• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 10
  • Tagged with
  • 10
  • 10
  • 8
  • 8
  • 7
  • 7
  • 6
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Planejamento dinâmico de expansão em sistemas de transmissão de energia elétrica via algoritmos híbridos de otimização / Dynamic and static transmission network expansion planning in power systems via hybrid optmization algorthms

Oliveira, Luiz Eduardo de 08 December 2017 (has links)
Dissertação (mestrado)—Universidade de Brasília, Faculdade de Tecnologia, Departamento de Engenharia Elétrica, 2017. / Submitted by Raquel Almeida (raquel.df13@gmail.com) on 2018-04-13T19:30:04Z No. of bitstreams: 1 2017_LuizEduardodeOliveira.pdf: 3843329 bytes, checksum: 31eedade77bff0ca7a230711494b9dca (MD5) / Approved for entry into archive by Raquel Viana (raquelviana@bce.unb.br) on 2018-04-18T21:24:31Z (GMT) No. of bitstreams: 1 2017_LuizEduardodeOliveira.pdf: 3843329 bytes, checksum: 31eedade77bff0ca7a230711494b9dca (MD5) / Made available in DSpace on 2018-04-18T21:24:31Z (GMT). No. of bitstreams: 1 2017_LuizEduardodeOliveira.pdf: 3843329 bytes, checksum: 31eedade77bff0ca7a230711494b9dca (MD5) Previous issue date: 2018-04-18 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES). / O Planejamento de Expansão em Sistemas de Transmissão (PEST) tem o propósito de identificar novos equipamentos transmissores a serem inseridos na rede, a fim de suprir à demanda futura prevista dentro do horizonte de planejamento. Este trabalho contribui nessa direção ao apresentar um novo método baseado em diversas técnicas de otimização para resolver o Planejamento de Expansão Estático (PEEST) e Dinâmico (PDEST). A visão estática de "quais" reforços e "onde" estes devem ser instalados é uma abordagem simplista, pois analisa somente dois estágios de planejamento: presente e futuro. Já a visão dinâmica, ao particionar o horizonte de planejamento em multiestágios, fornece ao planejador informações importantes também sobre "quando" esses reforços devem ser alocados na rede, resultando em uma resposta mais robusta e efetiva. O processo resultante dessa formulação é uma programação não linear inteira mista, onde as dificuldades se intensificam no PDEST com o acoplamento temporal. Sendo assim, foi criada uma metodologia que divide o problema de minimização inicial em mestre (não linear) e escravo (linear). O Método dos Pontos Interiores (MPI) é aplicado na resolução do problema escravo, que por sua vez, requer a otimização da modelagem de fluxos de cargas linearizados, sem perdas, utilizados na representação das redes de transmissão. A solução do problema escravo fornece informações ao método proposto, um algoritmo heurístico híbrido que acopla o Harmony Search e o Branch & Bound em série (HSB&B), para conferência da factibilidade dos PESTs sugeridos durante o processo de resolução do problema mestre. Posto isto, foi desenvolvida e aprimorada uma metodologia que visa alcançar a solução ótima do problema mestre-escravo em três etapas com diferentes objetivos: redução eficiente do conjunto inicial das rotas candidatas à expansão por meio de um Algoritmo Heurístico Construtivo (AHC); resolução do PEEST através da metaheurística Harmony Search (HS) e criação da Região de Soluções Estáticas (RSE); expansão dinâmica através da adaptação do algoritmo Branch & Bound no refinamento de todos os PEEST contidos na RSE. Testes com os sistemas Garver, Two Valleys e Sul do Brasil foram feitos e comparados à literatura para comprovar a eficácia do método. / Transmission Network Expansion Planning (TNEP) has the purpose of identifying new transmission equipments to be inserted on the grid in order to supply a forecasted demand. This work contributes in this direction presenting a new method based on several optimization techniques to solve Static (STNEP) and Dynamic (DTNEP) Expansion Planning. The static view of "which" reinforcements and "where" they should be installed is a simplistic approach, since it analyzes only two stages in the planning horizon: the present and the future. On the other hand, the dynamic view, by dividing the planning horizon into multistage, also gives the planner important information about “when” these reinforcements should be allocated on the network, resulting in a more robust and effective response. This formulation results in a nonlinear programming problem with integer and continuous variables, whose difficulties are intensified by the temporal coupling. Therefore, a methodology that divides the initial minimization problem into master (non-linear) and slave (linear) problem was proposed. The Interior-Point Method (IPM) is applied in solving the slave problem, which in turn requires the optimization of the lossless linearized load flow modeling used to represents the transmission network. The solution of the slave problem provides information to the proposed method, a hybrid heuristic algorithm that couples Harmony Search and Branch & Bound in series (HSB&B), to check the feasibility of the suggested PESTs during the solving process of the master problem. Therefore, a hybrid methodology was developed and improved to solve the master problem in three different stages: efficient reduction of the initial set of candidate routes for expansion by a Constructive Heuristic Algorithm (AHC); resolution of PEEST via metaheuristic algorithm Harmony Search and creation of the Static Solutions Region (SSR); dynamic expansion through an adaptation of Branch & Bound algorithm of all PEEST from SSR. Tests with Garver, Two Valleys and Brazilian South System were performed and compared to the literature to prove the method effectiveness.
2

