1

Lathund för val av förband mellan transformator och ställverk

Almqvist, Gunilla January 2002 (has links)
No description available.
2

Lathund för val av förband mellan transformator och ställverk

Almqvist, Gunilla January 2002 (has links)
No description available.
3

Selektivplan upprättad i samband med utbyte av generatorer på Arctic Paper

Deng, Donglu January 2016 (has links)
Den här rapporten innehåller en selektivplan som upprättats i samband med utbyte av tre generatorer på Arctic Paper i Munkedal, samt flera selektivplansuppdateringar i övriga skydd. Arbetet har som syfte att bygga upp fördjupande kunskap i säkringsfri teknik i industriella elanläggningar, vilket genomförs som ett examenarbete för högskoleutbildning som elkraftsingenjör. På pappersbruket finns idag tre gamla vattenkraftsgeneratorer. Två av de tre nuvarande generatorerna är små och mycket gamla, generatorer som ska bytas ut mot två nya 3MVA synkrongeneratorer. En av de gamla generatorerna ska användas även i framtiden som reserv. Målet med ombyggnadsprojektet är att öka effekten med upp till tre gånger samt att fördubbla energi produktionen. Ställverk till generatorerna har specificerats tidigare i ombyggnadsprojektet. Selektivplanen inkluderar inställningar av reläskydd och effektbrytare för generatorerna. Dessutom kommer befintliga överströmsskydd i anläggningen beaktas. Rapporten baseras på selektivitetsteori och beräkningar av kortslutningsströmmar. Rapporten innefattar även uppdatering av vissa selektivplaner i den befintliga elanläggningen i pappersbruket, detta genom att diskutera problemet och justera inställningar av de befintliga reläskydden Tekniska beräkningar och reläinställningsplaner ska fungera som verifikation och dokumentation.
4

Selektivbedömning för en 690V fördelning på SCA Edet Bruk

Ivarsson, Fredrik January 2006 (has links)
<p>Examensarbetet visar en selektivbedömning för lågspänningställverk T15 på SCA Edet bruk. Ställverket har ett 40 tal motordrifter och matas av en 690V transformator på 3,5MVA. Grundprinciper för de vanligaste lågspänningsskydden presenteras samt mer specifika detaljer om installerade skydd i aktuellt ställverk. Olika typer av selektivitet är kortfattat presenterat i rapporten. Vid beräkning och dokumentering med hjälp av datorprogrammet Febdok visade det sig att installerade skydd inte fanns med i programmets skyddsregister. Implementering har skett för merparten av skydden i anläggningen. Arbetet påvisar hur programmet Febdok arbetar samt redovisar några av de selektivplaner programmet genererat. Tyngdpunkten läggs på att kontrollera felmeddelanden som programmet genererar och relatera det till anläggningen. Ett av felen har varit att kortslutningsströmmen i ställverket överstiger brytares märkdata. Anledningen till detta är att kortslutningseffekten ökat i matande nät till transformatorn sedan byggnation. Hållfastheten för kablar har kontrollerats enligt svensk standard med avseende på stötströmmen vid en kortslutning. Kontrollen visar att några grupper inte uppfyller svensk standard.</p>
5

Selektivbedömning för en 690V fördelning på SCA Edet Bruk

Ivarsson, Fredrik January 2006 (has links)
Examensarbetet visar en selektivbedömning för lågspänningställverk T15 på SCA Edet bruk. Ställverket har ett 40 tal motordrifter och matas av en 690V transformator på 3,5MVA. Grundprinciper för de vanligaste lågspänningsskydden presenteras samt mer specifika detaljer om installerade skydd i aktuellt ställverk. Olika typer av selektivitet är kortfattat presenterat i rapporten. Vid beräkning och dokumentering med hjälp av datorprogrammet Febdok visade det sig att installerade skydd inte fanns med i programmets skyddsregister. Implementering har skett för merparten av skydden i anläggningen. Arbetet påvisar hur programmet Febdok arbetar samt redovisar några av de selektivplaner programmet genererat. Tyngdpunkten läggs på att kontrollera felmeddelanden som programmet genererar och relatera det till anläggningen. Ett av felen har varit att kortslutningsströmmen i ställverket överstiger brytares märkdata. Anledningen till detta är att kortslutningseffekten ökat i matande nät till transformatorn sedan byggnation. Hållfastheten för kablar har kontrollerats enligt svensk standard med avseende på stötströmmen vid en kortslutning. Kontrollen visar att några grupper inte uppfyller svensk standard.
6

