Spelling suggestions: "subject:"chloride ion""
1 |
Electron transfer reactions of polynuclear complex ionsMohamed-Ibrahim, M. I. January 1988 (has links)
No description available.
|
2 |
Studies of passivation of iron and its breakdown by chloride ions using in situ spectroscopic ellipsometric techniqueChin, Yuan-Tung January 1990 (has links)
No description available.
|
3 |
Simultaneous Part-Per-Billion Determination of Sodium and Chloride IonsGan, Din-Chung 08 1900 (has links)
The method utilizes both cation and anion concentrator columns in parallel as a preconcentration system. The preconcentrator system is loaded using a reagent delivery module operated for a specific time at a preset flow rate. Total injection volumes of 2-5 ml are routinely used. Various chromatograms are discussed along with detailed information concerning detection limits for sodium and chloride, the system operating conditions, and the solutions to other pitfalls which have arisen during the course of this work.
|
4 |
Avaliação do método de extração eletroquímica de cloretos para reabilitação de estruturas de concreto com problemas de corrosão de armaduras. / Evaluation of the method of electrochemical extraction of chlorides ions for the rehabilitation of concrete structures with reinforcement corrosion problems.Monteiro, Eliana Cristina Barreto 11 October 2002 (has links)
O presente trabalho avalia o método de extração eletroquímica de íons cloreto na reabilitação de estruturas de concreto com problemas de corrosão de armaduras. Essa metodologia pode ser utilizada para evitar as desvantagens da recuperação tradicional do reparo localizado. No procedimento experimental foram realizados ensaios de laboratório em corpos-de-prova de forma prismática com dimensões reduzidas, moldados com diferentes relações água/cimento. A penetração de cloretos nos corpos-de-prova foi realizada de maneiras distintas: câmara de névoa salina e semiciclos de secagem e imersão parcial. Entre outros aspectos, foi avaliada a influência da espessura de cobrimento e da relação água/cimento na resposta do método através da determinação do teor inicial e final dos íons cloreto.Nas conclusões observa-se que a eficiência desse método foi até superior à encontrada em outros trabalhos da literatura. Nas séries cuja penetração de cloretos se deu através da câmara de névoa salina em média foram removidos 78% dos íons cloreto inicialmente presentes no concreto, nas séries onde a penetração de cloretos foi por semiciclos de secagem e imersão parcial obteve-se 91% de eficiência de remoção. / This present project evaluates the method of electrochemical extraction of chloride ions for the rehabilitation of concrete structures with reinforcement corrosion problems. This methodology can be used to prevent the disadvantages of traditional repair strategies in the patch repair. In the experimental procedure, tests performed in laboratory with specimens of prismatic form with reduced dimensions had been carried through, molded with different water/cement ratio. The chloride penetration in the specimens was carried through in distinct ways: salt spray chamber and semi cycles of drying and partial immersion. Among others aspects, the influence of the concrete cover and the water/cement ratio has been evaluated in the efficiency of method by determining the initial and the final chloride content. In the conclusions it is noticed that not only the test results did verify that this method successfully extracted chloride ions but it was much more efficient than previously reported in the literature. In the series where chloride penetration comes through the salt spray chamber, on average, this method removed 78% of the content of initial chloride ions in the concrete, in the series where the chloride penetration was done by semi cycles of drying and partial immersion, 91% of removal efficiency was obtained.
