• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 4
  • 1
  • Tagged with
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • 3
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Beneficiary dependence on the South African Working for Water Programme : a multi-site case study of four projects in the Western Cape

Hough, Jan Anton 12 1900 (has links)
Thesis (MA (Sociology and Social Anthropology))--University of Stellenbosch, 2010. / ENGLISH ABSTRACT: South Africa’s natural environment is internationally recognised for its biodiversity, and therefore deep concern exists regarding the significant impact of invasive alien species (IAS) on that biodiversity. To combat the spread of IAS in South Africa, the national Working for Water (WfW) Programme was established in 1995. In addition to the clearing of IAS, the programme has also been designed to provide employment and empowerment to the marginalised sectors of South African society. With regard to the latter, WfW forms part of South Africa’s Expanded Public Works Programme (EPWP), and can be defined as a workfare programme, since it provides paid employment, rather than welfare payment. Following a contractor development approach, it also intends to create independent entrepreneurial contractors who, ideally, should ‘exit’ WfW, by being absorbed in the broader labour market. However, anecdotal evidence indicates that, since the establishment of WfW, many of its intended beneficiaries have become highly dependent on such employment, and therefore do not wish to “exit” the programme. Also, mounting concern regarding beneficiary dependence on Public Works Programmes in general, has spurred numerous academic debates on welfare dependence, as well as attempts to explain variability in dependence on government support. This thesis reports on a multi-site case study of beneficiary dependence on four WfW projects, which was undertaken in four CapeNature reserves in the Western Cape province of South Africa. Five broad research questions were formulated, which relate to the extent of beneficiaries’ dependence on the projects concerned, as well the sociological factors that may contribute to such a phenomenon. The data collected for this study were analysed with reference to various theories of state dependence. The beneficiaries were found to have become highly dependent, mostly in a financial sense, on the WfW projects studied, but also in regard to expectations of remaining in the WfW Programme in future. Such dependence is largely due to WfW having become engrained in beneficiaries’ social structure to such an extent, that it affects both their choices and their actions. Fearing a return to the conditions of farm labour, or the inability to escape the culture of poverty and/or marginalisation they experienced before joining WfW, seems to have resulted in the “unanticipated consequence” of workers being reluctant to exit from the programme, on which they have become dependent for their income and social standing. In the light of these findings, the thesis also briefly reflects upon South Africa’s EPWPs, with the conclusion of the case study offering at least a partial solution to improving the WfW Programme as an EPWP. / AFRIKAANSE OPSOMMING: Suid-Afrika se natuurlike omgewing word internasionaal erken vir sy biodiversiteit, en om hierdie rede bestaan daar goot bekommernis oor die beduidende uitwerking van uitheemse indringerspesies (UIS) op hierdie biodiversiteit. Om die verspreiding van UIS in Suid-Afrika te bekamp, is die Nasionale Werk vir Water (WfW) Program in 1995 gestig. Benewens die verwydering van UIS, is die program ook ingestel op werkverskaffing en bemagtiging van die gemarginaliseerde sektore van die Suid-Afrikaanse samelewing. Met betrekking tot laasgenoemde vorm WfW deel van die Suid-Afrikaanse Uitgebreide Openbare Werke Program (UOWP), en kan gedefineër word as ‘n werkswelsynsprogram, met die klem op die verskaffing van werk teen betaling, eerder as bloot net ’n welsynsbetaling. WfW volg ‘n kontrakteur-ontwikkelingsbenadering, waarvolgens kontrakteurs ontwikkel word, wat, ideaal gesien, die program as entrepreneurs kan verlaat en as sodanig in die breër arbeidsmark geabsorbeer kan word. Nietemin, in die praktyk wil dit tans egter voorkom asof die veronderstelde begunstigdes van WfW eerder hoogs afhanklik geraak het van die werk en dit derhalwe nooit wil verlaat nie. Die stygende kommer rakende begunstigde afhanklikheid van Openbare Werke Programme oor die algemeen, het reeds oorsprong verleen aan menige akademiese debatte oor welsynsafhanklikheid, sowel as pogings om verskille in omvang van afhanklikheid van regeringsondersteuning te verduidelik. Die tesis rapporteer oor ’n veelligging gevallestudie oor begunstigde afhanklikheid van vier WfW-projekte, wat geleë is in vier CapeNature reservate in die Wes-Kaapprovinsie van Suid-Afrika. Vyf breë navorsingsvrae is ontwerp, wat verband hou met die omvang van afhanklikheid van hierdie spesifieke projekte, sowel as die sosiologiese faktore wat tot die ontwikkeling van hierdie verskynsel sou kon bydra. Data is ontleed met verwysing na verskeie teorieë van staatsafhanklikheid. Daar is bevind dat begunstigdes hoogs afhanklik geraak het, hoofsaaklik in ‘n finansiële sin, van die bestudeerde WfW-projekte, maar ook verwagtinge het om in die toekoms deel te bly van die WfW-Program. Hierdie afhanklikheid spruit voort daaruit dat die begunstigdes se sosiale struktuur tot so ‘n mate met WfW verweef geword het, dat dit ’n uitwerking het op die werkers se keuses, asook hul optrede. ’n Vrees om terug te keer na die omstandighede van plaaswerk, of die onvermoë om te ontvlug van die kultuur van armoede en/of marginalisering wat hulle ervaar het voor deelname aan WfW, het skynbaar die “onbedoelde gevolg” gehad dat werkers onwillig is om te tree uit die program waarvan hulle afhanklik geraak het vir hul inkomste en sosiale stand. In die lig van hierdie bevindinge reflekteer hierdie tesis ook kortliks oor Suid-Afrika se UOWP, met die gevolgtrekking van die gevallestudie wat ten minste ‘n gedeeltelike oplossing bied ter verbetering van die WfWProgram, as ’n UOWP.
2