Algoritmo heurístico especializado aplicado ao planejamento da expansão de sistemas de distribuição de energia elétrica / Heuristic algorithm specialized applied to planning the expansion of eletricity distribution systems

Brandt, Marcelo Henrique Manzke 27 June 2016 (has links)
Made available in DSpace on 2017-07-10T16:41:34Z (GMT). No. of bitstreams: 1 Dissert Marcelo Brandt.pdf: 2755186 bytes, checksum: 04398250477fd1d25f8397f78a8137de (MD5) Previous issue date: 2016-06-27 / In this Master`s Dissertation is presented the development of a specialized heuristic algorithm for planning the expansion of distribution systems. This new heuristic algorithm has the constructive character, because in each iteration goes to search for a new solution to the problem. The algorithm used in this work does not use an objective function with the system bus data and system line data to find a new solution. Another advantage of this algorithm is the technique used to find the final topology, the specialized heuristic algorithm uses destructive technique for finding the final topology, on which, for each iteration, one line that is present in the current system configuration, is removed. To select the line to be removed, the algorithm used a subroutine of a power flow calculation by the Newton Raphson method, and the results obtained are used to compose the sensitivity indicators. Which the established indicators, the algorithm checks violation load service, and if there is no violation, the line is removed from the system and proceeds to the next iteration . This process is performed to find a final topology for the problem with the commitment to find a good solution. The algorithm was used to solve the problem considering testing system known in the specialized literature and the results which were obtained show that the algorithm is robust and fast to determine the final topology for the system. / Neste presente trabalho é apresentado o desenvolvimento de um algoritmo heurístico especializado para o planejamento da expansão de sistemas de distribuição. Este novo algoritmo heurístico possui a característica construtiva, pois a cada iteração vai à busca de uma nova solução para o problema. O algoritmo que é apresentado neste trabalho não utiliza uma função objetivo com as suas restrições para resolver o problema de otimização e sim utiliza parâmetros estabelecidos com os dados de barra e de linha do sistema para encontrar a nova solução. Outro diferencial desse algoritmo é a técnica utilizada para encontrar a topologia final, o algoritmo heurístico especializado utiliza uma técnica destrutiva, ou seja, pressupõe-se que as linhas candidatas à adição no sistema estejam construídas e em cada iteração é proposta a retirada de uma destas linhas do sistema. Para a escolha da linha a ser retirada, o algoritmo utiliza uma sub-rotina de cálculo de fluxo de potência, pelo método Newton Raphson, e os resultados obtidos são utilizados para compor os indicadores de sensibilidade. Com os indicadores estabelecidos é feita a verificação de violação de atendimento de demanda, caso não haja nenhuma violação a linha é retirada do sistema e procede-se para a próxima iteração. Esse processo é executado até se encontrar uma topologia final radial para o problema com o compromisso de encontrar uma solução de boa qualidade. Foram realizados testes computacionais considerando sistemas testes conhecidos através da literatura especializada e os resultados mostram que o algoritmo é robusto e rápido para a determinação da topologia final da rede.
3

