• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2025
  • 15
  • 14
  • 14
  • 13
  • 8
  • 7
  • 7
  • 6
  • 5
  • 5
  • 5
  • 3
  • 1
  • 1
  • Tagged with
  • 2060
  • 2060
  • 574
  • 562
  • 259
  • 237
  • 233
  • 220
  • 216
  • 211
  • 208
  • 196
  • 168
  • 168
  • 165
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
261

Utilização do pó de pedra basáltica em substituição à areia natural do concreto

Menossi, Rômulo Tadeu [UNESP] 05 March 2004 (has links) (PDF)
Made available in DSpace on 2014-06-11T19:24:45Z (GMT). No. of bitstreams: 0 Previous issue date: 2004-03-05Bitstream added on 2014-06-13T18:21:10Z : No. of bitstreams: 1 menossi_rt_me_ilha.pdf: 1956816 bytes, checksum: b2f637822c2521c0135f645f73a3fa33 (MD5) / Fundação de Ensino Pesquisa e Extensão de Ilha Solteira (FEPISA) / Mineracao Noroeste Paulista / O presente trabalho faz um estudo da substituição da areia natural existente no concreto por um material alternativo: o pó de pedra. O pó de pedra é o rejeito da exploração de pedreiras e seu diâmetro máximo é inferior a 4,8 mm. Em função de sua curva granulométrica, pode-se caracterizá-lo como sendo uma areia média. Atualmente, o pó de pedra não possui valor comercial de mercado, sendo considerado um “material marginal”, que não possui uma destinação definida, permanecendo estocado nos pátios das pedreiras, formando enormes pilhas que provocam vários impactos ambientais. A primeira etapa do trabalho consistiu em caracterizar os materiais que compuseram o concreto estudado. Após essa fase, foram confeccionados corpos-de-prova de concreto, utilizando-se cinco traços diferentes, de modo que a areia natural foi gradualmente substituída pelo pó de pedra, nas proporções de 25%, 50%, 75%, e 100%. Para cada traço, foram quantificados o seu abatimento e a resistência à compressão axial. Para caracterizar o pó de pedra, foram realizados os seguintes ensaios: granulometria, materiais pulverulentos, perda ao fogo, difração por raios X, massa específica, reatividade potencial álcali-agregado e pozolanicidade da fração fina passante na peneira #200. Como método de dosagem, foi utilizado o método do IPT/EPUSP. Por meio deste método, determinou-se um teor ideal de argamassa, que serviu de base para a elaboração de traços ricos (1:3,2) e de traços mais pobres (1:8,5), que, por sua vez, auxiliaram na construção dos diagramas de dosagem para cada uma das diferentes faixas de resistência do concreto. Considera-se que o objetivo principal desta pesquisa foi plenamente alcançado, uma vez que foi comprovada a viabilidade da completa substituição da areia pelo pó de pedra, em concretos com finalidade estrutural. / The present work makes a study of the substitution of the existent natural sand in the concrete for an alternative material: the stone powder. The stone powder is a reject of the exploration of quarries and its maximum diameter is less than 4,8 mm. In function of the granulometric curve, it can be characterized as it being a medium sand. Nowadays, the stone powder doesn't possess commercial value of market, being considered a marginal material, that it doesn't possess a defined destination, and that it stays stocked at the patios of the quarries, forming enormous piles that can cause several environmental impacts. The first stage of the work consisted of characterizing the materials that compose the concrete to be studied. After that phase, five different mixtures were used, so that the natural sand was substituted gradually by the stone powder, in the proportions of 25%, 50%, 75%, and 100%. For each mixture, the slump was measured and so the concrete axial compression resistance, by 100 mm x 200 mm cylinders. To characterize the stone powder, the following tests were accomplished: granulometric curve, powdery materials, loss to the fire, diffraction for X-rays, specific mass, reactivity potential alkali-attaché and pozolanicity of the fraction that pass in the sieve #200. It was used, as dosage method, the IPT/EPUSP method. Through this method, it can be determined an ideal tenor of mortar, that it served as base for the elaboration of rich mixtures (1:3,2) and of poorer mixtures (1:8,5), that aided in the construction of the dosage diagrams for each the different levels of resistance of the concrete. The main objective of this research was fully reached, once it was proven the viability of the complete substitution of the sand for the stone powder, in concretes with structural purpose.
262

Utilização do pó de pedra basáltica em substituição à areia natural do concreto /