Impact of the Turn Table Trust Working for Water Project on fuelwood supply and household income of the rural Bulwer community.

Naude, Dean Charles. January 1999 (has links)
In the context of the post-apartheid era and under the new Government of National Unity, the Reconstruction and Development Programme (RDP) was initiated in 1994. To assist in the realisation of the goals of this programme the macro-economic strategy, Growth, Employment and Redistribution (GEAR), was implemented in 1996. It was within these frameworks that the Department of Water Affairs and Forestry (DWAF) launched its Working for Water (WFW) programme in October 1995. This programme was based on three pillars, namely: enhancing water supply and water security; creating jobs, building communities and improving quality of life and; conserving ecological functioning and biological diversity. Since October 1995 the Working for Water Programme has created 42 059 jobs, 220 884 hectares have been cleared with follow-up clearing in 55 731 hectares as part of the programme strategy to enhance water supply. Investment has been made in 240 projects, with a budget of R365 147 259 as at 31 March 1998. The impact of the Turn Table Trust WFW Project, a sub-project of the Central Umkomaas WFW Project, was examined in terms of fuelwood supply and household income of three small rural communities, namely: Xosheyakhe, Intabamakhaba and Mkhohlwa, referred to in this dissertation as the Rural Bulwer community. The research was carried out by means of questionnaire interviews and a workshop held at the Pholela Tribal court. The results of this study indicate that the Bulwer community depend on four energy types, in order of importance; wood, paraffin, dung and electricity. Many of the households perceive that, since the Turn Table Trust WFW Project began in the area in November 1995, there is less wood available and trees which are used for fuelwood are being cleared. Certain areas have felt the impacts of the clearingprogramme. People who have access to electricity still rely on fuelwood as they can not afford to use electricity exclusively. Indigenous forests are important as a source of fuelwood and for the harvesting of medicinal plants. The indigenous forests could be put under severe stress if wattle becomes unavailable forfuelwood purposes. The impact of the Turn Table Trust WFW Project on the fuelwood supply of the Bulwer community is small at present, but likely to increase. Households that have members employed by the Project, rely on this income to cover most household expenses. These households struggle to survive if or when employment by the Turn Table Trust WFW Project is periodically terminated. The businesses in Bulwer have also come to rely on the income earned by those employed by the Project. The Working for Water programme has far reaching implications for a local community and its surrounds and these need to be taken into account when both beginning and, importantly, ending a project in an area. / Thesis (M.Env.Dev.)-University of Natal, Pietermaritzburg, 1999.
3