|
5 |
Eletro-oxidação do corante preto ácido 210 na presença de íons cloreto / Acid Black 210 dye electrooxidation in the presence of chloride ionsMagri, Thiago Cavalheiro 18 May 2009 (has links)
Neste trabalho foi estudada a degradação eletroquímica do azo corante Preto Ácido 210 (PA210) utilizando ânodos dimensionalmente estáveis de composição Ti/Ir0,10Sn0,90O2 e Ti/Ir0,30Sn0,70O2 preparados pelo método de decomposição térmica de precursores poliméricos. Os efeitos da presença e da concentração de cloreto, da composição eletródica, da densidade de corrente e do tempo de eletrólise sobre a oxidação eletroquímica de 100 ppm do corante PA210 foram avaliados. Em todas as condições estudadas, a remoção da absorbância em 465 nm (max) foi superior a 94% depois de 30 min de eletrólise. A redução de TOC foi proporcional à concentração de íons cloreto no eletrólito e não mostrou dependência da composição eletródica. A formação de espécies organocloradas variou na faixa de 8 a 16 ppm, sendo que as maiores concentrações de AOX foram obtidas para o eletrólito com maior concentração de cloreto. A redução máxima de TOC obtida foi de 25% depois de 90 min de eletrólise à densidade de corrente de 25 mA cm-2 para o eletrólito HCl 0,1 mol L-1. A eficiência de corrente foi calculada em relação ao TOC, sendo obtido o melhor resultado, de 9,14%, em 30 min de eletrólise com HCl 0,1 mol L-1 a 25 mA cm-2, sendo esta eficiência quatro vezes maior que para melhor eficiência em meio de H2SO4 0,1 mol L-1. O estudo da relação TOC / AOX indica que após as eletrólises houve a adição de cloreto as substâncias orgânicas gerando espécies organocloradas que apresentam uma relação de aproximadamente 1 átomo de cloro para cada 5 átomos de carbono. / The electrochemical degradation of the azo dye Acid Black 210 (AB210) using dimensionally stable anodes of composition Ti/Ir0,10Sn0,90O2 and Ti/Ir0,30Sn0,70O2 prepared by thermal decomposition of polymeric precursors was studied. The effects of the presence and concentration of chloride, electrode composition, current density, and electrolysis time on the electrochemical oxidation of 100 ppm dye PA210 were evaluated. In all the studied conditions, the removal of the absorbance at 465 nm (max) was greater than 94% after 30 min of electrolysis. The reduction of TOC was proportional to the concentration of chloride ions in the electrolyte and was not shown to be dependent on electrode composition. The formation of organochloride species varied in the range from 8 to 16 ppm, with higher concentrations of AOX being obtained for the electrolyte with high chloride concentration. The maximum reduction of TOC was 25% after 90 min of electrolysis, at a current density of 25 mA cm-2, for the electrolyte HCl 0.1 mol L-1. The current efficiency was calculated in relation to TOC, and the best result was 9.14% after 30 min of electrolysis in HCl 0.1 mol L-1 at 25 mA cm-2. This efficiency is four times higher than the best efficiency obtained by using only H2SO4 0.1 mol L-1 as electrolyte. The study of the TOC / AOX relationship indicates that there was addition of chloride to the organic substances after electrolysis, thus genetaring organochloride species with a ratio of about 1 atom of chlorine for every 5 carbon atoms.