Menossi, Rômulo Tadeu January 2004 (has links)
Orientador: Jefferson Sidney Camacho / Banca: Luiz Sergio Franco / Banca: Jorge Luís Akasaki / Resumo: O presente trabalho faz um estudo da substituição da areia natural existente no concreto por um material alternativo: o pó de pedra. O pó de pedra é o rejeito da exploração de pedreiras e seu diâmetro máximo é inferior a 4,8 mm. Em função de sua curva granulométrica, pode-se caracterizá-lo como sendo uma areia média. Atualmente, o pó de pedra não possui valor comercial de mercado, sendo considerado um "material marginal", que não possui uma destinação definida, permanecendo estocado nos pátios das pedreiras, formando enormes pilhas que provocam vários impactos ambientais. A primeira etapa do trabalho consistiu em caracterizar os materiais que compuseram o concreto estudado. Após essa fase, foram confeccionados corpos-de-prova de concreto, utilizando-se cinco traços diferentes, de modo que a areia natural foi gradualmente substituída pelo pó de pedra, nas proporções de 25%, 50%, 75%, e 100%. Para cada traço, foram quantificados o seu abatimento e a resistência à compressão axial. Para caracterizar o pó de pedra, foram realizados os seguintes ensaios: granulometria, materiais pulverulentos, perda ao fogo, difração por raios X, massa específica, reatividade potencial álcali-agregado e pozolanicidade da fração fina passante na peneira #200. Como método de dosagem, foi utilizado o método do IPT/EPUSP. Por meio deste método, determinou-se um teor ideal de argamassa, que serviu de base para a elaboração de traços ricos (1:3,2) e de traços mais pobres (1:8,5), que, por sua vez, auxiliaram na construção dos diagramas de dosagem para cada uma das diferentes faixas de resistência do concreto. Considera-se que o objetivo principal desta pesquisa foi plenamente alcançado, uma vez que foi comprovada a viabilidade da completa substituição da areia pelo pó de pedra, em concretos com finalidade estrutural. / Abstract: The present work makes a study of the substitution of the existent natural sand in the concrete for an alternative material: the stone powder. The stone powder is a reject of the exploration of quarries and its maximum diameter is less than 4,8 mm. In function of the granulometric curve, it can be characterized as it being a medium sand. Nowadays, the stone powder doesn't possess commercial value of market, being considered a "marginal material", that it doesn't possess a defined destination, and that it stays stocked at the patios of the quarries, forming enormous piles that can cause several environmental impacts. The first stage of the work consisted of characterizing the materials that compose the concrete to be studied. After that phase, five different mixtures were used, so that the natural sand was substituted gradually by the stone powder, in the proportions of 25%, 50%, 75%, and 100%. For each mixture, the slump was measured and so the concrete axial compression resistance, by 100 mm x 200 mm cylinders. To characterize the stone powder, the following tests were accomplished: granulometric curve, powdery materials, loss to the fire, diffraction for X-rays, specific mass, reactivity potential alkali-attaché and pozolanicity of the fraction that pass in the sieve #200. It was used, as dosage method, the IPT/EPUSP method. Through this method, it can be determined an ideal tenor of mortar, that it served as base for the elaboration of rich mixtures (1:3,2) and of poorer mixtures (1:8,5), that aided in the construction of the dosage diagrams for each the different levels of resistance of the concrete. The main objective of this research was fully reached, once it was proven the viability of the complete substitution of the sand for the stone powder, in concretes with structural purpose. / Mestre
263

A segurança do trabalho e sua previsão orçamentária em obras civis : estudo em fachada de edifício residencial multi-familiar

Altmann, Charles January 2005 (has links)
A preocupação com a segurança do trabalho deve estar presente já na fase de projeto de uma obra, pois nesta ocasião os processos executivos podem ser planejados cuidadosamente pensando-se, também, na saúde e segurança de todos os trabalhadores envolvidos durante a execução das etapas da edificação. A NR-18 quando especifica os itens a serem cumpridos pelo PCMAT, não enfatiza o planejamento da segurança do trabalho antes do início das obras, mas sim durante a execução das mesmas. Isto provavelmente induz os responsáveis pelas obras a não se preocuparem previamente à instalação do canteiro com saúde e segurança, apesar de ser mais apropriado para criarem-se projetos concebidos de maneira segura e ser o momento adequado para previsão de todos os elementos necessários para a garantia da segurança do trabalho e para o levantamento de seus custos para a realização da obra. Um relatório de custos de uma obra deve conter custos preventivos e produtivos. Tendo-se a preocupação com a forma inadequada que as empresas têm incluído os custos relativos à segurança no trabalho nos seus orçamentos, esta pesquisa é um estudo de caso que, para uma edificação real, verifica como esses custos foram considerados e detalha quais deveriam ser as considerações para a manutenção da saúde e segurança dos trabalhadores especificamente para a atividade de acabamento de fachadas. São incluídos na análise os custos preventivos e produtivos para esta determinada edificação alvo do estudo de caso, criando-se um relatório de custos.
264

Desenvolvimento de método para apropriação de custos diretos nos serviços da estrutura de concreto armado / Development of methods for appropriation of direct costs of services in concrete structure