Tomada de decisão Fuzzy e busca Tabu aplicadas ao planejamento da expansão de sistemas de transmissão / Fuzzy decision making and Tabu search applied to planning the expansion of transmission systems

Sousa, Aldir Silva 27 February 2009 (has links)
Neste trabalho é proposta uma nova técnica de solução para resolver o problema de planejamento da expansão de sistemas de transmissão estático através da introdução da tomada de decisão fuzzy. Na técnica apresentada neste trabalho, a tomada de decisão fuzzy é aplicada para o desenvolvimento de um algoritmo heurístico construtivo. O sistema fuzzy é utilizado para contornar alguns problemas críticos das heurísticas que utilizam o índice de sensibilidade como guia para inserção de novas linhas. A heurística apresentada nesse trabalho é baseada na técnica dividir para conquistar. Verificou-se que a deficiência das heurísticas construtivas é decorrente da decisão de inserir novas linhas baseada em valores não seguros encontrados através da solução do modelo utilizado. Para contornar tal deficiência, sempre que surgirem valores não seguros divide-se o problema original em dois subproblemas, um que analisa a qualidade da resposta para o caso em que a linha é inserida e outro para verificar a qualidade da resposta para o caso em que a linha não é inserida. A tomada de decisão fuzzy é utilizada para decidir sobre quando dividir o problema em dois novos subproblemas. Utilizou-se o modelo cc com a estratégia de Villasana-Garver-Salon para realizar a modelagem da rede elétrica para os problemas da expansão de sistemas de transmissão aqui propostos. Ao serem realizados testes em sistemas de pequeno, médio e grande portes certificou-se que o método pode encontrar a solução ótima de sistemas de pequeno e médio portes. Porém, a solução ótima dos sistemas de grande porte testados não foi encontrada. Para melhorar a qualidade da solução encontrada utilizou, em uma segunda fase, a metaheurística busca tabu. A busca tabu utiliza o modelo cc. Os resultados se mostraram bastante promissores. Os testes foram realizados em alguns sistemas reais brasileiros e com o sistema real colombiano. / A new solution technique to solve the long-term static transmission expansion planning (TEP) problem based on fuzzy decision making is proposed. The technique applies the concepts of fuzzy decision making in a constructive heuristic algorithm. The fuzzy system is used to circumvent some critical problems of heuristics that use sentivity indices as a guide for insertion and construction of new lines. The heuristic algorithm proposed in this work is based on the divide and conquer technique. It has been verified that the deficiency of the constructive heuristics is due to the decision of inserting new lines based only on information given by the index, which usually is calculated from a relaxed mathematical representation of the problem and can become less accurate during the solution process. In order to be able to deal with such problem, whenever the quality of the index decreases, the original problem is divided into two sub-problems: one examines the quality of the solution when the transmission line indicated by the sensitivity index is inserted and the other subproblem checks the opposite. Fuzzy decision-making is used to decide the moment to divide the problem into two subproblems based on other information. The hybrid linear model is used to model the long-term transmission expansion planning problem and is used in the proposed algorithm. Tests was done with systems of small-term, medium-term and long-term. The optimal solution of small-term and medium-term was foundo using just the construtive heuristic algorithm with fuzzy decision-making. To deal with long-term systems was used the solutions of the construtive heuristic algorithm with fuzzy decision-making to init a tabu search. The tabu search uses the dc model. The results are very promising. The test was done with some real brazilian systems and with the real colombian system.
4