|
6 |
Influência da microfissuração causada nas primeiras idades na durabilidade de concretos ao longo do tempo (Self-Healing)Venquiaruto, Simone Dornelles January 2017 (has links)
A racionalização e industrialização da construção promoveram profundas modificações no processo construtivo e nas técnicas gerenciais no Brasil. Muitas empresas construtoras, para garantir competitividade no mercado, buscaram soluções capazes de aumentar a velocidade de suas obras, tais como a redução do período de escoramento. A retirada antecipada do escoramento submete a estrutura a carregamento precoce, podendo desencadear a microfissuração do concreto. Como consequência, as deformações instantâneas e lentas tendem a aumentar e, consequentemente, manifestações patológicas podem ocorrer com maior intensidade. Objetivando simular o dano causado pela retirada antecipada do escoramento em idades iniciais, este trabalho investigou a influência do carregamento precoce por compressão axial na durabilidade de concretos distintos. O programa experimental foi executado em duas etapas. A primeira, investigou a influência da microfissuração causada por carregamento precoce na durabilidade de concretos produzidos com três tipos de cimento (CPV-ARI, CPIV RS e CPII Z) e três relações água/cimento (0,35, 0,50 e 0,70). Os carregamentos dos corpos de prova foram realizados em laboratório nas idades de 1, 3 e 7 dias. Para cada idade de carregamento foram rompidas, até o limite, duas amostras de referência e, a partir do valor médio de ruptura obtido, determinava-se os percentuais de carga (25%, 50% e 75%) que seriam aplicados nos concretos. Após o período de cura de 28 dias, as amostras foram ensaiadas à Penetração de Íons Cloreto e à Absorção Capilar de Água. A segunda etapa do programa experimental investigou a influência do prolongamento da cura na recuperação do dano causado pelo carregamento dos concretos nas primeiras idades. Foram produzidos concretos com dois tipos de cimento (CPV-ARI e CPIV) e uma relação água/cimento (0,50). Parte dos concretos receberam pré-carregamento de 75% da carga de ruptura na idade de 3 dias e parte permaneceu intacta, para servir como referência. Os ensaios mecânicos e de durabilidade (penetração de íons cloreto) foram executados ao longo do tempo (3, 7, 28 e 91 dias). Os resultados da Etapa 1 mostraram que, para todas as misturas investigadas, houve elevação da penetração de cloretos e da absorção de água com o aumento da intensidade do carregamento e da relação água/cimento dos concretos. Também foi observado a existência de um processo de microfissuração causado pela ação dos pré-carregamentos dos concretos com pouca idade. Os melhores desempenhos foram obtidos para as misturas com cimentos pozolânicos e não submetidas ao carregamento. Os resultados observados na Etapa 2 mostraram que o aumento do período de cura dos concretos refletiu positivamente nos resultados dos ensaios mecânicos e de durabilidade. Nessa etapa, também foram realizados ensaios microestruturais complementares que permitiram observar que a continuidade da cura promoveu uma recuperação parcial das microfissuras (self-healing) nos concretos. No entanto, nem todas foram fechadas. Constatou-se que as magnitudes das microfissuras remanescentes eram tal que poderiam se tornar um caminho preferencial para a entrada de íons cloreto nos concretos. Conclui-se que todos os concretos analisados apresentaram a mesma tendência de comportamento, de redução da entrada de íons cloreto com o aumento do período de cura. No entanto, o diferencial dos resultados foi notado na intensidade dos valores observados, significantemente reduzidos para os cimentos pozolânicos. / The rationalization and industrialization of the construction promoted deep changes in the constructive process and on the management techniques in Brazil. Most of the construction companies look for solutions that allow it to increase the speed of the constructions to ensure competitiveness on the market, such as the reduction on the time of structure execution, as well as the period of scores and anticipating the beginning of the masonry building. The early removal of the scores put the structure in an early loading without giving enough time to part of the cement hydration reactions happen, starting the concrete micro cracking process. Consequently, the instantaneous and slow deformations tend to increase and hence, pathologies may occur with greater intensity. This work researches the influence of early loading, by axial compression, in the durability of different types of concrete. The experimental program was implemented in two stages. The first stage investigated the influence of the micro cracking caused by pre loading on the durability of concretes produced with three different types of cement classified based on the Brazilian standards (CPV-ARI, CPIV RS and CPII Z) and three water/cement ratios (0.35, 0.50 and 0.70). The samples loading were realized in laboratory at the ages of 1, 3 and 7 days. Two reference samples were loaded until the limit, for each age of loading, and according to this average value of loading the percentage of loading to be applied on the samples in order to perform the durability tests were calculated (25%, 50% and 75%). The samples were placed in humid chamber for 28 days. After the cure period the samples were tested to Chloride ions penetration and water capillary absorption. The second stage of the experimental program investigated the influence of prolonged healing in the recovery of the damage caused by the concrete loading at early ages (microcracks). Concretes were produced with two types of cement (CPV-ARI and CPIV) and a water/cement ratio of 0,50. Part of the concrete received preload 75% of the tensile strength at age 3 days and some remained intact to serve as reference. The mechanical and durability tests were performed over time (3, 7, 28 and 91 days). The results of the first stage of the experimental program demonstrated that, for all the cements the increasing of the chloride penetration and water absorption is directly related with the increasing of the pre loading applied, to the increasing of the water/cement ratio on the mixture and the reduction of the age of the pre loading.The results obtained in Stage-1 confirmed the existence of a microcracking process caused by the action of the preload concrete at a young age. The best performances were observed for mixtures with pozzolan cement and not subjected to loading. The continued healing promoted a partial recovery of microcracks, verified by scanning electron microscopy images (SEM). However, not all were closed. It was found that the magnitude of the remaining microcracks were such that it could become a preferred path for the entry of chloride ions in concrete. All examined concrete showed the same trend behavior, reduction of the entrance of chloride ions with increasing curing period. However, the spread of results was noticed in the intensity of the observed values, significantly reduced for pozzolanic cements.
