101 |
Ekonomické aspekty stanovování minimálních průtoků na vodních dílech na Jizeře. / Economic aspects of setting the minimum flow for water power plants on Jizera river.Vocel, Martin January 2009 (has links)
There is an obligation to hold a minimal flow when running a water power plant in a current czech legistation. There are environmental reasons to determine the minimum discharge and the way to set it is not valid at the moment. We can see a difference in a type of water power stations when comparing the effects from electric power which is produced in water power plant situated on czech rivers and the damage that does not appear on the environment. The weir type of power plant harms the surroundings mildly except of the possible migration obstacles. But the derivation type makes loss that could be hardly compensate by the produced electricity. Different methods of evaluating the enrironment brinks various results and that is the reason why it is hard to say how much the effects from producing the electricity exceed the benefits arising from instream water or vice versa. The only conclusion that can be said is the advice about including more points of view when setting the minimum flowage.
|
102 |
Ekonomické hodnocení ozdravného protiradonového opatření u rodinných domů / Economic valuation of radon mitigation countermeasures applied in family housesČerný, Petr January 2010 (has links)
The aim of the thesis is to valuate economic effectivity of radon mitigation countermeasures co-financed by the state applied in family houses which display high radon level. Feasibility of the mitigation is analysed without concering financing source. Furthermore, the project is valuated from the point of view of the house owner and from the state's point of view. Presence of residental radon is increasing lung cancer probability, radon has notable healt effects. Costs and benefit of the hypothetic project are vauated in CBA analysis. The author finds the project unfeasible. CBA is discussed as a suitable economic tool for fiding alternative technological method aiming to social effectivity. Providing feasible change of remediation parametres caused positive social value of the project, socioeconomic flow in the state point of view would remain negative. Therefore, state participation on the radon mitigation countermeasures of private family houses is not reccomended.
|
103 |
Cost-effectiveness of the promotion of physical activity in health care /Hagberg, Lars, January 2007 (has links)
Diss. (sammanfattning) Umeå : Univ., 2007. / Härtill 5 uppsatser.
|
104 |
Equity in welfare evaluations : the rationale for and effects of distributional weighting /Bångman, Gunnel, January 2006 (has links)
Diss. (sammanfattning) Örebro : Örebro universitet, 2006. / Härtill 4 uppsatser.
|
105 |
Hodnocení efektivity implementace systému reportingu / Effectivity assessment of the implementation of the reporting systemŘežábek, Martin January 2017 (has links)
Thesis is focused on effectivity assessment of the reporting system of the selected company and the comparison of the former and current reporting solution. This is achieved by the appropriate literature research, creation of the individual assessment model based on the methodology of the analogy from the information systems assessment and based on the experience of the selected company's employees and the experience of the experts in the field of corporate financial management with the focus on the reporting systems. Model is defined by the set of criteria structured into the groups and by the weights assigned to criteria along with the value for each of them. The last phase consists of stepping out of the individual assessment and defines the generally applicable model, usable on the wide range of different reporting systems.
|
106 |
Metody ocenění a hodnocení IT investic / Methods for IT investment evaluation and decision makingMizera, Jiří January 2009 (has links)
The aim of the final thesis Methods for IT investment evaluation and decision making is to verify relationship between strategy of the company its Enterprise Architecture and IT investments evaluation. To achieve the aim of the thesis is necessary to define the term of Enterprise Architecture and its relationship with IT Project Portfolio Management. The literature retrieval which follows after is focused on calculation of IT investment profitability and return. The calculation is very difficult due to intangible benefits which are one of the common goals of IT investments. The customer satisfaction, improve of the current business process or employees satisfaction are one of the examples of the intangible benefits. Cost/Benefit analysis is one of the methods depicted for calculation of the intangible benefits. Methods for decision support as Analytic Hierarchy Process are highlighted as the significant instrument. The risk analysis and simulation of the risk in IT investments decision making are also mentioned but according to the scope of thesis just very briefly. Major methods are used on the model example of the evaluation and decision making process to demonstrate the whole theoretical part of the thesis. The biggest added value of the final thesis is the deep analysis of the relationship between strategy of the company its Enterprise Architecture and IT investment evaluation. Entire final thesis should be used as the fundament for IT investment evaluation and decision making framework.