Simões, Rudi Sato 12 December 2013 (has links)
Dissertação (mestrado)—Universidade de Brasília, Faculdade de Tecnologia, 2013. / Submitted by Gomes Neide (neide@bce.unb.br) on 2014-07-03T15:51:30Z No. of bitstreams: 1 2013_JonathanMelodeOliveira.pdf: 1637155 bytes, checksum: b157faa2ebaa8e797fc52dcb44446eed (MD5) / Rejected by Guimaraes Jacqueline(jacqueline.guimaraes@bce.unb.br), reason: Neide, Por favor, trocar o arquivo. Obrigada! Jacqueline on 2014-07-07T16:09:09Z (GMT) / Submitted by Gomes Neide (neide@bce.unb.br) on 2014-07-21T19:44:14Z No. of bitstreams: 1 2013_RudiSatoSimões.pdf: 3731859 bytes, checksum: aa2c74a8e8f19c780ce33735835f0a70 (MD5) / Approved for entry into archive by Guimaraes Jacqueline(jacqueline.guimaraes@bce.unb.br) on 2014-07-22T13:01:57Z (GMT) No. of bitstreams: 1 2013_RudiSatoSimões.pdf: 3731859 bytes, checksum: aa2c74a8e8f19c780ce33735835f0a70 (MD5) / Made available in DSpace on 2014-07-22T13:01:57Z (GMT). No. of bitstreams: 1 2013_RudiSatoSimões.pdf: 3731859 bytes, checksum: aa2c74a8e8f19c780ce33735835f0a70 (MD5) / Tem-se como objetivo principal do trabalho desenvolver um Método de Apropriação de Custos Diretos, validando-o nos serviços da Estrutura de Concreto Armado que abarcam os custos do serviço de fôrmas, escoramento, armação, protensão, controle tecnológico e concretagem, sendo ainda para este último, consideradas as atividades como lançamento do concreto e cura. A pesquisa é desenvolvida em uma obra edilícia em um bairro de alto padrão aquisitivo da cidade de Brasília, de propriedade de uma empresa de grande porte do ramo da construção civil. O desenvolvimento deste método é justificado, pois a construção civil é um dos setores mais proeminentes da economia brasileira, responsável por uma grande parcela do PIB nacional e assim sendo qualquer esforço para melhorar a estabilidade econômica destas empresas consequentemente acabaria por afetar positivamente o desenvolvimento do país como um todo. A estrutura da pesquisa escolhida para a construção do conhecimento na dissertação e consequentemente formulação do método foi o Estudo de Caso por se tratar de uma abordagem especifica somente ligada aos custos dos serviços da Estrutura de Concreto Armado (ECA) em associação a uma construtora. Como resultados têm-se o diagnóstico do sistema de custos da empresa, ressaltando as inter-relações entre os setores envolvidos e seus possíveis pontos de melhoria, E também a elaboração do o Método de Apropriação dos custos diretos e a sua validação por meio dos dados coletados nos serviços da ECA. _______________________________________________________________________________ ABSTRACT / Has as main objective to develop a method Appropriation Direct Costs , validating it in the concrete structure covering the costs of the service formwork , shoring , frames , prestressing , control technology and concreting work , and yet for the latter , the activities considered as the casting and curing . The research is developed in a construction site in a neighborhood with high purchasing pattern of Brasília, owned by a large company in the construction business. The development of this method is justified because the construction industry is one of the most prominent sectors of the Brazilian economy , accounts for a large share of national GDP and therefore any effort to improve the economic stability of these companies thus eventually positively affect the country's development as a whole. The structure of research chosen for the construction of knowledge in the dissertation and hence formulation of the method was the case study because it is an approach specifies only linked to the costs of the Reinforced Concrete Structure (RCS) services in association with a construction company. The results have the diagnosis of the company's cost system, emphasizing the interrelationships between the sectors involved and possible areas for improvement, and also the preparation of the Appropriation method of direct costs and their validation by means of data collected the RCS services.
265

Influência do planejamento e controle de obras nos horizontes de médio e curto prazo no tempo de entrega de edifícios residenciais em Goiânia / Influence of planning aim control works in horizons of medium and short-term on-time delivery of residential buildings in Goiânia