The development of independent contractors within the Working for Water Programme over a twenty-four month period : a programme evaluation : Western region, Eastern Cape

Knipe, Andrew January 2005 (has links)
This research is concerned with the development of independent contractors within the Working for Water Programme over a twenty-four month period. The meaningful participation of previously disadvantaged South Africans fall within the ambit of black economic empowerment. The Government Gazette (1997: No. 1820) defines black economic empowerment as a deliberate programme to achieve the meaningful participation of disadvantaged South Africans in the mainstream economy as managers, owners of capital and employees. The purpose of this research was to evaluate the contractors within the Western Region of the Eastern Cape, in order to assess how they have developed as independent contractors within the developmental framework provided by the Working for Water Programme. This developmental framework takes place over a 462-day period or roughly 24 months. The evaluation aimed to determine whether the two-year development period sufficiently prepared contractors for competition in the open market and if contractors had acquired the necessary skills to run a successful business. A formative programme evaluation was used as a tool of analysis to identify areas of weakness and establish priorities for improvement. A qualitative research approach was followed, guided by an adapted version of the Context, Input, Process and Product approach to evaluation (Parlett and Hamilton cited in Calder, 1995, p.25). Using structured interviews comprising of closed and open ended questions, data was gathered from thirty contractors, five managers and one Senior Executive Officer within the Western Region of the Eastern Cape. An interview was also conducted with the Regional Programme leader of the Eastern Cape. Further data collection techniques included documentary research. Data was analysed using qualitative data analysis techniques described by Thorne (1997, p.118), as relying on inductive reasoning to interpret and structure the meanings that can be derived from the data. Passages of interest were marked so that the data could be reduced to a manageable size as described by Seidman (1991, p.91-1 01) and various categories were developed that had commonalties and thematic connections. The Working for Water Programme aims to exit contractors successfully after a twenty-four month developmental period. The Working for Water Programme has formalised its development framework through a training matrix in which the required training at contractor level is outlined. The finding of the research is that the current contractor development programme do not adequately prepare contractors for independence and entrepreneurship in a competitive market. There is no co-ordinated development of predetermined skills. Contractors are not able to articulate what their plans are after exit from the WFW Programme. No concrete evidence of actively pursuing alternative contract opportunities was evident from contractors who were about to exit the Programme and there is no person to champion the cause of meaningful post exit opportunities. The main recommendations from this research are that contractors be selected via an application system rather that appointment through steering committees. Selected contractors must be medically fit and at least have a matriculation certificate. Contractors should be assessed on a 6-monthly basis and contractors not achieving a minimum competency level must be removed from the programme. Managers should also have basic competency levels in order to facilitate skill transfer through a mentorship process. The charge out rate of equipment should be revised every six months. The charge out rates should also be increased significantly to cater for the harsh conditions under which contractors are operational. A "champion" needs to be appointed which will actively seek exit opportunities for trained contractors. This person will also seek to develop functional partnerships with various private and government institutions to create opportunities for exited contractors.
4

Process evaluation of social development interventions of the Working for Water Programme in Mamathola and Great Letaba Projects

