model to allow for the influence of the toll road. The toll road functions and annually toll tariff adjustments, formed the crux of this study. General strategic considerations are developed in the study to counter the effect of the toll road. Furthermore, a specific action plan is formulated to practically implement these general strategic considerations.

Page generated in 0.0911 seconds