Silva, Mariana do Prado e 02 April 2012 (has links)
Dissertação (mestrado)—Universidade de Brasília, Faculdade de Tecnologia, Departamento de Engenharia Civil e Ambiental, 2012. / Submitted by Alaíde Gonçalves dos Santos (alaide@unb.br) on 2013-02-08T09:12:54Z No. of bitstreams: 1 2012_MarianaPradoSilva.pdf: 8568697 bytes, checksum: b09b41f6a94f4197576597ba20f837e3 (MD5) / Approved for entry into archive by Guimaraes Jacqueline(jacqueline.guimaraes@bce.unb.br) on 2013-02-08T10:55:57Z (GMT) No. of bitstreams: 1 2012_MarianaPradoSilva.pdf: 8568697 bytes, checksum: b09b41f6a94f4197576597ba20f837e3 (MD5) / Made available in DSpace on 2013-02-08T10:55:57Z (GMT). No. of bitstreams: 1 2012_MarianaPradoSilva.pdf: 8568697 bytes, checksum: b09b41f6a94f4197576597ba20f837e3 (MD5) / O presente trabalho buscou focar na influência que o planejamento e controle de obras nos horizontes de médio e curto prazo possuem no tempo de entrega de edifícios residenciais em Goiânia, pois são horizontes que apresentam uma grande informalidade no setor, principalmente, pela não ocorrência do detalhamento dos serviços referentes ao planejamento de longo prazo (início ao término do projeto) em períodos menores (três a seis meses), o que impossibilita o levantamento adequado das restrições e necessidades dos serviços, afetando diretamente a elaboração do plano de ação semanal. O objetivo principal da pesquisa foi diagnosticar e analisar as dificuldades que podem influenciar na entrega de obras dentro planejamento e controle da produção nos horizontes de médio e curto prazo para. posteriormente, propor soluções e aplicá-las. Para isso foi utilizada como estratégia de pesquisa a pesquisa-ação. aplicada em um empreendimento do tipo edifício residencial em Goiânia GO. O trabalho contou com a participação de uma empresa de grande porte que forneceu acesso a uma obra do tipo edifício residencial de alto padrão. A pesquisa foi delineada em sete etapas: definição da pesquisa, coleta de dados gerais e do processo de PCP da empresa, diagnóstico, planejamento das ações, implementação, avaliação das sugestões implementadas (utilizando o indicador PPC 'Percentual Plan Complete) e o gráfico das causas do não cumprimento dos serviços) e a verificação do aprendizado tanto da equipe quanto da pesquisadora. Concluiu-se que. com as implementações realizadas, houve uma melhora de aproximadamente 12% no indicador PPC (MOB Própria) da obra estudada, o que incentivou a empresa a aprimorar os processos relacionados "âo planejamento de médio e cimo prazo. Os principais motivos identificados para o não cumprimento dos serviços foram: atraso no serviço antecedente, absenteismo. erro de planejamento (falta de análise quanto à prioridade de execução dos serviços), falta de material na frente de serviço e retrabalho. As principais dificuldades encontradas e que estão diretamente relacionadas com o tempo de entrega foram: a falta de conhecimento sobre as técnicas e ferramentas de :xane;a:".:e:-.to e comrole cia produção dentro de toda a hierarquia, a ia 1:3 de comprometimento das equipes e a falta de profissionais capacitados para coordenarem e acompanharem os processos de planejamento. _______________________________________________________________________________________ ABSTRACT / This work focused on the influence that the planing and contr'oi of constructions in the horizons of short and medium term have on time delivery of residential buildings in Goiânia, because they have a large informality in the sector, mainly by the non-occurrence of detailing the services related to long-term planning /beginning at the end of the project) for shorter periods (three to six months), which prevents the proper collection of restrictions and requirements of the services, affecting directly the development of action plan weekly. The main objective of the research was to detect and analyze the difficulties that may influence the delivery of work within the planning and control of production in horizons of medium and short term, and then, propose solutions and implement them. For this, was used as a research strategy the action research, applied in a residential building in Goiânia /GO. The wo/'k included the participation of a large company that provided access to a residential building of high standard. The research was outlined in seven steps: definition of research, data collection and the general process of the company's PCP, diagnosis, action planning, implementation, evaluation of the suggestions implemented (using indicator PPC (Percent Plan Complete) and the graph of the causes of non-compliance services) and verification of learning of the staff and researcher. It was concluded that the implementations done, there was an improvement of approximately 12% in the PPC indicator of the work studied, which encouraged the company to improve processes related to the planning of short and medium term. The main reasons identified for non-compliance of the services were: delay of the antecedent service, absenteeism, planning error (lack of analysis regarding the execution priority: of services), lack of material in front of service and rework. The main difficulties that are directly related to the time of delivery were lack of knowledge about the techniques and tools for the planning and control of production in the entire hierarchy, a lack of commitment of staff and lack of trained professionals to coordinate and monitor the planning processes.
266

Análise experimental do reforço híbrido de vigas “T” de concreto armado com colagem externa de compósitos de fibras de carbono e de vidro / Experimental analysis of hybryd strengthening reinforced concrete “T” beams with externaly bonded composites of carbon and glass fiber

Rojas Manzano, Manuel Alejandro 24 August 2012 (has links)
Dissertação (mestrado)—Universidade de Brasília, Faculdade de Tecnologia, Departamento de Engenharia Civil e Ambiental, 2012. / Submitted by Jaqueline Ferreira de Souza (jaquefs.braz@gmail.com) on 2013-01-11T14:03:54Z No. of bitstreams: 1 2012_ManuelAlejandroRojasManzano.pdf: 8368344 bytes, checksum: 33ad2bd5c78ae4194bdf24b4c838d26c (MD5) / Approved for entry into archive by Marília Freitas(marilia@bce.unb.br) on 2013-01-21T11:21:34Z (GMT) No. of bitstreams: 1 2012_ManuelAlejandroRojasManzano.pdf: 8368344 bytes, checksum: 33ad2bd5c78ae4194bdf24b4c838d26c (MD5) / Made available in DSpace on 2013-01-21T11:21:34Z (GMT). No. of bitstreams: 1 2012_ManuelAlejandroRojasManzano.pdf: 8368344 bytes, checksum: 33ad2bd5c78ae4194bdf24b4c838d26c (MD5) / Neste trabalho foi estudado e avaliado o comportamento estrutural do reforço híbrido à flexão de vigas em concreto armado com seção transversal “T” com a técnica de materiais compósitos colados externamente na superfície do concreto, submetidas a carregamentos estáticos até a ruptura. O programa experimental consistiu no ensaio de 5 vigas “T” simplesmente apoiadas submetidas a duas cargas concentradas aplicadas a 1,50 m do apoio e com um vão de 4,00 m, sendo de 0,63% a taxa de armadura das vigas. Uma viga sem reforço foi ensaiada como referência e quatro vigas foram reforçadas com duas camadas de polímeros reforçados com fibras de carbono (PRFC) e de vidro (PRFV) em diferentes sequências na superfície do concreto. A análise foi realizada com os resultados da carga última, modos de ruptura, deslocamento vertical, deformação específica na armadura de flexão e cisalhamento, deformação específica do concreto, deformação específica do compósito e o desenvolvimento da fissuração. Além disso, foram feitas adaptações nas normas ACI 440.2R:2008 e Bulletin 14 FIB:2001, para calcular a carga última das vigas reforçadas e realizar as comparações com os resultados experimentais. O incremento da carga última das vigas reforçadas em relação à viga de referência variou entre 15,3 % e 20,3 %. A viga que apresentou o melhor resultado foi a reforçada primeiro com uma camada de PRFV e depois com uma camada de PRFC. Os modos de ruptura apresentados nas vigas reforçadas foram descolamento do PRF (primeira camada de PRFC) e delaminação do cobrimento (primeira camada de PRFV). Estes resultados mostram a influência da sequência de colagem do PRF no comportamento das vigas. _______________________________________________________________________________________ ABSTRACT / In this work it was studied and evaluated the structural behavior of flexural hybrid strengthening of reinforced concrete beams with "T" cross section with the technique of externally bonded composite materials on the surface of concrete under static loading up to failure. The experimental program consisted of 5 simply supported "T" beam tested under two concentrated loads applied to1,50 m from the support and with a span of 4,00 m and with 0.63% of flexural reinforcement ratio. One unstrengthened beam was tested as reference and 4 beams were reinforced with two layers of carbon and glass fiber reinforced polymers in different sequences on the surface of the concrete.The analysis was performed with the results of ultimate load, failure modes, vertical deflection, strain in flexure and shear steel, strain in the concrete, strain in the composite and cracking pattern. In addition, adaptations were made in the codes ACI 440.2R:2008 and Bulletin 14 FIB:2001, for calculate the ultimate load of strengthened beams and make comparisons with the experimental results. The increase in the ultimate load of the beams strengthened in relation to the reference beam varied between 15,3 % and 20,3 %. The beam that showed the best result was the reinforced beam with a first layer of GFRP and then with a layer of CFRP. The failure modes presented in the strengthened beams were PRF debonding (first layer of CFRP) and cover delamination (first layer of GFRP). These results show the influence of the sequence of bonding of the PRF in the behavior of beams.
267