Tomada de decisão Fuzzy e busca Tabu aplicadas ao planejamento da expansão de sistemas de transmissão / Fuzzy decision making and Tabu search applied to planning the expansion of transmission systems

Aldir Silva Sousa 27 February 2009 (has links)
Neste trabalho é proposta uma nova técnica de solução para resolver o problema de planejamento da expansão de sistemas de transmissão estático através da introdução da tomada de decisão fuzzy. Na técnica apresentada neste trabalho, a tomada de decisão fuzzy é aplicada para o desenvolvimento de um algoritmo heurístico construtivo. O sistema fuzzy é utilizado para contornar alguns problemas críticos das heurísticas que utilizam o índice de sensibilidade como guia para inserção de novas linhas. A heurística apresentada nesse trabalho é baseada na técnica dividir para conquistar. Verificou-se que a deficiência das heurísticas construtivas é decorrente da decisão de inserir novas linhas baseada em valores não seguros encontrados através da solução do modelo utilizado. Para contornar tal deficiência, sempre que surgirem valores não seguros divide-se o problema original em dois subproblemas, um que analisa a qualidade da resposta para o caso em que a linha é inserida e outro para verificar a qualidade da resposta para o caso em que a linha não é inserida. A tomada de decisão fuzzy é utilizada para decidir sobre quando dividir o problema em dois novos subproblemas. Utilizou-se o modelo cc com a estratégia de Villasana-Garver-Salon para realizar a modelagem da rede elétrica para os problemas da expansão de sistemas de transmissão aqui propostos. Ao serem realizados testes em sistemas de pequeno, médio e grande portes certificou-se que o método pode encontrar a solução ótima de sistemas de pequeno e médio portes. Porém, a solução ótima dos sistemas de grande porte testados não foi encontrada. Para melhorar a qualidade da solução encontrada utilizou, em uma segunda fase, a metaheurística busca tabu. A busca tabu utiliza o modelo cc. Os resultados se mostraram bastante promissores. Os testes foram realizados em alguns sistemas reais brasileiros e com o sistema real colombiano. / A new solution technique to solve the long-term static transmission expansion planning (TEP) problem based on fuzzy decision making is proposed. The technique applies the concepts of fuzzy decision making in a constructive heuristic algorithm. The fuzzy system is used to circumvent some critical problems of heuristics that use sentivity indices as a guide for insertion and construction of new lines. The heuristic algorithm proposed in this work is based on the divide and conquer technique. It has been verified that the deficiency of the constructive heuristics is due to the decision of inserting new lines based only on information given by the index, which usually is calculated from a relaxed mathematical representation of the problem and can become less accurate during the solution process. In order to be able to deal with such problem, whenever the quality of the index decreases, the original problem is divided into two sub-problems: one examines the quality of the solution when the transmission line indicated by the sensitivity index is inserted and the other subproblem checks the opposite. Fuzzy decision-making is used to decide the moment to divide the problem into two subproblems based on other information. The hybrid linear model is used to model the long-term transmission expansion planning problem and is used in the proposed algorithm. Tests was done with systems of small-term, medium-term and long-term. The optimal solution of small-term and medium-term was foundo using just the construtive heuristic algorithm with fuzzy decision-making. To deal with long-term systems was used the solutions of the construtive heuristic algorithm with fuzzy decision-making to init a tabu search. The tabu search uses the dc model. The results are very promising. The test was done with some real brazilian systems and with the real colombian system.
5