|
7 |
Análise da eficiência de espaçadores no concreto armado : impacto da corrosão por íons cloreto em diferentes condições de exposiçãoAdamatti, Deise Santos January 2016 (has links)
O concreto armado é um dos materiais de construção mais utilizados atualmente. Um dos fatores que levaram a essa preferência foi a maior durabilidade dos componentes, uma vez que o aço inserido no concreto se protege do ambiente externo e, consequentemente, de uma agressividade intensa pelo cobrimento de concreto empregado. Porém, mesmo considerando que um concreto adequadamente dosado, lançado e curado tende a ser durável, casos de deterioração prematura das estruturas de concreto podem ocorrer, trazendo à tona a importância do controle dos fatores responsáveis pela degradação natural da estrutura. Entre os fatores de deterioração, destaca-se a corrosão de armaduras, devido a sua elevada incidência e potencial de dano. Nas estruturas de concreto armado, são utilizados espaçadores para garantir o cobrimento especificado em projeto e o consequente confinamento do aço, garantindo assim o aumento da vida útil da estrutura. No entanto, a interface espaçador-concreto pode se tornar um ponto frágil para a entrada de agentes agressivos, como os íons cloreto. O objetivo deste trabalho foi avaliar a influência dessa interface utilizando espaçadores de argamassa industrializados e espaçadores de plástico, bem como a condição de exposição a que o concreto é submetido. Para a viabilização do estudo, foi utilizada a técnica de aceleração de corrosão, baseada no ensaio denominado Corrosão Acelerada por Imersão Modificada (CAIM) com aplicação de voltagem constante e corrente constante. Foram moldados corpos de prova em laboratório, com dimensões de 10 × 10 × 20 cm, estabelecidas pelo CAIM, com a utilização de dois tipos de espaçadores e cobrimentos estabelecidos de 25 mm e 50 mm, além de uma barra de aço com diâmetro de 12,5 mm, simulando uma situação real. Para a avaliação dos dados, as amostras passaram por análise microscópica, ensaio colorimétrico e de redimensionamento a laser, a fim de realizar análises qualitativas e quantitativas dos resultados. Este estudo verificou que tanto espaçadores de argamassa quanto de plástico contribuíram para uma maior degradação na região dos espaçadores, porém os de plástico apresentaram desempenho inferior quanto à ascensão de cloretos já na fase da iniciação. Além disso, a condição de exposição por ciclos de calor influencia claramente na interface entre espaçador e concreto, em especial nos espaçadores de plástico. / Reinforced concrete is one of the building materials most used today. One of the factors leading to this constructive choice was greater durability, since the steel is protected for the concrete cover from a strong aggressiveness of the external environment. However, even considering that an adequately dosed, cast and cured concrete, tends to be durable, cases of premature deterioration of concrete structures can occur, bringing to the fore the importance of control the factors responsible for the natural degradation of the structure. Among the deterioration factors, can be highlighted the rebars’ corrosion, because of the high incidence and potential damage. In reinforced concrete structures, spacers are used to ensure structural design specified cover depths and the steel confinement, which helps to increase the structure service life. However, the spacer-concrete interface can become a weak point for the entry of aggressive agents, such as chloride ions. This study aims to understand the influence of the spacer-concrete interface, analysing industrialized mortar spacers and plastic spacers, as well the concrete subjected to different curing condition. In order to make this work possible, a corrosion acceleration technique was used, based on corrosion acceleration test method, with application of constant voltage and constant current. Samples sizing 100 