Avaliação da resistividade elétrica do concreto como parâmetro para a previsão da iniciação da corrosão induzida por cloretos em estruturas de concreto / Evaluation of the electrical resistivity of concrete as a parameter to calculation of initiation period of corrosion induced by chlorids in concrete structures

Santos, Lourdimine 04 1900 (has links)
Dissertação (mestrado)—Universidade de Brasília, Faculdade de Tecnologia, Departamento de Engenharia Civil e Ambiental, 2006. / Submitted by Fernanda Weschenfelder (nandaweschenfelder@gmail.com) on 2009-11-03T17:59:09Z No. of bitstreams: 1 dissertacao LOURDIMINE SANTOS.pdf: 1793040 bytes, checksum: 598702a943cf62a09e6b1f8402d4db36 (MD5) / Approved for entry into archive by Gomes Neide(nagomes2005@gmail.com) on 2010-07-05T20:37:55Z (GMT) No. of bitstreams: 1 dissertacao LOURDIMINE SANTOS.pdf: 1793040 bytes, checksum: 598702a943cf62a09e6b1f8402d4db36 (MD5) / Made available in DSpace on 2010-07-05T20:37:55Z (GMT). No. of bitstreams: 1 dissertacao LOURDIMINE SANTOS.pdf: 1793040 bytes, checksum: 598702a943cf62a09e6b1f8402d4db36 (MD5) Previous issue date: 2006-04 / A resistividade elétrica do concreto é um parâmetro bastante sensível às suas características microestruturais, especialmente em relação à conectividade e à distribuição dos diâmetros dos poros. Este parâmetro está relacionado à resistência do concreto à penetração de líquidos ou gases e ao conteúdo de umidade presente nos poros do concreto, fornecendo, assim, indicações a respeito da sua durabilidade. O presente trabalho teve como objetivo avaliar a viabilidade de utilização da resistividade elétrica do concreto como parâmetro para a previsão da iniciação da corrosão em estruturas submetidas à ação dos íons cloreto. Para isso, foram analisadas as relações existentes entre a resistividade elétrica e alguns dos fatores que influenciam a duração do período de iniciação da corrosão das armaduras. Os resultados obtidos foram utilizados para avaliar a viabilidade de utilização do modelo proposto por Andrade (2004) para prever a vida útil de estruturas de concreto armado a partir da sua resistividade elétrica. Foram utilizados concretos com relação água/aglomerante 0,4 e 0,5, com diferentes percentuais de sílica ativa (0% e 10%) em substituição à massa de cimento. Os resultados mostraram a existência de uma correlação entre a resistividade elétrica e o volume de poros com diâmetros entre 0,05 μm e 0,1 μm presente no concreto, uma tendência de redução da capacidade de absorção com o aumento da resistividade elétrica do concreto e uma correlação inversamente proporcional com a difusividade iônica. Além disso, foi observada a existência de uma correlação entre o período de iniciação obtido experimentalmente e a resistividade elétrica do concreto, o que demonstra a viabilidade da utilização deste parâmetro na avaliação da sua vida útil. No entanto, os resultados também indicaram que a aplicação deste parâmetro em estruturas de concreto, principalmente quando forem utilizados concretos com adição de sílica ativa, requer que sejam considerados fatores que interferem no processo construtivo. __________________________________________________________________________________ ABSTRACT / The electrical resistivity of concrete is a very sensitive parameter to its microstructural characteristics, especially in relation to the connectivity and the pore size distribution. This parameter is related to the resistance of the concrete to the penetration of liquids or gases and the moisture content present in the concrete pore network, and therefore, may furnish indicators in relation to its durability. The object of this paper is to evaluate the viability of using the electrical resistivity as a parameter to calculation of the initiation period of corrosion in structures subjected to the action of chloride ions. For this, the relationships existent between electrical resistivity and some of the factors that influence the duration of initiation period of the reinforcement were analyzed. The results obtained were used to evaluate the viability of using the model proposed by Andrade (2004) to predict the service life of reinforced concrete structures by their electrical resistivity. Concrete samples with a water/binder ratio of 0.4 and 0.5 were used, with different rates of silica fume (0% and 10%) as a replacement for cement. The results demonstrated the existence of a correlation between the electrical resistivity and the volume of pores with diameters between 0.05 μm and 0.1 μm present in the concrete; a tendency of lower absorption capacity when there is a higher electrical resistivity in the concrete; and a correlation inversely proportionate to the ionic diffusivity. Furthermore, the existence of a correlation between the initial period obtained experimentally and the electrical resistivity of concrete was observed, which demonstrates the viability of using this parameter in the evaluation of its service life. However, the results also indicated that the application of this parameter in real structures, especially in concrete where silica fume has been used, requires consideration of the factors that influence the construction process.
268

