• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Formelle und informelle Öffentlichkeitsbeteiligung in Infrastrukturplanungs- und Genehmigungsverfahren für Hoch- und Höchstspannungsnetze

Zirke, Daniel 09 November 2021 (has links)
Der europarechtlich vorgeprägte und national stark ausdifferenzierte Bedarfsplanungs- und Genehmigungsablauf für Hoch- und Höchstspannungsleitungsvorhaben ist durch ein umfassendes Beteiligungsregime zu Gunsten der Öffentlichkeit ausgestaltet. Im Rahmen der gegenständlichen Arbeit wurden sowohl die formellen als auch die informellen Beteiligungsmöglichkeiten der Öffentlichkeit analysiert, klassifiziert, kritisch hinterfragt und hinsichtlich der verschiedentlich anwendbaren normativen Vorgaben miteinander verglichen. Hierbei haben unter anderem europarechtlich das Vierte Energiebinnenmarktpaket aus den Jahren 2018 und 2019, national das Gesetz zur Beschleunigung des Energieleitungsausbaus aus dem Jahr 2019 und das Planungssicherstellungsgesetz aus dem Jahr 2020 sowie föderal das Umweltverwaltungsgesetz aus dem Jahr 2014 besondere Berücksichtigung gefunden. Insgesamt konnte die aktuelle Gesetzeslage, Rechtsprechung und Literatur bis Ende Juni 2020 in die vorliegende Untersuchung eingearbeitet werden.:Teil 1: Einführung Teil 2: Grundlagen der Öffentlichkeitsbeteiligung im Netzausbau Teil 3: Öffentlichkeitsbeteiligung im Rahmen der Bedarfsplanung Teil 4: Öffentlichkeitsbeteiligung im Rahmen der Korridor- und Trassenplanung Teil 5: (Temporäre) Wirkungen des PlanSiG auf die Öffentlichkeitsbeteiligung Teil 6: Gesamtbetrachtung zur Verbesserung des Beteiligungsregimes / The planning and approval process for high and extra high voltage power line pro- jects, which is predefined by European law and differentiated by German law, is designed in favour of the public through a comprehensive participation regime. In the context of this work, both the formal and the informal opportunities for public participation were analysed, classified, critically questioned and compared with one another in terms of the various normative requirements. Among other things, the Fourth European Internal Energy Market Package from 2018 and 2019, the national law to accelerate the expansion of power lines from 2019, and the law to ensure proper planning and approval procedures from 2020 as well as the federal law to standardise environmental administration law and to strengthen public participation in the environmental field from 2014 have been given special consideration. Overall, the current legal situation, the case law and the literature until the end of June 2020 have been incorporated into the present study.:Teil 1: Einführung Teil 2: Grundlagen der Öffentlichkeitsbeteiligung im Netzausbau Teil 3: Öffentlichkeitsbeteiligung im Rahmen der Bedarfsplanung Teil 4: Öffentlichkeitsbeteiligung im Rahmen der Korridor- und Trassenplanung Teil 5: (Temporäre) Wirkungen des PlanSiG auf die Öffentlichkeitsbeteiligung Teil 6: Gesamtbetrachtung zur Verbesserung des Beteiligungsregimes
2

Planejamento da expansão de sistemas de transmissão considerando análise de confiabilidade e incertezas na demanda futura /

Garcés Negrete, Lina Paola. January 2010 (has links)
Orientador: Rubén Augusto Romero Lázaro / Banca: Jose Roberto Sanches Mantovani / Banca: Anna Diva Plasencia Lotufo / Banca: Marcos Julio Rider Flores / Banca: Eduardo Nobuhiro Asada / Resumo: Nessa pesquisa tem-se por objetivo a análise teórica e a implementação computacional de duas propostas de solução ao problema de planejamento da expansão de sistemas de transmissão de energia elétrica considerando diferentes fatores relacionados com a confiabilidade do sistema e a adoção dos novos modelos de mercados elétricos. É importante notar, que no planejamento básico não são levados em conta esses importantes aspectos. Dessa forma, uma primeira aproximação considera um critério de confiabilidade para expandir o sistema, de forma que ele opere adequadamente no horizonte de planejamento satisfazendo um nível de confiabilidade pré-definido. O índice de confiabilidade utilizado para exigir esse nível de confiabilidade é o LOLE, que corresponde ao número médio de horas/dias em um período dado (normalmente um ano) no qual o pico da carga horária/diária do sistema possivelmente exceder'a a capacidade de geração disponível. O problema de planejamento considerando a confiabilidade é, portanto, formulado como um problema de otimização que minimiza o investimento sujeito ao critério de confiabilidade. O índice de confiabilidade para o sistema de transmissão é calculado para cada configuração, subtraindo o índice de confiabilidade do sistema de geração do sistema composto geração-transmissão (bulk power system ). Para calcular o índice no sistema composto geração transmissão, utiliza-se uma curva de duração de carga efetiva para este sistema. Esta curva acumulada de carga é obtida de um processo de convolução de outras duas curvas que representam a função de distribuição de probabilidade (FDP) das saídas aleatórias dos componentes do sistema e a curva de duração de carga, respectivamente. A avaliação de confiabilidade no sistema de geração é feita usando um método que calcula o índice de confiabilidade por meio dos momentos... (Resumo completo, clicar acesso eletrônico abaixo) / Abstract: This work aims to the theoretical analysis and computational implementation of two proposals for the transmission expansion planning problem considering several factors such as system reliability and new electricity market structures. It is important to observe, that the basic planning does not consider these issues. Therefore, one first approach considers a reliability criterion to expand the system, so that it operates in adequate conditions in the horizon planning while satisfying pre-defined limits in the reliability index. Transmission system reliability criterion regards to LOLE, which refers to the number of hours/days in a specified period of time (normally one year), in which the hourly/daily peak load possibly will exceed the available generation capacity. So, the planning problem considering reliability is formulated as an optimization problem that minimizes the investment subject to probabilistic reliability criterion. Reliability index for the transmission system is calculated for each configuration by subtraction of generation and bulk power reliability indexes. A composite power system effective load curve is used for reliability analysis of the bulk power system. This accumulate curve is obtained convolving two curves, one of them corresponding to a probability distribution function of the random outages of the system components, and the other one corresponding to the load duration curve. Reliability assessment in the generation system is done using a method that calculates the reliability index through the statistics moments of the frequency distribution of equivalents loads. This curve is obtained by convolving the generation units which are dispached in merit order. The proposed model is solved using the specialized genetic algorithm of Chu-Beasley (AGCB). Detailed results on two test systems are analyzed and discussed. A second approach to the transmission expansion... (Complete abstract click electronic access below) / Doutor
3