Projektering av elkraftanläggning för fläktprov : dimensionering av transformator, kablar mm

Fransson, David January 2006 (has links)
Fläkt Woods har ett fläktlab i Växjö där man utför kund och leveransprover av axiella fläktar. Befintlig anläggning är i dag bristfällig när det gäller driftsäkerhet och personsäkerhet. Även möjligheten att köra varvtalsreglerat är idag begränsad. Uppgiften är att projektera en ny anläggning omfattande en ny jordkabel, mellan- och lågspänningsställverk, transformatorer, kopplingsutrustningar och frekvensomriktare.
7

Projektering av elkraftanläggning för fläktprov : dimensionering av transformator, kablar mm

Fransson, David January 2006 (has links)
<p>Fläkt Woods har ett fläktlab i Växjö där man utför kund och leveransprover av axiella fläktar.</p><p>Befintlig anläggning är i dag bristfällig när det gäller driftsäkerhet och personsäkerhet. Även möjligheten att köra varvtalsreglerat är idag begränsad.</p><p>Uppgiften är att projektera en ny anläggning omfattande en ny jordkabel, mellan- och lågspänningsställverk, transformatorer, kopplingsutrustningar och frekvensomriktare.</p>
8

Byte från IEC 103 till IEC 61850 : Förstudie / Changing from IEC 103 to IEC 61850 : Feasibility study

Nilsson, Daniel, Eriksson, Adam January 2023 (has links)
The steel company SSAB in Borlänge will, in the near future, replace its protective relays in one of their substations due to the condition and age of the relays. In connection with the change, SSAB intended to switch the current communication protocol IEC 60870-5-103 (IEC 103) to IEC 61850. They were thus interested in knowing what differences there were between these protocols and what were the technical and economical pros and cons for the change. To answer SSAB's questions, this bachelor thesis project was initiated with the aim of a feasibility study regarding the relays change and the protocol switching. To this purpose, the relevant parts of the substation and its functions were first examined to have an overall picture and the understanding of how they worked and interacted. After that, the communication protocols IEC 103 and IEC 61850 were investigated separately and comparatively. After a few weeks a visit was paid to SSAB to visually see what was to be done and to obtain a better understanding. During the visit, the substation that would receive new protection relays were shown and how their parts in the system were connected and interacted. Besides, other electrical devices were also shown, for example, large step-down transformers and a capacitor bank. After this, further study of the protocols, the relays as well as the associated parts were conducted and the information collected. Finally, the collected information was analysed, compared and documented in this thesis to generate a result and a comparison. From this feasibility study, it is clear that the new protocol had many advantages technically and some economically, which in particular include: 1) communication where IEC 103 uses master/slave at speeds up to 10 Mbit/s and IEC 61850 uses client/server and peer to peer at speeds between 100 Mbit/s to 1 Gbit/s; 2) connection where IEC 103 was point to point and with IEC 61850 it will be connected in ring formation for better redundancy; 3) interoperability where IEC 103 was limited by vendor specific codes, whereas IEC 61850 enabled interoperability through a common language and file format called SCL.
9

Rekommendationer inför konstruktion av mellanspänningsställverk : ett underhållsperspektiv