Planejamento dinâmico da expansão de sistemas de transmissão de energia elétrica

Poubel, Raphael Paulo Braga 27 February 2012 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-12-19T12:53:20Z No. of bitstreams: 1 raphaelpaulobragapoubel.pdf: 1692665 bytes, checksum: e8fb69a9681a9af78d618fd006ce0ebd (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2016-12-19T13:07:51Z (GMT) No. of bitstreams: 1 raphaelpaulobragapoubel.pdf: 1692665 bytes, checksum: e8fb69a9681a9af78d618fd006ce0ebd (MD5) / Made available in DSpace on 2016-12-19T13:07:51Z (GMT). No. of bitstreams: 1 raphaelpaulobragapoubel.pdf: 1692665 bytes, checksum: e8fb69a9681a9af78d618fd006ce0ebd (MD5) Previous issue date: 2012-02-27 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / Este trabalho apresenta um modelo baseado em métodos heurísticos construtivos para solução do planejamento dinâmico de linhas de transmissão. O acoplamento temporal entre as decisões é representado através de uma modificação nas equações do modelo de fluxo de carga CC onde as perdas nas linhas são incluídas. O problema resultante desta formulação é um problema de otimização inteira com variáveis acopladas no período de planejamento representadas por um parâmetro de expansão. O algoritmo proposto resolve o problema de forma contínua e acoplada para decidir sobre o planejamento de cada ano de forma a evitar a explosão combinatória da programação inteira. Para tanto são utilizadas, para as decisões de expansão, as informações dos coeficientes de Lagrange e do parâmetro de expansão. Testes com o sistema da região Sul e Sudeste do Brasil apontam para uma metodologia eficaz e promissora. / This work presents a model to solve the dynamic planning of transmission lines based on heuristics technique. The temporal coupling among decisions is represented by a modification on the equations of the DC load flow model, in which losses in transmission lines are included. This formulation generates an integer optimization problem with coupled variables in the planning period, represented by an expansion parameter. The proposed algorithm solves the problem in a continuous and coupled way, in order to decide the planning of each year, as well as to avoid combinatorial explosion of the integer technique. Information obtained from the Lagrange multiplier and the expansion parameter are used to take decisions. Tests with Brazilian southern and southeastern systems indicate an effective and promising methodology.
6

Expansão estática de sistemas de transmissão de energia elétrica via FPA

Neves, Patrícia Silva 31 August 2017 (has links)
Submitted by Geandra Rodrigues (geandrar@gmail.com) on 2017-12-22T14:54:33Z No. of bitstreams: 1 patriciasilvaneves.pdf: 1941458 bytes, checksum: 16ab3b743d0b75134d320f08de292905 (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2018-01-22T18:33:39Z (GMT) No. of bitstreams: 1 patriciasilvaneves.pdf: 1941458 bytes, checksum: 16ab3b743d0b75134d320f08de292905 (MD5) / Made available in DSpace on 2018-01-22T18:33:39Z (GMT). No. of bitstreams: 1 patriciasilvaneves.pdf: 1941458 bytes, checksum: 16ab3b743d0b75134d320f08de292905 (MD5) Previous issue date: 2017-08-31 / O presente trabalho apresenta a aplicação conjunta de uma técnica de otimização bioinspirada e de um Algoritmo Heurístico Construtivo (AHC) na resolução do problema de planejamento estático da expansão de sistemas de transmissão de energia elétrica. O algoritmo bioinspirado utilizado é uma versão modificada do Flower Pollination Algorithm (FPA), no qual foi introduzido o operador de seleção clonal, oriundo do Algoritmo de Seleção Clonal (CLONALG), com o objetivo de potencializar o processo de busca local do FPA. A versão modificada proposta neste trabalho foi nomeada de Clonal Flower Pollination Algorithm (CFPA). O CFPA realiza a otimização da expansão de sistemas de transmissão de energia elétrica, determinando, entre um conjunto de linhas (circuitos) de transmissão previamente definidas, quais devem ser construídas de modo a minimizar os custos de investimento e de operação do sistema elétrico, suprindo a demanda prevista para um dado horizonte de planejamento. De modo a aumentar a eficiência do processo de busca pelo CFPA, fez-se o uso de informações provenientes de um Algoritmo Heurístico Construtivo. Tais informações heurísticas são utilizadas na inicialização do CFPA e também na seleção de um conjunto reduzido das rotas mais relevantes à expansão, reduzindo o espaço de busca. Para aferir os resultados da metodologia proposta foram simulados os sistemas Garver, IEEE 24 Barras e o equivalente da região Sul do Brasil. Diante dos resultados, pode-se verificar que tanto a inclusão do operador de seleção clonal quanto as informações heurísticas foram capazes de aumentar a eficiência do FPA na resolução do problema aqui em estudo. / This work presents the application of a bio-inspired algorithm, together with a Heuristic Constructive Algorithm (HCA) in the solution of a power system static transmission expansion planning problem. The algorithm used is a modified version of the Flower Pollination Algorithm (FPA) that includes a clonal selection operator, from the clonal selection algorithm (CLONALG) that aims to improve the FPA local search process. The modified version proposed is entitled Clonal Flower Pollination Algorithm (CFPA). The CFPA realizes the power system transmission expansion planning, that is, it determines between a set of predefined transmission lines (circuits), which of them must be constructed in order to minimize the power systems investments and operation costs, while meeting the forecast demand in a given planning horizon. In order to increase the efficiency of the search process by the CFPA, information from an HCA has been utilized. That heuristic information has been used in the initialization process of the CFPA and also in the selection of a reduced set of most relevant lines candidates to the expansion plan, thus reducing the search space. To evaluate the results of the proposed methodology, the Garver, IEEE 24 Buses and South Brazilian Systems were simulated. Considering the results it can be verified that both the inclusion of the clonal selection algorithm and the heuristic information were able to increase the efficiency of the FPA in solving this problem.
7