Planejamento da expansão de sistemas de transmissão considerando análise de confiabilidade e incertezas na demanda futura

Garcés Negrete, Lina Paola [UNESP] 25 February 2010 (has links) (PDF)
Made available in DSpace on 2014-06-11T19:30:50Z (GMT). No. of bitstreams: 0 Previous issue date: 2010-02-25Bitstream added on 2014-06-13T19:19:30Z : No. of bitstreams: 1 garcesnegrete_lpg_dr_ilha.pdf: 1723635 bytes, checksum: ec9b369023c0d16cf9bcbe29a4bc0ada (MD5) / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP) / Nessa pesquisa tem-se por objetivo a análise teórica e a implementação computacional de duas propostas de solução ao problema de planejamento da expansão de sistemas de transmissão de energia elétrica considerando diferentes fatores relacionados com a confiabilidade do sistema e a adoção dos novos modelos de mercados elétricos. É importante notar, que no planejamento básico não são levados em conta esses importantes aspectos. Dessa forma, uma primeira aproximação considera um critério de confiabilidade para expandir o sistema, de forma que ele opere adequadamente no horizonte de planejamento satisfazendo um nível de confiabilidade pré-definido. O índice de confiabilidade utilizado para exigir esse nível de confiabilidade é o LOLE, que corresponde ao número médio de horas/dias em um período dado (normalmente um ano) no qual o pico da carga horária/diária do sistema possivelmente exceder´a a capacidade de geração disponível. O problema de planejamento considerando a confiabilidade é, portanto, formulado como um problema de otimização que minimiza o investimento sujeito ao critério de confiabilidade. O índice de confiabilidade para o sistema de transmissão é calculado para cada configuração, subtraindo o índice de confiabilidade do sistema de geração do sistema composto geração-transmissão (bulk power system ). Para calcular o índice no sistema composto geração transmissão, utiliza-se uma curva de duração de carga efetiva para este sistema. Esta curva acumulada de carga é obtida de um processo de convolução de outras duas curvas que representam a função de distribuição de probabilidade (FDP) das saídas aleatórias dos componentes do sistema e a curva de duração de carga, respectivamente. A avaliação de confiabilidade no sistema de geração é feita usando um método que calcula o índice de confiabilidade por meio dos momentos... / This work aims to the theoretical analysis and computational implementation of two proposals for the transmission expansion planning problem considering several factors such as system reliability and new electricity market structures. It is important to observe, that the basic planning does not consider these issues. Therefore, one first approach considers a reliability criterion to expand the system, so that it operates in adequate conditions in the horizon planning while satisfying pre-defined limits in the reliability index. Transmission system reliability criterion regards to LOLE, which refers to the number of hours/days in a specified period of time (normally one year), in which the hourly/daily peak load possibly will exceed the available generation capacity. So, the planning problem considering reliability is formulated as an optimization problem that minimizes the investment subject to probabilistic reliability criterion. Reliability index for the transmission system is calculated for each configuration by subtraction of generation and bulk power reliability indexes. A composite power system effective load curve is used for reliability analysis of the bulk power system. This accumulate curve is obtained convolving two curves, one of them corresponding to a probability distribution function of the random outages of the system components, and the other one corresponding to the load duration curve. Reliability assessment in the generation system is done using a method that calculates the reliability index through the statistics moments of the frequency distribution of equivalents loads. This curve is obtained by convolving the generation units which are dispached in merit order. The proposed model is solved using the specialized genetic algorithm of Chu-Beasley (AGCB). Detailed results on two test systems are analyzed and discussed. A second approach to the transmission expansion... (Complete abstract click electronic access below)

Page generated in 0.1111 seconds