x 100 x 200 mm were cast in the laboratory. The samples were subjected to accelerated corrosion process stimulation, using two different spacers and cover depths (25 mm and 50 mm) and one rebar diameter (12.5 mm), simulating a real situation. The losses of cross section were measured by using microscopic analysis, colorimetric tests and 3D image reconstruction with laser, in order to perform qualitative and quantitative analysis. The results show that both, mortar spacers as plastic spacers, contributed to increase the transport in the contact region, but the plastic spacers produced the largest increase at the first stages. Furthermore, the increase of the temperature in the condition of exposure analysis by heat cycles influences in the interface between spacer and concrete, particularly with the plastic spacers.
|
8 |
Influência da microfissuração causada nas primeiras idades na durabilidade de concretos ao longo do tempo (Self-Healing)Venquiaruto, Simone Dornelles January 2017 (has links)
A racionalização e industrialização da construção promoveram profundas modificações no processo construtivo e nas técnicas gerenciais no Brasil. Muitas empresas construtoras, para garantir competitividade no mercado, buscaram soluções capazes de aumentar a velocidade de suas obras, tais como a redução do período de escoramento. A retirada antecipada do escoramento submete a estrutura a carregamento precoce, podendo desencadear a microfissuração do concreto. Como consequência, as deformações instantâneas e lentas tendem a aumentar e, consequentemente, manifestações patológicas podem ocorrer com maior intensidade. Objetivando simular o dano causado pela retirada antecipada do escoramento em idades iniciais, este trabalho investigou a influência do carregamento precoce por compressão axial na durabilidade de concretos distintos. O programa experimental foi executado em duas etapas. A primeira, investigou a influência da microfissuração causada por carregamento precoce na durabilidade de concretos produzidos com três tipos de cimento (CPV-ARI, CPIV RS e CPII Z) e três relações água/cimento (0,35, 0,50 e 0,70). Os carregamentos dos corpos de prova foram realizados em laboratório nas idades de 1, 3 e 7 dias. Para cada idade de carregamento foram rompidas, até o limite, duas amostras de referência e, a partir do valor médio de ruptura obtido, determinava-se os percentuais de carga (25%, 50% e 75%) que seriam aplicados nos concretos. Após o período de cura de 28 dias, as amostras foram ensaiadas à Penetração de Íons Cloreto e à Absorção Capilar de Água. A segunda etapa do programa experimental investigou a influência do prolongamento da cura na recuperação do dano causado pelo carregamento dos concretos nas primeiras idades. Foram produzidos concretos com dois tipos de cimento (CPV-ARI e CPIV) e uma relação água/cimento (0,50). Parte dos concretos receberam pré-carregamento de 75% da carga de ruptura na idade de 3 dias e parte permaneceu intacta, para servir como referência. Os ensaios mecânicos e de durabilidade (penetração de íons cloreto) foram executados ao longo do tempo (3, 7, 28 e 91 dias). Os resultados da Etapa 1 mostraram que, para todas as misturas investigadas, houve elevação da penetração de cloretos e da absorção de água com o aumento da intensidade do carregamento e da relação água/cimento dos concretos. Também foi observado a existência de um processo de microfissuração causado pela ação dos pré-carregamentos dos concretos com pouca idade. Os melhores desempenhos foram obtidos para as misturas com cimentos pozolânicos e não submetidas ao carregamento. Os resultados observados na Etapa 2 mostraram que o aumento do período de cura dos concretos refletiu positivamente nos resultados dos ensaios mecânicos e de durabilidade. Nessa etapa, também foram realizados ensaios microestruturais complementares que permitiram observar que a continuidade da cura promoveu uma recuperação parcial das