Algoritmo híbrido aplicado ao planejamento da expansão de redes aéreas de média tensão / Hybrid algorithm applied to the plannning of the expansion of mediun voltage aerial networks

Cuno, Miguel Angel Sánchez 16 August 2016 (has links)
Submitted by Miriam Lucas (miriam.lucas@unioeste.br) on 2018-02-22T16:42:27Z No. of bitstreams: 2 Miguel_Angel_Sanchez_Cuno_2016.pdf: 1159111 bytes, checksum: 5e8f5e6fcd310a19270e2164cb09c3e3 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) / Made available in DSpace on 2018-02-22T16:42:27Z (GMT). No. of bitstreams: 2 Miguel_Angel_Sanchez_Cuno_2016.pdf: 1159111 bytes, checksum: 5e8f5e6fcd310a19270e2164cb09c3e3 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Previous issue date: 2016-08-16 / Fundação Parque Tecnológico de Itaipu / This work presents the development of a Hybrid Algorithm to solve the problem of Planning the Expansion of Medium Voltage Overhead Networks. The Hybrid Algorithm uses two strategies to solve the problem. First uses a Constructive Heuristic Algorithm that tries to work with parameters instead of working with variables, with the objective of reducing the convergence time to the research process trying not to impair the quality of the solution. The second strategy is based in a Branch and Bound Algorithm, that uses the solution of the problem obtained as a starting point while the first strategy is running. Thus, this solution is used like incumbent in the second process. In this context the hybrid algorithm developed and implemented in this work, takes advantage of reducing the convergence time of the Constructive Heuristic Algorithm and the advantage of guarantee that the solution has the best quality, which are the solutions produced by algorithms type Branch and Bound. The Algorithm has been tested in three test systems, being established a plan to expand overhead medium voltage networks for each system. / Neste trabalho é apresentado um Algoritmo Híbrido para resolver o problema de Planejamento da Expansão de Redes Aéreas de Média Tensão. O Algoritmo Híbrido utiliza duas estratégias para resolver o problema. A primeira utiliza um Algoritmo Heurístico Construtivo que procura trabalhar com parâmetros ao invés de trabalhar com variáveis, com o objetivo de reduzir o tempo de convergência do processo de busca procurando não prejudicar a qualidade da solução. A segunda estratégia é baseada em um Algoritmo do tipo Branch and Bound, que utiliza a solução do problema obtida durante a execução da primeira estratégia como um ponto de partida. Assim, esta solução é usada como incumbente neste segundo processo. Neste contexto, o Algoritmo Híbrido desenvolvido e implementado neste trabalho, aproveita a vantagem de reduzir o tempo de convergência do Algoritmo Heurístico Construtivo e a vantagem de garantir que a solução seja a de melhor qualidade, que são as soluções produzidas por algoritmos do tipo Branch and Bound. O Algoritmo foi testado em três sistemas testes, sendo estabelecido um plano para a expansão de redes aéreas de média tensão para cada sistema
8

