• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 22
  • 2
  • 1
  • 1
  • 1
  • Tagged with
  • 32
  • 32
  • 16
  • 13
  • 10
  • 9
  • 7
  • 6
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

An evaluation of production output for in situ concrete work

Price, Andrew D. F. January 1986 (has links)
The overall aim of this thesis is to develop reliable methods of measuring output levels for construction plant and labour, with a view to establishing realistic output rates for concreting operations. This thesis demonstrates that most of the variability in production rates can be quickly explained, leaving relatively constant levels of output f or individual construction operations (i.e. basic operation times). The primary factors in determining output rates were found to be work rate, delays and waiting caused by poor management, and poor motivation. The latter two items accounted f or more than fifty per cent of the available working time on many sites, whereas work rate varied only slightly. This last finding may be surprising, but the results indicated that when work was being done the effort applied appeared fairly constant to the observer. However, the time spent working was largely dependent upon the level of motivation induced through the payment system. Where a combination of good direct supervision and satisfactory financial incentives were present, high levels of motivation were observed, conversely, low motivation occurred on sites where minimum day-work payments were present. Investigations into several construction trades indicate that work study techniques can be modified to meet the requirements of most construction operations, sites and companies, whether the requirements be a complex synthesis of basic operation times or the more simple determination of site efficiency. The key to this portability lies in the isolation of basic operation times via the application of site efficiency factors. In this thesis, primary work study techniques are identified and discussed. The need for specific construction work study techniques is shown to be of paramount importance. The results from over seventy concrete pours are combined and statistically analysed to produce realistic output rates arid current levels of production. Site factors are combined and statistically analysed to produce a relationship between efficiency and level of remuneration. A comparison is drawn between: the production rates achieved on several sites; and the output rates currently being used in the planning and estimating processes.
2

Explosive high-velocity metal forming

Amrhein, Gareth Alan January 1968 (has links)
There is no abstract available for this thesis.
3

Evaluating constructivist teaching and learning of social work practice

黃浪詞, Wong, Long-chi, Rinna. January 2002 (has links)
published_or_final_version / Social Work and Social Administration / Doctoral / Doctor of Philosophy
4

Lai Chi Chong as a fieldtrip destination for the new senior secondary geography curriculum

Tsui, Sau-ngan., 徐秀銀. January 2011 (has links)
published_or_final_version / Applied Geosciences / Master / Master of Science
5

Exercise of tied dairy cows during the winter : aspects of motivation and preference /

Loberg, Jenny, January 2005 (has links) (PDF)
Licentiatavhandling (sammanfattning) Skara : Sveriges lantbruksuniversitet, 2005. / Härtill 2 uppsatser.
6

To Determine a Satisfactory Course of Study in Ornamental Iron for Senior High Schools in Terms of Pupils' Interest, Home Needs, Good Design, and by an Analysis of the Field

Coleman, Ralph Monroe 08 1900 (has links)
This thesis is intended to address the need for ornamental iron classes at the senior high school level.
7

Lean manufacturing production management model to increase the efficiency of the production process of a MSME company in the chemical sector

Mau, Milagros, Ramos, Roger, Llontop, José, Raymundo, Carlos 01 January 2019 (has links)
In recent decades, the demand for a wide variety of products, lead to the requirement of having a reduced cost of manufacturing, shorter cycle times and perfect quality; forcing companies to implement different engineering techniques to have the best manufacturing system. With which it seeks to efficiently control the process, provide an optimal area of work, establish performance standards with respect to the operations that the company performs, thus generating better results in the organization to achieve higher levels of user satisfaction. In the case of the study, the main line of production in the company was analyzed, detecting that representative costs originated from reprocessing and downtime. The result of greater impact obtained was the reduction of the problems in one (60%) and (15%) respectively. In this way, it is expected that companies in the paint industry or products related to the sector can use the results obtained as a reference in their process of continuous improvement, improving the management and performance of the organization and customer satisfaction.
8

A study of content material for art metalwork in the junior high school

Keiler, Emil E. 01 January 1946 (has links) (PDF)
In a General Metal Shop, Art Metalwork is one of the activities used to round out a general study of the metals field. That it is a valid subject to be taught in this field of activity is shown by the fact that Art Metalwork is included as a center of activity in a number of state studies in the Industrial Arts curriculum. The Pennsylvania state study of Industrial Arts lists Art Metalwork as a center of activity in the Metals area. The Connecticut state study in Industrial Arts lists Art Metal under General Metalwork. The New York state course for Industrial Arts also includes Art Metalwork as a center of activity in General Metalwork.
9

A study of the conditions influencing the present state of fieldwork teaching in lower secondary schools in Hong Kong

Ip, Kim-wai, William., 葉劍威. January 1988 (has links)
published_or_final_version / Education / Master / Master of Education
10

An analysis of the expressed training needs of county agricultural extension agents in Kansas

Abdul-Hadi, Nazeeh. January 1963 (has links)
Call number: LD2668 .T4 1963 A23 / Master of Science

Page generated in 0.0578 seconds