Indicadores de desempenho : uma análise nas empresas de construção civil do município de João Pessoa - PB

Holanda, Fernanda Marques de Almeida 05 1900 (has links)
Dissertação (mestrado)—Universidade de Brasília, Programa Multiinstitucional e Inter-regional de Pós-Graduação em Ciências Contábeis, 2007. / Submitted by samara castro (sammy_roberta7@hotmail.com) on 2009-11-30T21:31:47Z No. of bitstreams: 1 2007_FernandaMarquesdeAlmeidaHolanda.pdf: 399240 bytes, checksum: cd3651396f36d4eef1460e74425a4315 (MD5) / Approved for entry into archive by Daniel Ribeiro(daniel@bce.unb.br) on 2009-12-01T23:23:52Z (GMT) No. of bitstreams: 1 2007_FernandaMarquesdeAlmeidaHolanda.pdf: 399240 bytes, checksum: cd3651396f36d4eef1460e74425a4315 (MD5) / Made available in DSpace on 2009-12-01T23:23:52Z (GMT). No. of bitstreams: 1 2007_FernandaMarquesdeAlmeidaHolanda.pdf: 399240 bytes, checksum: cd3651396f36d4eef1460e74425a4315 (MD5) Previous issue date: 2007-05 / A medida de desempenho é um tema que vem sendo estudado e discutido no meio acadêmico. Merece destaque por ser um elemento essencial para o gerenciamento do desempenho da empresa, pois fornece informações que ajudam no planejamento e controle dos processos gerenciais, possibilitando, ainda, o monitoramento e controle dos objetivos e metas estratégicas. Nessa perspectiva, esta pesquisa teve como objetivo investigar quais indicadores de desempenho que são utilizados pelos gestores das empresas do subsetor de edificações da construção civil do município de João Pessoa - PB. O caminho escolhido para o alcance dos objetivos propostos passou pela pesquisa bibliográfica, com o intuito de se verificar na literatura especializada as discussões em torno do uso e da utilidade dos indicadores de desempenho. Também passou pela pesquisa de campo, a qual foi efetivada mediante aplicação de questionário, com a intenção de verificar quais os indicadores presentes na literatura são utilizados pelo setor e quais as características das empresas que utilizam indicadores. O setor de construção civil merece destaque por ser uma atividade que causa efeito multiplicador sobre outros setores da economia, tais como: comércio de materiais de construção, indústria de componentes, empresas imobiliárias e instituições de ensino e pesquisa. Para atingir os objetivos propostos nesta pesquisa, foram utilizados dois métodos distintos: a análise descritiva e a análise multidimensional. A amostra considerada na pesquisa foi de 28 empresas do subsetor de edificações do município de João Pessoa - PB. As principais características encontradas na pesquisa das empresas que utilizam indicadores para tomada de decisão foram: empresa de pequeno porte; empresa com certificados de qualidade (ISO); empresa cujo gestor é um profissional contratado no mercado. Verificou-se, ainda, que a preferência dos gestores é maior em relação aos indicadores financeiros, isso em comparação aos indicadores não-financeiros. O fluxo de caixa é o indicador financeiro mais utilizado pelos gestores da pesquisa entre as empresas que confirmaram utilizar indicadores de desempenho. _______________________________________________________________________________ ABSTRACT / The performance measure is a theme that has been studied and discussed in the academic environment. It deserves prominence for being an essential element for the company’s measure administration, because supplies information that help in the planning and control of the managerial processes, making possible, the verification and control of the objectives and strategic goals. In this perspective, the research had as objective investigates which performance indicators are used by the managers of the companies from the sub-sector of building in the João Pessoa – PB city. The way chosen for the reach of the considered objectives passed for the bibliographical research, with the intention of verifying in specialized literature the discussions around the use and utility of the performance indicators. Also passed for the field research, which was accomplished by means of questionnaire application, with the intention to verify which indicators present in literature are used by the sector and which characteristics of the companies who use indicators. The sector of building deserves prominence for being an activity that cause multiplying effects on other sectors of the economy, such as: commerce of building materials, industry of components, companies and institutions of education and research. To reach the objectives considered in this research, two distinct methods had been used: the descriptive analysis and the multidimensional analysis. The sample considered in the research was of 28 companies of the sub-sector of building form the João Pessoa - PB city. The main characteristics found in the research of the companies who use indicators for decision taking had been: small business company; company with certified of quality (ISO); company whose manager is a professional contracted in the market. It was verified, still, that the preference of the managers is bigger in relation to the financial indicators, this comparing to the non-financial indicators. The cash flow is the financial indicator more used by the managers of the research among the companies who had confirmed the use of performance measure.
269

