• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Införande av BK4 : Bärighetsberäkning av balkbro med lång spännvidd / Introducing BK4 : Capacity calculation of a beam bridge with long spans

Solevind, Alexander, Solevind, Linn January 2017 (has links)
Regeringen har på förslag att införa en ny bärighetsklass för det svenska vägnätet. Den föreslagna bärighetsklassen får beteckningen BK4 och innebär att maximal bruttovikt för lastbilar ökas från nuvarande 64 ton till 74 ton. Målet för arbetet var att utröna påverkan på beräkningar och resultat för broar av denna ökning, med hänsyn till befintliga broars bärförmåga – specifikt med avseende på broar vars spann är långa nog att rymma minst ett helt lastbilsekipage. I samband med höjningen av maximal bruttovikt kommer fordonsutseendet för lastbilar att förändras. En bärighetsberäkning utfördes för balkbron 15-910-2, som har spann på 25-28 m. Beräkningen utfördes i enlighet med svenskt regelverk för bärighetsberäkning, TDOK 2013:0267, och med hjälp av FE-analys i programmet Brigade/Standard. I arbetet har specifik FEM-teori använts för att bestämma var kritiska snitt uppstår i FE-modellen och i vissa fall har justering av utdata gjorts med hjälp av lastfördelningsbredder. Rapporten är tänkt att kunna användas som en mall för hur en bärighetsberäkning kan utföras. Mallen för bärighetsberäkningen kan användas som stöd för beräkningar för andra broar där framförallt tankesätt och beräkningsgång kommer att vara liknande. På grund av förändringen av fordonsutseende i samband med bruttoviktshöjningen har en FEanalys utförts för att kontrollera skillnader på lastpåverkan mellan dagens fordonsutseende för BK1 och exempel på framtida utseende för BK4. Jämförelsen visar att påverkan kan variera något mellan olika fordonskonfigurationer men konsekvent ökar avsevärt då bruttovikten höjs. Resultatet av bärighetsberäkningen gav en klassning A/B = 176/284 kN för bro 15-910-2, vilket ligger över kravet för införandet utav BK4 med gränsvärden på A/B = 120/210 kN. Skillnaden i resultat för BK1 och BK4 visar på att beräkningar och resultat för en lång balkbro i brottsgränstillstånd inte påverkas avsevärt av höjningen av maxvikten för lastbilar. Innebörden av detta bör då vara att en bro som är klassad för BK1 enligt TDOK 2013:0267 med en klassning som är högre än kravet för BK4 kan uppgraderas utan ytterligare kontroll. Dock bör ytterligare studier utföras för fler broar av samma typ för att kunna styrka detta samband. I samband med att bärighetsberäkningen utförs tas ett så kallat k-värde fram, som sedan används för att proportionera upp, eller ned, A/B-värdena från de gränsvärden som gäller för given bärighetsklass. Då bärighetsberäkning utfördes för BK1 och BK4 gav resulterande bärförmåga för bron endast en två-procentig skillnad, men k-värdet blir betydligt mindre för BK4 jämfört med BK1. Ett lägre k-värde innebär en högre utnyttjandegrad och därmed snabbare utmattning och högre slitage på bron. Effekten av dessa skillnader bör undersökas i ett senare arbete. / The Swedish government has proposed a new load carrying capacity class for the Swedish road network. The proposed capacity class is labeled BK4 and will increase the maximum weight for road vehicles from the current 64 t to 74 t. The goal for this thesis was to investigate the impact of this increase on the capacity calculations and results for bridges, regarding existing bridges’ load carrying capacity – specifically with respect to beam bridges with spans long enough to contain an entire truck. Coincidental to the increase of maximum weight the vehicle configuration of trucks will change. A capacity calculation was performed on the beam bridge 15-910-2, with span lengths of 25-28 m. The calculation was performed according to Swedish regulations for capacity calculation and with an FE-analysis in the software Brigade/Standard. In this thesis, specific FEM theory has been used to determine where critical sections occur in the FE-model and in some cases output adjustments have been made using load distribution widths. This report is meant to be able to be used as a template for how a capacity calculation can be performed. The capacity calculation template can be used as calculation support and process description for the calculation of other bridges. Due to the change in vehicle appearance in the context of the gross weight increase, a FE-analysis has been conducted to measure the differences in impact on the structure between today’s vehicle appearance for BK1 and the examples of future appearance for BK4. The comparison shows that the impact can vary slightly between different vehicle configurations but the impact consistently increases significantly with the increase in gross weight. The result of the capacity calculation gave a classification rating of A/B = 176/284 kN for bridge 15-910-2, which is above the requirement for the introduction of BK4 which has a required rating of A/B = 120/210 kN. The marginal result difference between BK1 and BK4 shows a plausibility that the calculations and results for long beam bridges in the ultimate limit state are unaffected by the increase of maximum weight for road vehicles. Thus the implication of this should be that a bridge with a BK1 load carrying capacity classification score that is higher than the demanded score according to BK4 can be upgraded without further control, if the prior capacity classification calculation was done according to TDOK 2013:0267. However further studies should be carried out for other beam bridges in order to increase this plausibility. When performing the load calculation, a so-called k-value is generated, which is then used to proportionate the A/B limit values for the given capacity class to reach a final classification rating. When capacity calculation was performed using input values for BK1 and BK4 respectively, the resulting load carrying capacity showed a two percent difference between BK1 and BK4, but the kvalue for the BK4 class was significantly lower than for BK1. A lower k-value means a higher utilization rate and hence faster fatigue and higher wear on the bridge. The effect of these differences should be investigated further in later studies.
2

