• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Optimized maintenance budget planning for DB Cargo locomotives

Niedecken, Timon January 2021 (has links)
In a regional railway signalling system, object controllers are the devices responsible for controlling Track Side Equipment and act as interfaces for TSE with the interlocking computer and the Traffic control system. However, associated cabling (signal and power cabling) and civil works pose a major capital investment and it is a source of significant Capital and Operational expenses, particularly in rural areas, where accessibility andconnectivity to power grid and to the interlocking are a problem. Furthermore, cables/signalling equipment are exposed to sabotage and theft in such areas. This can increase the total Life Cycle Cost even further. The Shift2Rail research programme, which was initiated by the European Union and railway stakeholders, tries to address this issue, and revamp the Object Controller concept through the project “TD2.10 Smart radio connectedwayside object controller”, where the aim is to develop a Smart Wayside Object Controller (SWOC). A SWOC is capable of wireless communication between central interlocking and TSE as well as decentralization of interlocking logic. These innovations can reduce the cabling required, increase the availability of diagnostic data, thus reducing maintenance and operational costs and can lead to power saving by utilizing local power sources. The most important impact of the SWOC is a significant reduction of CAPEX, OPEX and of total LCC for an installation utilizing SWOCs, instead of typical OCS.  This work focuses on estimating the LCC of a SWOC system and to compare it with a conventional OCS by developing an LCC model that covers both cases, as well as to use this model to examine when it is more profitable to implement a SWOC, instead of an OCS system. This is done by utilizing LCC analysis and combining a variety of methods in a parametric study. To that extend, a thorough analysis of a modern regional railway signallingsystem, as well as the basis for LCCA are being discussed. At the same time, both OC and SWOC systems are being described and factors affecting their cost discussed.  The methodology is comprised of the LCC modelling part as well as the collection of methods and techniques used to calculate the LCC of OC/SWOC systems and to estimate the costs of different sub-models and parameters of the process. For the modelling process, the station of Björbo was chosen, which operates under ERTMS-R system, but for the sake of the analysis it is assumed that the typical base system in place is an OCS and together withthe existing track layout and equipment it is used as the basis of the analysis. Finally, the formed LCC model is being used in a parametric study to examine how the LCC is affected by using OC or SWOC as well as how LCC responds to changes in parameters such as number of OC/SWOC, traffic density and local power installation cost for the Björbo station. / I ett regionalt järnvägssignalsystem är utdelar de enheter som ansvarar för att kontrollera spårutrustning och fungerar de som gränsyta för spårutrustning med ställverksdatorn och tågtrafikledning systemet. Dock, tillhörande kablar (signalkablar ock kraftkablar), samt anläggningsinfrastruktur utgör en stor kapitalinvestering och de är en källa till märkbar kapitalkostnad och driftskostnader, särskilt på landsbygdsområden, där tillgänglighet och anslutning till elnätet och ställverket är problematisk. Dessutom, kablar och signalutrustning utsätts för stöld och sabotage i sådana områden. Detta kan öka den totala livscykelkostnaden ytterligare. Shift2rail forskningsprogram, som genomförs av EU och järnvägsintressenter, försöker att ta itu med problemet och modernisera utdelar konceptet genom projektet “TD2.10 Smart Radio Connected Wayside Object Controller”, där målet är att utveckla en Smart Spårutrustning Utdelar, så kallade SWOC. En SWOC har kapacitet för trådlös kommunikation mellan central ställverket och spårutrustning, samt decentralisering av satällverkslogiken. Dessa innovationer kan minska nödvändig kabeldragning, öka tillgängligheten av diagnostiska data, vilket minskar underhålls- och driftskostnader och kan leda till energibesparing genom att använda lokala kraftkällor. Den viktigaste effekten av SWOC är en betydande minskning av kapitalkostnader, driftskostnader och totala livscykelkostnaden för en installation som använder SWOC istället för typiska utdelningsystemet. Detta examensarbete fokuserar på att uppskatta LCC för ett SWOC-system och jämföra det med en konventionell utdelingsystem genom att utveckla en LCC-modell som täcker båda fallen, samt att använda denna modell för att undersöka när det är mer lönsamt att implementera en SWOC istället av ett typiskt utdelingsystem. Detta görs genom att använda LCC-analys och kombinera en mängd olika metoder i en parametrisk studie. För att göradetta genomförs en grundlig analys av ett modernt regionalt järnvägssignalsystem, samt grunden för livscykelanalys. Samtidigt beskrivs både ett typiskt utdelingssystem - och SWOC-system samt faktorer som påverkar deras kostnad deskuteras. Metoden består av LCC-modelleringsdelen samt insamling av metoder och tekniker som används för att beräkna LCC för OC / SWOC-system och för att uppskatta kostnaderna för olika delmodeller och parametrar för processen. För modelleringsprocessen valdes stationen i Björbo, som arbetar under ERTMS-R-systemet, men för analysens skull antas att det typiska bassystemet på plats är en typisk OCS och tillsammans med befintlig planritning ochkabelplan är används som grund för analys. Slutligen används den bildade LCC-modellen i en parametrisk studie för att undersöka hur LCC påverkas genom att använda OC eller SWOC samt hur LCC reagerar på förändringar i parametrar såsom antal OC / SWOC, trafiktäthet och lokala kraftinstallationskostnader för Björbo-stationen.
2