Reconfiguração e alocação ótima de geração distribuída em sistemas de energia elétrica / Optimal reconfiguration and distributed generation allocation in electric power systems

Rosseti, Gustavo José Santiago 15 September 2011 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-09-12T12:17:41Z No. of bitstreams: 1 gustavojosesantiagorosseti.pdf: 1406328 bytes, checksum: e250ced1df20ff9c96f2e06c95c77543 (MD5) / Approved for entry into archive by Diamantino Mayra (mayra.diamantino@ufjf.edu.br) on 2016-09-13T13:22:34Z (GMT) No. of bitstreams: 1 gustavojosesantiagorosseti.pdf: 1406328 bytes, checksum: e250ced1df20ff9c96f2e06c95c77543 (MD5) / Made available in DSpace on 2016-09-13T13:22:34Z (GMT). No. of bitstreams: 1 gustavojosesantiagorosseti.pdf: 1406328 bytes, checksum: e250ced1df20ff9c96f2e06c95c77543 (MD5) Previous issue date: 2011-09-15 / CNPq - Conselho Nacional de Desenvolvimento Científico e Tecnológico / Este trabalho apresenta uma metodologia para reconfiguração e alocação ótima de geração distribuída em redes elétricas de distribuição com o objetivo de minimizar as perdas técnicas de energia elétrica. A metodologia proposta é composta de dois algoritmos heurísticos passo a passo baseados em índices de sensibilidade, sendo um para a reconfiguração e o outro para a alocação de geração distribuída. O índice proposto para reconfiguração é baseado nos parâmetros operativos e o índice para alocação de geração distribuída baseia-se em uma estimativa dos multiplicadores de Lagrange, obtida a partir da solução do problema de fluxo de potência. O modelo proposto considera a variação da demanda do sistema através das curvas de carga e a opção de construir um novo circuito para conexão de um gerador distribuído a uma barra do sistema. Os algoritmos propostos são aplicados em sistemas da literatura, incluindo um sistema real de médio porte. / This work presents a methodology for optimal reconfiguration and optimal distributed generation allocation aiming to minimize technical energy losses in electric power distribution systems. The proposed methodology includes two step by step heuristic algorithms, based on sensitivity indexes, one for the reconfiguration and the other for the distributed generation allocation. The index proposed for reconfiguration is based on operating parameters and the index for distributed generation allocation uses the Lagrange multipliers obtained from the power flow solution. The proposed model considers the demand variation from the system load curves and the options to build a new branch for connecting a distributed generator to a bus of the network. The proposed algorithms are applied in systems of the literature, including a medium scale practical system.
9