Jämförande studie mellan en ZIP-balksbro och en traditionell plattrambro : Utifrån underhåll, materialåtgång, last av trafik samt en utvärdering av det färdiga broprojektet

Carlsson, Catharina, Johnsson, Stefan January 2020 (has links)
I Sverige finns 21 000 broar som Trafikverket förvaltar (Trafikverket, 2018a). Två brotyper som finns är rambro och balkbro. Rambron är en av de vanligaste brotyperna och är uppbyggd som en fast inspänd konstruktion. Brosystemet kallas plattrambro eller balkrambro beroende på om balkarna eller plattan är det bärande elementet. Om bron istället är fritt upplagd på stödkonstruktionen, kallas brosystemet för plattbro eller balkbro (Vägverket, 1996). ZIP-balksbron är uppbyggd som en balkbro med en modell liknande omvända T-balkar som läggs fläns mot fläns. Brosystemet kommer ursprungligen från Spanbeton i Holland och gjorde under år 2019 premiär på den svenska marknaden med ett projekt i Härnösand. Bron har en spännvidd på 20,55 meter bestående av nio ZIP-balkar. Balkarna prefabriceras på Strängbetongs fabrik i Långviksmon utanför Härnösand. Projektet blev klart under hösten 2019. Syfte och mål med examensarbetet var att undersöka skillnader mellan ZIP-balksbron och en traditionell exemplifierad plattrambro. Aspekterna som undersöktes var underhållet hos de två brotyperna, materialåtgång av betong och armering, last av trafik samt att det gjordes en utvärdering av projektet. Resultatet visar att ZIP-balksbron kräver mer underhåll än en plattrambro eftersom balkbroar har övergångskonstruktion och brolager. Den tar även mer tid att inspektera då den innehåller manhål. ZIP-balksbron använder sig av 29,38 % mindre betong på en meter. Armeringsdifferensen mellan broarna är försumbart. Momentet av den vertikala respektive horisontella lasten av trafik är 44,5 % respektive 19,2 % större hos ZIP-balksbron jämfört med plattrambron. Resultatet visar även på ett bra utfört brobygge som kan hänvisas i brolösningen, samt nöjda parter från flera håll. Slutsatsen är att plattrambron är mer fördelaktig att använda ur ett underhållsperspektiv, en balkbro kräver betydligt större underhåll än de driftåtgärder som årligen sker på broar. Men, genom arbetets bevisning använder ZIP-balksbron mindre betong än hos en traditionell plattrambro och har en enkel byggprocess, vilket ökar förtroendet för brolösningen och framförallt för prefabricering inom brobranschen. Trots att brotypen kräver ett större underhåll samt en ökad och mer komplex momentfördelning än hos en plattrambro, kan säkerheten under byggtiden vara en avgörande aspekt vid val av brobyggen i framtiden. / The ZIP-beam bridge is constructed as a beam bridge with inverted T-beams placed with flanges next to each other. The bridge system is originally from Spanbeton in Holland and it is having its premiere on the Swedish market during year 2019 with an ongoing project in Härnösand. The bridge span is 20,55 meters consisted with nine ZIP-beams. The project was finished in august 2019.  The purpose and goal were to examine differences between the ZIP-beam bridge and a traditional slab frame bridge. The aspects to examine was maintence, use of concrete and reinforcement and traffic loads.  The results show that the ZIP-beam bridge requires more maintenance than the slab frame bridge. The ZIP-beam bridge uses 29,38 % less concrete per metre. The use of reinforcement is negligible. The moment force of the horisontal and vertical traffic loads is 44,5 % respective 19,2 % larger at the ZIP-beam bridge. The conclusion of this paper shows that even though the ZIP-beam bridge requires more maintenance and a more complex moment force than a slab frame bridge, the safety during the building time as well as the less amount of concrete used can be a conclusive factor when building bridges in Sweden in the future.

Page generated in 0.0314 seconds