Life Cycle Cost of Smart Wayside Object Controller / Livscykelkostnad av Smart Wayside Object Controller

Zarov, Filipp January 2021 (has links)
In a regional railway signalling system, object controllers are the devices responsible for controlling Track Side Equipment and act as interfaces for TSE with the interlocking computer and the Traffic control system. However, associated cabling (signal and power cabling) and civil works pose a major capital investment and it is a source of significant Capital and Operational expenses, particularly in rural areas, where accessibility andconnectivity to power grid and to the interlocking are a problem. Furthermore, cables/signalling equipment are exposed to sabotage and theft in such areas. This can increase the total Life Cycle Cost even further. The Shift2Rail research programme, which was initiated by the European Union and railway stakeholders, tries to address this issue, and revamp the Object Controller concept through the project “TD2.10 Smart radio connectedwayside object controller”, where the aim is to develop a Smart Wayside Object Controller (SWOC). A SWOC is capable of wireless communication between central interlocking and TSE as well as decentralization of interlocking logic. These innovations can reduce the cabling required, increase the availability of diagnostic data, thus reducing maintenance and operational costs and can lead to power saving by utilizing local power sources. The most important impact of the SWOC is a significant reduction of CAPEX, OPEX and of total LCC for an installation utilizing SWOCs, instead of typical OCS.  This work focuses on estimating the LCC of a SWOC system and to compare it with a conventional OCS by developing an LCC model that covers both cases, as well as to use this model to examine when it is more profitable to implement a SWOC, instead of an OCS system. This is done by utilizing LCC analysis and combining a variety of methods in a parametric study. To that extend, a thorough analysis of a modern regional railway signalling system, as well as the basis for LCCA are being discussed. At the same time, both OC and SWOC systems are being described and factors affecting their cost discussed.  The methodology is comprised of the LCC modelling part as well as the collection of methods and techniques used to calculate the LCC of OC/SWOC systems and to estimate the costs of different sub-models and parameters of the process. For the modelling process, the station of Björbo was chosen, which operates under ERTMS-R system, but for the sake of the analysis it is assumed that the typical base system in place is an OCS and together with the existing track layout and equipment it is used as the basis of the analysis. Finally, the formed LCC model is being used in a parametric study to examine how the LCC is affected by using OC or SWOC as well as how LCC responds to changes in parameters such as number of OC/SWOC, traffic density and local power installation cost for the Björbo station. / I ett regionalt järnvägssignalsystem är utdelar de enheter som ansvarar för att kontrollera spårutrustning och fungerar de som gränsyta för spårutrustning med ställverksdatorn och tågtrafikledning systemet. Dock, tillhörande kablar (signalkablar ock kraftkablar), samt anläggningsinfrastruktur utgör en stor kapitalinvestering och de är en källa till märkbar kapitalkostnad och driftskostnader, särskilt på landsbygdsområden, där tillgänglighet och anslutning till elnätet och ställverket är problematisk. Dessutom, kablar och signalutrustning utsätts för stöld och sabotage i sådana områden. Detta kan öka den totala livscykelkostnaden ytterligare. Shift2rail forskningsprogram, som genomförs av EU och järnvägsintressenter, försöker att ta itu med problemet och modernisera utdelar konceptet genom projektet “TD2.10 Smart Radio Connected Wayside Object Controller”, där målet är att utveckla en Smart Spårutrustning Utdelar, så kallade SWOC. En SWOC har kapacitet för trådlös kommunikation mellan central ställverket och spårutrustning, samt decentralisering av satällverkslogiken. Dessa innovationer kan minska nödvändig kabeldragning, öka tillgängligheten av diagnostiska data, vilket minskar underhålls- och driftskostnader och kan leda till energibesparing genom att använda lokala kraftkällor. Den viktigaste effekten av SWOC är en betydande minskning av kapitalkostnader, driftskostnader och totala livscykelkostnaden för en installation som använder SWOC istället för typiska utdelningsystemet. Detta examensarbete fokuserar på att uppskatta LCC för ett SWOC-system och jämföra det med en konventionell utdelingsystem genom att utveckla en LCC-modell som täcker båda fallen, samt att använda denna modell för att undersöka när det är mer lönsamt att implementera en SWOC istället av ett typiskt utdelingsystem. Detta görs genom att använda LCC-analys och kombinera en mängd olika metoder i en parametrisk studie. För att göradetta genomförs en grundlig analys av ett modernt regionalt järnvägssignalsystem, samt grunden för livscykelanalys. Samtidigt beskrivs både ett typiskt utdelingssystem - och SWOC-system samt faktorer som påverkar deras kostnad deskuteras. Metoden består av LCC-modelleringsdelen samt insamling av metoder och tekniker som används för att beräkna LCC för OC / SWOC-system och för att uppskatta kostnaderna för olika delmodeller och parametrar för processen. För modelleringsprocessen valdes stationen i Björbo, som arbetar under ERTMS-R-systemet, men för analysens skull antas att det typiska bassystemet på plats är en typisk OCS och tillsammans med befintlig planritning ochkabelplan är används som grund för analys. Slutligen används den bildade LCC-modellen i en parametrisk studie för att undersöka hur LCC påverkas genom att använda OC eller SWOC samt hur LCC reagerar på förändringar i parametrar såsom antal OC / SWOC, trafiktäthet och lokala kraftinstallationskostnader för Björbo-stationen.
3