Metodologia para a avaliação da sustentabilidade de habitações de interesse social com foco no projeto

Carvalho, Michele Tereza Marques 04 1900 (has links)
Tese (doutorado)—Universidade de Brasília, Faculdade de Tecnologia, Departamento de Engenharia Civil e Ambiental, 2009. / Submitted by Raquel Viana (tempestade_b@hotmail.com) on 2010-05-04T18:11:46Z No. of bitstreams: 1 2009_MicheleTerezaMarquesCarvalho.pdf: 3617105 bytes, checksum: 298de721265b504da100dc284149c901 (MD5) / Approved for entry into archive by Daniel Ribeiro(daniel@bce.unb.br) on 2010-05-06T18:25:52Z (GMT) No. of bitstreams: 1 2009_MicheleTerezaMarquesCarvalho.pdf: 3617105 bytes, checksum: 298de721265b504da100dc284149c901 (MD5) / Made available in DSpace on 2010-05-06T18:25:52Z (GMT). No. of bitstreams: 1 2009_MicheleTerezaMarquesCarvalho.pdf: 3617105 bytes, checksum: 298de721265b504da100dc284149c901 (MD5) Previous issue date: 2009-04 / É desenvolvida neste trabalho uma metodologia para análise de sustentabilidade de projetos de habitações de interesse social, denominada MASP-HIS. A principal motivação para o trabalho é a necessidade de indicadores e índices de sustentabilidade relacionados a edificações dessa natureza, que se insiram no contexto das ações orientadas ao desenvolvimento mais sustentável da construção. Inicialmente, é feita uma revisão da literatura, para a verificação do estado atual das ações relacionadas à sustentabilidade e das metodologias existentes no Brasil e no mundo, relativas ao tema; posteriormente, são elaborados os critérios para a construção da metodologia MASP-HIS. Os critérios englobam a definição de temas para a verificação dos requisitos de sustentabilidade do projeto, e de dados necessários para as especificações dos materiais que compõem os diversos subsistemas de uma edificação, em especial o subsistema de vedações verticais. Para viabilizar os cálculos dos indicadores e índices de sustentabilidade e as considerações lógicas e estruturais previstas na metodologia MASP-HIS, foi desenvolvida uma ferramenta computacional, denominada PROMASP-HIS. A validação da metodologia MASP-HIS foi feita com a análise de dois projetos de edificações de interesse social da região metropolitana de Goiânia. Verifica-se que a sustentabilidade dos projetos analisados foi baixa, com médias, para as diversas combinações de materiais especificados, de 42,14 e 41,23, numa escala de 0 a 100 - diferença média de 0,91% -. O aspecto econômico foi o mais sustentável (médias de 57,18 e 52,84), e os aspectos menos sustentáveis foram o ambiental (médias de 34,56 e 32,41) e o sociocultural (médias 34,68 e 32,44). Portanto, é razoável afirmar que os dois projetos precisam melhorar o seu desempenho quanto à sustentabilidade, principalmente nos aspectos ambiental e sociocultural. A metodologia MASP-HIS é a primeira metodologia, no contexto brasileiro, que trata de projetos e especificações de materiais e componentes de habitações de interesse social levando em consideração os aspectos ambiental, sociocultural e econômico. Ela é muito útil, pois pode ser usada para a identificação e solução de pontos críticos de projeto, quando são analisados os índices de sustentabilidade parciais, e para o mapeamento da sustentabilidade de projeto na localidade de aplicação, bem como para a verificação da evolução do índice de sustentabilidade ao longo do tempo, quando é analisado o índice de sustentabilidade de todo o projeto. _________________________________________________________________________________ ABSTRACT / This work provides a methodology for the sustainability analysis of social interest habitations projects, named MASP-HIS. The main motivation of this research is the need for sustainability indicators and indexes related to edifications of this nature, all of which can be inserted in the context of actions oriented to a more sustainable development of constructions. First review of the literature is presented to assess the present state of sustainabilityrelated actions of the existing methodology in Brazil and throughout the world; the criteria for the formulation of the MASP-HIS methodology are elaborated. These include the definition of issues for the verification of the project’s sustainability requirement, as well as project data needed for the specification of materials which make up the various subsystems of an edification, particularly vertical wall subsystems. In order to attribute feasibility to the calculus of sustainability indicators and indexes as well as to logical and structural considerations predicted by the MASP-HIS methodology, a computational tool named PROMASP-HIS has been developed. The MASP-HIS methodology has been validated via the project analysis of two social interest edifications located in the metropolitan region of Goiânia-Brazil. The sustainability of the assessed projects was low, with averages of 42,14 and 41,23 in a 0-100 scale for several specified materials – a mean difference of 0,91%. The economic aspect was the most sustainable (averages of 57,18 and 52,84), whereas the least sustainable were the environmental (averages of 34,56 and 32,41) and the sociocultural (averages of 34,68 and 32,44) aspects. Thus, it is reasonable to assert that both projects need to improve their performance on sustainability, particularly regarding environmental and sociocultural aspects. The MASP-HIS methodology is the first in Brazil to handle projects, materials, and component specifications of social interest habitations while accounting for environmental, sociocultural, and economic factors. It is highly useful because it can be used to identify and solve critical points of projects when partial sustainability indexes are analised. It also maps the sustainability of projects in their specific locations of applications and verifies the evolution of sustainability indexes.
270