microfissuras (self-healing) nos concretos. No entanto, nem todas foram fechadas. Constatou-se que as magnitudes das microfissuras remanescentes eram tal que poderiam se tornar um caminho preferencial para a entrada de íons cloreto nos concretos. Conclui-se que todos os concretos analisados apresentaram a mesma tendência de comportamento, de redução da entrada de íons cloreto com o aumento do período de cura. No entanto, o diferencial dos resultados foi notado na intensidade dos valores observados, significantemente reduzidos para os cimentos pozolânicos. / The rationalization and industrialization of the construction promoted deep changes in the constructive process and on the management techniques in Brazil. Most of the construction companies look for solutions that allow it to increase the speed of the constructions to ensure competitiveness on the market, such as the reduction on the time of structure execution, as well as the period of scores and anticipating the beginning of the masonry building. The early removal of the scores put the structure in an early loading without giving enough time to part of the cement hydration reactions happen, starting the concrete micro cracking process. Consequently, the instantaneous and slow deformations tend to increase and hence, pathologies may occur with greater intensity. This work researches the influence of early loading, by axial compression, in the durability of different types of concrete. The experimental program was implemented in two stages. The first stage investigated the influence of the micro cracking caused by pre loading on the durability of concretes produced with three different types of cement classified based on the Brazilian standards (CPV-ARI, CPIV RS and CPII Z) and three water/cement ratios (0.35, 0.50 and 0.70). The samples loading were realized in laboratory at the ages of 1, 3 and 7 days. Two reference samples were loaded until the limit, for each age of loading, and according to this average value of loading the percentage of loading to be applied on the samples in order to perform the durability tests were calculated (25%, 50% and 75%). The samples were placed in humid chamber for 28 days. After the cure period the samples were tested to Chloride ions penetration and water capillary absorption. The second stage of the experimental program investigated the influence of prolonged healing in the recovery of the damage caused by the concrete loading at early ages (microcracks). Concretes were produced with two types of cement (CPV-ARI and CPIV) and a water/cement ratio of 0,50. Part of the concrete received preload 75% of the tensile strength at age 3 days and some remained intact to serve as reference. The mechanical and durability tests were performed over time (3, 7, 28 and 91 days). The results of the first stage of the experimental program demonstrated that, for all the cements the increasing of the chloride penetration and water absorption is directly related with the increasing of the pre loading applied, to the increasing of the water/cement ratio on the mixture and the reduction of the age of the pre loading.The results obtained in Stage-1 confirmed the existence of a microcracking process caused by the action of the preload concrete at a young age. The best performances were observed for mixtures with pozzolan cement and not subjected to loading. The continued healing promoted a partial recovery of microcracks, verified by scanning electron microscopy images (SEM). However, not all were closed. It was found that the magnitude of the remaining microcracks were such that it could become a preferred path for the entry of chloride ions in concrete. All examined concrete showed the same trend behavior, reduction of the entrance of chloride ions with increasing curing period. However, the spread of results was noticed in the intensity of the observed values, significantly reduced for pozzolanic cements.