Mangoale, Nani Thereza 12 1900 (has links)
Thesis (MPA (School of Public Management and Planning))--University of Stellenbosch, 2009 / ENGLISH ABSTRACT: The purpose of this study was to conduct a process evaluation of the Working for Water Social Development interventions as determined in the Medium Term Strategic Plan for 2003-2007. The study focused on the two projects namely Great Letaba and Mamathola projects within the Tzaneen Management Area in Limpopo. The study focused on whether the recruitment and selection process, followed within Working for Water, fosters the employment of equity targets as determined in the Expanded Public Works Programme Guidelines and the Ministerial Determination for Special Public Works Programme. The study also evaluated the process followed in the implementation of HIV and AIDS programmes as a Social Development intervention. Lastly, the study evaluated the processes followed during the implementation of the Skills Development and Training programme within Working for Water. The theoretical background focused on the Social Development theories as well as evaluation theories. In addition the study used the Working for Water Norms and Standards, HIV and AIDS policy, Skills Development and Training Guidelines as the basis for the process evaluation. Data was collected from three Working for Water job categories namely, the Contractors, HIV and AIDS Peer Educators and Workers by means of questionnaires. The responses were analysed by using the Moonstats statistical software where findings revealed gaps in the planning, monitoring and evaluation processes of Social Development interventions. Furthermore, the study recommended that there be improvements in the implementation processes of Social Development interventions particularly in planning, monitoring and evaluation. / AFRIKAANSE OPSOMMING: Die doelstelling van hierdie studie was om die proses van die Werk vir Water se Sosiale OntwikkelingIntervensie te evalueer soos gestipuleer in die Middel termyn Strategiese plan vir 2003-2007. Hierdie studie het op twee projekte gefokus naamlik, die Groter Letaba en Mamathola projekte in die Tzaneen Bestuursarea in Limpopo. Die fokus van die studie was of die werwing en seleksieprosesse wat binne die Werk vir Water Program gevolg word, wel gelyke werksgeleenthede en kwotas bevorder soos uiteengesit in die riglyne vir Uitgebreide Openbare Werke Program en die Ministeriele Determinasie vir Spesiale Openbare WerkeProgam Die studie het ook die proses geevalueer wat gevolg was in die implementering van MIV en VIGS programme as ‘n Sosiale Ontwikkeling intervensie. Laastens, het die studie die prosesse ge evalueer wat gevolg was tydens die implementering van die Opleidingsen Vaardigheids Ontwikkelings program binne die raamwerk van die Werk vir Water Program. Die teoretiese agtergrond het gefokus op die Sosiale ontwikkelingsteorieë sowel as die evalueringsteoriee. Verder het die studie gebruik gemaak van die Werk vir Water Norms en Standaarde, MIV en VIGS beleid en Vaardigheidsontwikkeling en Opleidingsriglyne as basis vir die evaluasieproses. Data was dmv vraelyste ingewin vanuit drie Werk vir Water poskategorieë naamlik, die Kontrakteurs, MIV en VIGS Eweknie Opvoeders en Werkers. Die inligting was geanaliseer deur gebruik te maak van Moonstats Statistical Software. Die bevindings het leemtes uitgewys in die beplanning, monitering en evalueringsprosesse van die Sosiale Ontwikkelingsintervensies. Verder het die studie aanbeveel dat daar verbeteringe gemaak moet word in die implementeringsprosesse van Sosiale Ontwikkelingsintervensies. Klem moet veral gelế word op die gebiede van beplanning, monitering en evaluering.
5

On the implementation effectiveness and efficiency of ecological interventions in operational contexts : the case of Working for Water

McConnachie, Matthew Morgan January 2013 (has links)
There is little understanding of the implementation efficiency and effectiveness of restoring plant invaded landscapes within operational contexts. South Africa's Working for Water (WfW) programme is arguably the most ambitious alien plant control programme in the world, yet little is known about its cost-effectiveness and the challenges it faces in linking poverty and environmental objectives. My first aim was to assess the cost-effectiveness of invasive plant removal, and the factors that underpin its effectiveness over large spatial and temporal scales. The second aim was to compare the accuracy of evidence-based findings with managers' experience-based beliefs, and to assess whether managers are willing to change their beliefs after being exposed to it. The third aim was to assess the costs and benefits of removal versus removal followed by active native re-vegetation. My final aim is to assess the challenges and lessons learnt by managers linking ecological restoration with poverty alleviation objectives, specifically within the public works model. My study area was focused primarily on two WfW river catchment projects in the western region of the Eastern Cape province. I adopted an interdisciplinary approach drawing from a range of methods such as observational studies, statistical modelling and interviews with managers. The key findings were that control efforts in the two catchment projects are largely inadequate owing to many sites being re-invaded and not enough resources being allocated to the catchments. It would take between 54 and 695 years to clear the respective catchments. In terms of cost-effectiveness, my results exceeded previous estimates by 1.5 to 8.6 times for each catchment project. After being exposed to the evidence-based findings, the managers did not change their beliefs when it came to forecasting the future effectiveness. I found that active native re-vegetation after removal of invasive plants is very costly and that priority should be given to understanding the effectiveness of the removal treatments on native species recovery. The managers cited significant challenges in effectively and efficiently meeting the programmes dual objectives. Based on a broader review of the public works literature I recommend WfW re-examine the type of public works they currently use.

Page generated in 0.1385 seconds