Produção do espaço em Águas Claras/Brasília : uma leitura a partir da relação contraditória entre capital e trabalho na construção civil / Production of space in Águas Claras/Brasília : a reading from the contradictory relation between capital and work in the civil construction

Leite, Sílvia Silva Cavalcante January 2009 (has links)
Dissertação (mestrado)—Universidade de Brasília, Instituto de Ciências Humanas, Departamento de Geografia, 2009. / Submitted by Allan Wanick Motta (allan_wanick@hotmail.com) on 2010-06-07T18:19:08Z No. of bitstreams: 1 Silvia Cavalcante - Dissertacao Mestrado_.pdf: 4164401 bytes, checksum: 5854d30249667be44882faf9bc71da2c (MD5) / Approved for entry into archive by Daniel Ribeiro(daniel@bce.unb.br) on 2010-06-07T19:03:43Z (GMT) No. of bitstreams: 1 Silvia Cavalcante - Dissertacao Mestrado_.pdf: 4164401 bytes, checksum: 5854d30249667be44882faf9bc71da2c (MD5) / Made available in DSpace on 2010-06-07T19:03:43Z (GMT). No. of bitstreams: 1 Silvia Cavalcante - Dissertacao Mestrado_.pdf: 4164401 bytes, checksum: 5854d30249667be44882faf9bc71da2c (MD5) Previous issue date: 2009 / O espaço geográfico é prenhe de contradições, pois expressa e reproduz as contradições presentes na sociedade. No espaço urbano, os termos de materialização das contradições se constituem no desenrolar das estratégias e práticas dominantes de reprodução do capital e de manutenção do capitalismo. No processo de (re)produção do espaço urbano, orientado pela lógica do capital, temos então o acirramento da contradição entre valor de uso e valor de troca, entre capital e trabalho, entre riqueza e pobreza. Coerente com essa lógica, o processo de (re)produção do espaço urbano inclui a construção das bases materiais necessárias à reprodução da vida e ao modelo de sociedade historicamente constituído. Nesse processo, o trabalho se coloca como essencial e - na sociedade contemporânea - tem na construção civil, em última instância, um dos termos de comando do processo de trabalho e de realização das contradições entre capital e trabalho na edificação das formas urbanas. Nessa perspectiva, nos voltamos à análise da produção do espaço urbano, com enfoque sobre o papel desempenhado pela construção civil e, mais especificamente, à forma como a classe operária se integra nesse processo, além das repercussões socioespaciais daí emanadas. De forma controversa, os operários da construção civil são negados enquanto sujeitos no processo de produção do espaço, sendo submetidos a forte exploração, ao passo que o produto de seu trabalho alimenta a acumulação de capital. A partir da problemática exposta, o objetivo é analisar o processo de produção do espaço urbano a partir da relação entre capital e trabalho na construção civil. Considera-se, como recorte empírico, a Região Administrativa de Águas Claras, que se encontra em intenso processo de construção, orientado pela lógica de reprodução do capital imobiliário. _________________________________________________________________________________________ ABSTRACT / The geographical space is full of contradictions because it expresses and reproduces the contradictions present in the society. In the urban space, the terms of materialization of the contradictions constitute themselves in the unroll of the dominant strategies and practices of reproduction of the capital and the maintenance of the capitalism. In the process of (re)production of the urban space, guided by the capital logic, we have then the hardening of the contradiction between use value and exchange value, between capital and labor, between richness and poverty. Coherent with this logic, the process of (re)production of the urban space includes the construction of the material bases necessaries to the reproduction of life and to the model of society historically constituted. In this process, labor puts itself as essential and – in the contemporary society – it has in the civil construction, in last instance, one of the command terms of the labor process and the fulfillment of the contradictions between capital and labor in the edification of the urban shapes. In this perspective, we turn to the analysis of the production of urban space with focus in the role played by civil construction and, more specifically, beyond the socialspatial repercussions originating from it. In a controversial way, the workers of the civil construction are denied as subjects in the process of production of the space, being submitted to strong exploration, while the product of his/her labor has high capacity of capital accumulation. From the exposed problematic, we direct our analysis considering as empirical cut the Administrative Region of Águas Claras that is under an intense construction process, guided by the logic of the reproduction of the property capital.

Page generated in 0.0839 seconds