|
9 |
Análise da eficiência de espaçadores no concreto armado : impacto da corrosão por íons cloreto em diferentes condições de exposiçãoAdamatti, Deise Santos January 2016 (has links)
O concreto armado é um dos materiais de construção mais utilizados atualmente. Um dos fatores que levaram a essa preferência foi a maior durabilidade dos componentes, uma vez que o aço inserido no concreto se protege do ambiente externo e, consequentemente, de uma agressividade intensa pelo cobrimento de concreto empregado. Porém, mesmo considerando que um concreto adequadamente dosado, lançado e curado tende a ser durável, casos de deterioração prematura das estruturas de concreto podem ocorrer, trazendo à tona a importância do controle dos fatores responsáveis pela degradação natural da estrutura. Entre os fatores de deterioração, destaca-se a corrosão de armaduras, devido a sua elevada incidência e potencial de dano. Nas estruturas de concreto armado, são utilizados espaçadores para garantir o cobrimento especificado em projeto e o consequente confinamento do aço, garantindo assim o aumento da vida útil da estrutura. No entanto, a interface espaçador-concreto pode se tornar um ponto frágil para a entrada de agentes agressivos, como os íons cloreto. O objetivo deste trabalho foi avaliar a influência dessa interface utilizando espaçadores de argamassa industrializados e espaçadores de plástico, bem como a condição de exposição a que o concreto é submetido. Para a viabilização do estudo, foi utilizada a técnica de aceleração de corrosão, baseada no ensaio denominado Corrosão Acelerada por Imersão Modificada (CAIM) com aplicação de voltagem constante e corrente constante. Foram moldados corpos de prova em laboratório, com dimensões de 10 × 10 × 20 cm, estabelecidas pelo CAIM, com a utilização de dois tipos de espaçadores e cobrimentos estabelecidos de 25 mm e 50 mm, além de uma barra de aço com diâmetro de 12,5 mm, simulando uma situação real. Para a avaliação dos dados, as amostras passaram por análise microscópica, ensaio colorimétrico e de redimensionamento a laser, a fim de realizar análises qualitativas e quantitativas dos resultados. Este estudo verificou que tanto espaçadores de argamassa quanto de plástico contribuíram para uma maior degradação na região dos espaçadores, porém os de plástico apresentaram desempenho inferior quanto à ascensão de cloretos já na fase da iniciação. Além disso, a condição de exposição por ciclos de calor influencia claramente na interface entre espaçador e concreto, em especial nos espaçadores de plástico. / Reinforced concrete is one of the building materials most used today. One of the factors leading to this constructive choice was greater durability, since the steel is protected for the concrete cover from a strong aggressiveness of the external environment. However, even considering that an adequately dosed, cast and cured concrete, tends to be durable, cases of premature deterioration of concrete structures can occur, bringing to the fore the importance of control the factors responsible for the natural degradation of the structure. Among the deterioration factors, can be highlighted the rebars’ corrosion, because of the high incidence and potential damage. In reinforced concrete structures, spacers are used to ensure structural design specified cover depths and the steel confinement, which helps to increase the structure service life. However, the spacer-concrete interface can become a weak point for the entry of aggressive agents, such as chloride ions. This study aims to understand the influence of the spacer-concrete interface, analysing industrialized mortar spacers and plastic spacers, as well the concrete subjected to different curing condition. In order to make this work possible, a corrosion acceleration technique was used, based on corrosion acceleration test method, with application of constant voltage and constant current. Samples sizing 100 x 100 x 200 mm were cast in the laboratory. The samples were subjected to accelerated corrosion process stimulation, using two different spacers and cover depths (25 mm and 50 mm) and one rebar diameter (12.5 mm), simulating a real situation. The losses of cross section were measured by using microscopic analysis, colorimetric tests and 3D image reconstruction with laser, in order to perform qualitative and quantitative analysis. The results show that both, mortar spacers as plastic spacers, contributed to increase the transport in the contact region, but the plastic spacers produced the largest increase at the first stages. Furthermore, the increase of the temperature in the condition of exposure analysis by heat cycles influences in the interface between spacer and concrete, particularly with the plastic spacers.