Utbyte av ställverk på Roslagsbanans Östra Station / Replacement of interlocking system at Roslagsbanans Östra Station

Mahamud, Ahmed Abdi, Tayib, Ali Ahmed January 2021 (has links)
Ett signalställverk används för säker styrning av tågtrafiken. Ett datorställverk säkerställer atttåg kan framföras på en järnvägssträcka genom att låsa tågvägar och även förhindra otillåtnakombinationer av tågvägar. Kopplingen mellan de olika delarna på en bangård (objekten) ochställverket utförs med hjälp av Object Controllers (OC). Den svenska benämningen för OC ärutdelar. Spårledningar är bangårdsobjekt som används för att detektera positionen av tåg på enspecifik järnvägssträcka. Ställverk 95 ska ersätta Ställverk 85 på Östra Station. Detta arbete ska genom enlitteraturstudie och en systemanalys undersöka vilka effekter detta får på fördröjningarna i 75Hz växelströmsspårledningen (SASIB) och tonfrekvensspårledningen DigiCode, tillsammansmed fördröjningarna från Object Controller System (JZU840 och OCS950). Detta utfördesmed syftet om att ta reda på hur cykeltiden i Ställverk 95 påverkas av fördröjningarna frånspårledningarna och OC. Cykeltiden är tiden det tar för signalställverket att få enstatusuppdatering från OC, till att signalställverket skickar nya kommandon som ska utförasav objekten. Orsaken till tilläggsfördröjningarna för spårledningarna är en följd av kontaktstudsar.Kontaktstudsarna uppstår när spårledningsreläerna ändrar position och innebär att ankaret ireläet inte stannar av direkt utan studsar för att sedan stabilisera. Om reläet i spårledningarnasnabbare kan garantera en absolut lägesändring, är det möjligt att minska cykeltiden och ökakapaciteten på Östra Station. / Railway interlocking is used for safe control of train traffic. A computer based interlockingsystem ensures that trains can be driven on a railway line by locking train paths and preventingunauthorized combinations of train paths. The connection between the different parts of a yard(objects) and the interlocking system is performed with the help of Object Controllers (OC).The Swedish name for OC is “utdelar”. Track circuits are railway objects used for thedetection of trains on a specific railway section. EBILOCK 950 will replace EBILOCK 850 at Östra Station. Through a literature study and asystem analysis, this work will investigate the effects this has on delays in the 75 Hz AC trackcircuit (SASIB) and the audio frequency track circuit DigiCode, together with the delays fromthe Object Controller Systems, JZU840 and OCS950. This was done with the aim of findingout how the cycle time in EBILOCK 950 is affected by the delays from the track circuits andOC. The cycle time is the time it takes for the interlocking system to receive a status updatefrom OC, until the interlocking system sends new commands to be executed by the objects. The reason for the additional delays for the track circuits is a consequence of contact bounces.The contact bounces occur when the track circuit relay change position and means that thearmature in the relay does not stop immediately but bounces and the stabilizes. If the relay inthe track circuits can guarantee an absolute change of position more quickly, it is possible toreduce the cycle time and increase the capacity at Östra Station.

Page generated in 0.029 seconds