Planejamento dinâmico da expansão de sistemas de transmissão de energia elétrica

Poubel, Raphael Paulo Braga 04 July 2016 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2017-01-06T17:13:56Z No. of bitstreams: 1 raphaelpaulobragapoubel.pdf: 14885655 bytes, checksum: 55ce1d3cf1619213e5c2364f54de5a50 (MD5) / Approved for entry into archive by Diamantino Mayra (mayra.diamantino@ufjf.edu.br) on 2017-01-31T11:24:55Z (GMT) No. of bitstreams: 1 raphaelpaulobragapoubel.pdf: 14885655 bytes, checksum: 55ce1d3cf1619213e5c2364f54de5a50 (MD5) / Made available in DSpace on 2017-01-31T11:24:55Z (GMT). No. of bitstreams: 1 raphaelpaulobragapoubel.pdf: 14885655 bytes, checksum: 55ce1d3cf1619213e5c2364f54de5a50 (MD5) Previous issue date: 2016-07-04 / O presente trabalho propõe um modelo não linear inteiro misto para o planejamento dinâmico da expansão da transmissão. Para a representação do modelo, se fez uso do fluxo de carga CC. As equações básicas do fluxo CC foram modificadas e expandidas de forma a incluir as variáveis de decisão e o acoplamento temporal entre os investimentos. Para a solução do modelo, de forma a mitigar as dificuldades inerentes à programação inteira, foram propostas técnicas de solução passo a passo. Em cada uma das técnicas as variáveis inteiras foram substituídas por uma função contínua de forma a se obter tempos computacionaisviáveis. Adiscretizaçãodasvariáveisinteirassedácomoauxíliodeíndices de sensibilidade apropriados, calculados a partir do modelo acoplado. O trabalho também investiga metodologias para o planejamento dinâmico de linhas de transmissão, buscando um equilíbrio entre a economia e a confiabilidade no processo de decisão dos investimentos. O critério determinístico N-1 foi escolhido para garantir maior confiabilidade ao sistema. / This work proposes a non-linear mixed integer model for dynamic transmission lines expansion planning. The DC load flow was used to represent the model. The basic equationsoftheDCloadflowweremodifiedandexpandedtoincludethedecisionvariables and the temporal coupling between investments. For the model solution, in order to mitigate the difficulties inherent of integer programming, step-by-step processes were proposed. In each of the techniques the integer variables have been replaced with a continuous function to obtain viable computational time. The discretization of the integer variables is made with the aid of appropriate sensitivity indexes, calculated from the coupled model. The work also suggests methods for dynamic transmission planning, seeking a balance between the economy and reliability in the investment decision process. The N-1 deterministic criteria was chosen to ensure system reliability.
10

Técnicas para restabelecimento de sistemas de distribuição de energia elétrica / Algorithm for service restoration in distribuiton systems

Rosseti, Gustavo José Santiago 31 August 2015 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-01-19T10:31:58Z No. of bitstreams: 1 gustavojosesantiagorosseti.pdf: 1281297 bytes, checksum: 0d547bba728df4c23bbf1317541f6e39 (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2016-01-25T17:44:12Z (GMT) No. of bitstreams: 1 gustavojosesantiagorosseti.pdf: 1281297 bytes, checksum: 0d547bba728df4c23bbf1317541f6e39 (MD5) / Made available in DSpace on 2016-01-25T17:44:12Z (GMT). No. of bitstreams: 1 gustavojosesantiagorosseti.pdf: 1281297 bytes, checksum: 0d547bba728df4c23bbf1317541f6e39 (MD5) Previous issue date: 2015-08-31 / Esta tese apresenta uma metodologia para maximizar o restabelecimento de cargas em sistema de distribuição de energia elétrica após à ocorrência de uma ou simultâneas contingências. Para tanto, um algoritmo heurístico construtivo é proposto, determinando passo a passo os procedimentos operativos a serem adotados. Aspectos associados com as restrições de radialidade e de tensão nas barras, minimização de manobras de chaves, consumidores prioritários e mínimo corte discreto de carga são considerados a fim de uma representação mais realista do problema. A metodologia é aplicada em sistemas tradicionais da literatura, incluindo um sistema real de médio porte. / This thesis presents a methodology for maximizing the load restoration in power distribution system after simultaneous occurrence of contingency. Therefore, a heuristic constructive algorithm is proposed to determine step by step the operation procedures to be adopted. Aspects associated with the radiality and bus voltage constraints, minimization of maneuvering switches, priority consumers and minimum discrete load shedding are considered to provide a more realistic representation of the problem. The proposed approach is applied in traditional systems from literature including a real medium size test system.

Page generated in 0.0737 seconds