|
10 |
Análise da eficiência de espaçadores no concreto armado : impacto da corrosão por íons cloreto em diferentes condições de exposiçãoAdamatti, Deise Santos January 2016 (has links)
O concreto armado é um dos materiais de construção mais utilizados atualmente. Um dos fatores que levaram a essa preferência foi a maior durabilidade dos componentes, uma vez que o aço inserido no concreto se protege do ambiente externo e, consequentemente, de uma agressividade intensa pelo cobrimento de concreto empregado. Porém, mesmo considerando que um concreto adequadamente dosado, lançado e curado tende a ser durável, casos de deterioração prematura das estruturas de concreto podem ocorrer, trazendo à tona a importância do controle dos fatores responsáveis pela degradação natural da estrutura. Entre os fatores de deterioração, destaca-se a corrosão de armaduras, devido a sua elevada incidência e potencial de dano. Nas estruturas de concreto armado, são utilizados espaçadores para garantir o cobrimento especificado em projeto e o consequente confinamento do aço, garantindo assim o aumento da vida útil da estrutura. No entanto, a interface espaçador-concreto pode se tornar um ponto frágil para a entrada de agentes agressivos, como os íons cloreto. O objetivo deste trabalho foi avaliar a influência dessa interface utilizando espaçadores de argamassa industrializados e espaçadores de plástico, bem como a condição de exposição a que o concreto é submetido. Para a viabilização do estudo, foi utilizada a técnica de aceleração de corrosão, baseada no ensaio denominado Corrosão Acelerada por Imersão Modificada (CAIM) com aplicação de voltagem constante e corrente constante. Foram moldados corpos de prova em laboratório, com dimensões de 10 × 10 × 20 cm, estabelecidas pelo CAIM, com a utilização de dois tipos de espaçadores e cobrimentos estabelecidos de 25 mm e 50 mm, além de uma barra de aço com diâmetro de 12,5 mm, simulando uma situação real. Para a avaliação dos dados, as amostras passaram por análise microscópica, ensaio colorimétrico e de redimensionamento a laser, a fim de realizar análises qualitativas e quantitativas dos resultados. Este estudo verificou que tanto espaçadores de argamassa quanto de plástico contribuíram para uma maior degradação na região dos espaçadores, porém os de plástico apresentaram desempenho inferior quanto à ascensão de cloretos já na fase da iniciação. Além disso, a condição de exposição por ciclos de calor influencia claramente na interface entre espaçador e concreto, em especial nos espaçadores de plástico. / Reinforced concrete is one of the building materials most used today. One of the factors leading to this constructive choice was greater durability, since the steel is protected for the concrete cover from a strong aggressiveness of the external environment. However, even considering that an adequately dosed, cast and cured concrete, tends to be durable, cases of premature deterioration of concrete structures can occur, bringing to the fore the importance of control the factors responsible for the natural degradation of the structure. Among the deterioration factors, can be highlighted the rebars’ corrosion, because of the high incidence and potential damage. In reinforced concrete structures, spacers are used to ensure structural design specified cover depths and the steel confinement, which helps to increase the structure service life. However, the spacer-concrete interface can become a weak point for the entry of aggressive agents, such as chloride ions. This study aims to understand the influence of the spacer-concrete interface, analysing industrialized mortar spacers and plastic spacers, as well the concrete subjected to different curing condition. In order to make this work possible, a corrosion acceleration technique was used, based on corrosion acceleration test method, with application of constant voltage and constant current. Samples sizing 100 x 100 x 200 mm were cast in the laboratory. The samples were subjected to accelerated corrosion process stimulation, using two different spacers and cover depths (25 mm and 50 mm) and one rebar diameter (12.5 mm), simulating a real situation. The losses of cross section were measured by using microscopic analysis, colorimetric tests and 3D image reconstruction with laser, in order to perform qualitative and quantitative analysis. The results show that both, mortar spacers as plastic spacers, contributed to increase the transport in the contact region, but the plastic spacers produced the largest increase at the first stages. Furthermore, the increase of the temperature in the condition of exposure analysis by heat cycles influences in the interface between spacer and concrete, particularly with the plastic spacers.
|
Page generated in 0.065 seconds