Nilsson, Rikard January 2009 (has links)
<p>OKG AB äger de tre kokvattenreaktorerna Oskarshamn 1, 2 och 3. Kärnkraftverket ligger i Simpevarp norr om Oskarshamn. Examensarbetet har utförts på Oskarshamn 1 inom ett projekt som kallas CEM. Oskarshamn 1 togs i drift 1972 och kan leverera en elektrisk effekt på 491 MW.</p><p>Examensarbetet behandlar underhållsaspekter som bör tas hänsyn till vid projektering och konstruktion av det nya automatiskt gasturbinsäkrade 6,3 kV ställverket i system 642. Ställverket är huvudfördelningsställverk inom Oskarshamn 1 och ska bytas ut på grund av hög ålder samt brist på reservdelar.</p><p>I syfte att uppnå hög driftsäkerhet och tillgänglighet för det nya ställverket har aspekter som förbättrar dess funktionssäkerhet, underhållsmässighet och underhållssäkerhet specificerats. Förslag på ny lastfördelning samt uppställning av ställverkets fack ges också.</p><p>Resultatet av examensarbetet är de framtagna underhållsaspekter som kan tillämpas vid projektering och konstruktion av ställverket. De viktigaste underhållsaspekterna som tagits fram är att utrustningen ska vara personsäker, det ska finnas tillräckligt med utrymme i facken för att kunna utföra underhållsarbete samt att fullständig dokumentation ska levereras samtidigt som utrustningen. Ett förslag till ny lastfördelning av ställverkets belastningar har utförts utifrån en teknisk specifikation. Förslaget på uppställning av ställverkets fack tyder på att tillräckligt utrymme finns i befintliga ställverksrum.</p> / <p>OKG AB is the owner of the three boiling water reactors Oskarshamn 1, 2 and 3. The nuclear power plant is located in Simpevarp north of Oskarshamn. The thesis has been carried out at Oskarshamn 1 within a project called CEM. Oskarshamn 1 started to produce electricity in 1972 and can today deliver an electrical power of 491 MW.</p><p>The thesis considers maintenance aspects which are to be taken into consideration before planning and construction of the new automatic gas turbine secured switchgears in system 642. The switchgears are the main distribution switchgears within Oskarshamn 1 and are to be replaced because of high age and lack of spare parts.</p><p>In purpose to achieve high availability performance and availability for the switchgears, aspects which improves the reliability, maintainability and maintenance supportability has been specified. Suggestion of new distribution of the loads between the busbars and arrangement of the cubicles has also been carried out and specified.</p><p>The results of the thesis are the specified maintenance aspects which can be used when planning and constructing the switchgears. The most important maintenance aspects are that the equipment has high personnel safety, that there is enough space in the cubicles to perform maintenance and that a complete documentation is delivered together with the equipment. Suggestion of new load distribution between the busbars has been carried out with the help of a technical specification. The suggestion of new arrangement for the switchgears implies that there is enough space in the existing electrical room for the switchgears.</p>
10

Rekommendationer inför konstruktion av mellanspänningsställverk : ett underhållsperspektiv

Nilsson, Rikard January 2009 (has links)
OKG AB äger de tre kokvattenreaktorerna Oskarshamn 1, 2 och 3. Kärnkraftverket ligger i Simpevarp norr om Oskarshamn. Examensarbetet har utförts på Oskarshamn 1 inom ett projekt som kallas CEM. Oskarshamn 1 togs i drift 1972 och kan leverera en elektrisk effekt på 491 MW. Examensarbetet behandlar underhållsaspekter som bör tas hänsyn till vid projektering och konstruktion av det nya automatiskt gasturbinsäkrade 6,3 kV ställverket i system 642. Ställverket är huvudfördelningsställverk inom Oskarshamn 1 och ska bytas ut på grund av hög ålder samt brist på reservdelar. I syfte att uppnå hög driftsäkerhet och tillgänglighet för det nya ställverket har aspekter som förbättrar dess funktionssäkerhet, underhållsmässighet och underhållssäkerhet specificerats. Förslag på ny lastfördelning samt uppställning av ställverkets fack ges också. Resultatet av examensarbetet är de framtagna underhållsaspekter som kan tillämpas vid projektering och konstruktion av ställverket. De viktigaste underhållsaspekterna som tagits fram är att utrustningen ska vara personsäker, det ska finnas tillräckligt med utrymme i facken för att kunna utföra underhållsarbete samt att fullständig dokumentation ska levereras samtidigt som utrustningen. Ett förslag till ny lastfördelning av ställverkets belastningar har utförts utifrån en teknisk specifikation. Förslaget på uppställning av ställverkets fack tyder på att tillräckligt utrymme finns i befintliga ställverksrum. / OKG AB is the owner of the three boiling water reactors Oskarshamn 1, 2 and 3. The nuclear power plant is located in Simpevarp north of Oskarshamn. The thesis has been carried out at Oskarshamn 1 within a project called CEM. Oskarshamn 1 started to produce electricity in 1972 and can today deliver an electrical power of 491 MW. The thesis considers maintenance aspects which are to be taken into consideration before planning and construction of the new automatic gas turbine secured switchgears in system 642. The switchgears are the main distribution switchgears within Oskarshamn 1 and are to be replaced because of high age and lack of spare parts. In purpose to achieve high availability performance and availability for the switchgears, aspects which improves the reliability, maintainability and maintenance supportability has been specified. Suggestion of new distribution of the loads between the busbars and arrangement of the cubicles has also been carried out and specified. The results of the thesis are the specified maintenance aspects which can be used when planning and constructing the switchgears. The most important maintenance aspects are that the equipment has high personnel safety, that there is enough space in the cubicles to perform maintenance and that a complete documentation is delivered together with the equipment. Suggestion of new load distribution between the busbars has been carried out with the help of a technical specification. The suggestion of new arrangement for the switchgears implies that there is enough space in the existing electrical room for the switchgears.