|
107 |
Att värdera en hamnutbyggnad : en översikt av ekonomiska verktyg samt en värdering av föroreningarLindblom, Niklas January 2008 (has links)
<p>När en kommersiell hamn byggs ut fordras omfattande muddringsarbete för att säkerställa ett brukligt djup för sjöfart. Då stora delar av muddermassorna ofta är förorenade av tungmetaller och miljögifter krävs särskilt omhändertagande av dessa. Traditionella omhändertagningsalternativ består av att deponera massorna på särskild avsedd plats på land eller tippa till havs, något som inte tillåts för förorenade sediment. En relativt ny metod är stabilisering/solidifiering (S/S) som innebär att muddermassorna behandlas med ett bindemedel för att sedan kunna användas som fyllnadsmaterial i exempelvis kajkonstruktioner. Dessa alternativ behöver noga vägas mot varandra med hänsyn till ekonomiska och miljömässiga aspekter. Föreliggande studie undersöker ventuella brister i de ekonomiska värderingar som genomförts inför utbyggandet av Oxelösunds hamn. Vidare genomförs en begränsad cost-benefit analys (CBA) för att värdera alternativen utifrån emissionsnivåer till luft och vatten. Resultatet visar att S/S innan nyttiggörande är det samhällsekonomiskt mest attraktiva alternativet.</p> / <p>When a commercial port is expanding its activities there is need for dredging to secure a safe depth for water borne traffic. The sediments are to a large extent contaminated by metals and toxins which calls for certain treatment. Traditionally sediments have either been disposed of at a specific location on land or dumped at sea; the latter is however not permitted by law. A relatively new method is stabilization/solidification (S/S) which means that the sediments are treated using a solidifying agent after which it is possible to use the dredged materials as filling in construction of jetties. These alternatives need to be carefully compared with respect to economical and environmental aspects. This thesis investigates the potential shortcomings of conducted economical evaluations prior to the expansion of Oxelösund port. Further, a limited cost-benefit analysis is conducted to evaluate the alternatives with respect to emissions of contaminants to air and water. The results show that S/S before utilization of the dredged materials is the most attractive alternative from an economical point of view.</p> / STABCON
|
108 |
A cost-effectiveness analysis of the first-line treatment regimens for multiple myeloma in Macao. / 澳門治療多發性骨髓瘤的第一線治療方案之成本效益分析 / Aomen zhi liao duo fa xing gu sui liu de di yi xian zhi liao fang an zhi cheng ben xiao yi fen xiJanuary 2009 (has links)
Kuok, Chiu Fai. / Thesis (M.Phil.)--Chinese University of Hong Kong, 2009. / Includes bibliographical references (leaves 139-154). / Abstract and appendix also in Chinese. / Abstract --- p.i / Abstract (in Chinese) --- p.iv / Acknowledgements --- p.vi / Table of Contents --- p.vii / List of Tables --- p.xi / List of Figures --- p.xiv / List of Abbreviations --- p.xv / Chapter Chapter 1 --- Introduction / Chapter 1.1 --- Introduction --- p.1 / Chapter 1.2 --- The Impact of Malignant Diseases and Multiple Myeloma --- p.4 / Chapter 1.3 --- Pharmacoeconomics --- p.6 / Chapter 1.4 --- Macao Healthcare System --- p.9 / Chapter 1.5 --- Study Hypothesis --- p.12 / Chapter 1.6 --- Study Objectives --- p.12 / Chapter 1.7 --- Perspective of the Study --- p.13 / Chapter Chapter 2 --- Literature Review / Chapter 2.1 --- Hematopoietic System --- p.14 / Chapter 2.1.1 --- Specific Blood Cell Lineages and Blood Cells --- p.15 / Chapter 2.1.2 --- Bone Marrow Microenvironment --- p.19 / Chapter 2.2 --- The Hematologic Malignancies --- p.20 / Chapter 2.2.1 --- Leukemia --- p.21 / Chapter 2.2.2 --- Lymphoma --- p.23 / Chapter 2.2.3 --- Plasma Cell Disorders --- p.24 / Chapter 2.3 --- Multiple Myeloma --- p.25 / Chapter 2.3.1 --- Epidemiology --- p.26 / Chapter 2.3.2 --- Pathology --- p.29 / Chapter 2.3.3 --- Clinical Presentation and Disease Complications --- p.31 / Chapter 2.3.4 --- Classification and Diagnostic Criteria --- p.35 / Chapter 2.3.5 --- Disease Staging and Prognosis --- p.42 / Chapter 2.3.6 --- Treatment --- p.45 / Chapter 2.3.6.1 --- Treatment Regimens and Strategies --- p.47 / Chapter 2.3.6.1.1 --- Standard Chemotherapy --- p.48 / Chapter 2.3.6.1.1.1 --- Melphalan-based Regimens --- p.51 / Chapter 2.3.6.1.1.2 --- VAD-based Regimens --- p.52 / Chapter 2.3.6.1.1.3 --- High-dose Glucocorticoid Regimens --- p.53 / Chapter 2.3.6.1.2 --- Treatment Strategies --- p.53 / Chapter 2.3.6.1.2.1 --- Initial Chemotherapy --- p.53 / Chapter 2.3.6.1.2.2 --- High-dose Chemotherapy --- p.55 / Chapter 2.3.6.1.2.3 --- Newer Therapeutic Agents for Multiple Myeloma --- p.58 / Chapter 2.3.6.1.2.4 --- Salvage Chemotherapy --- p.60 / Chapter 2.3.6.2 --- Treatment Responses --- p.63 / Chapter 2.3.6.3 --- Treatment for Disease Complications --- p.66 / Chapter Chapter 3 --- Methodology / Chapter 3.1 --- Study Design --- p.69 / Chapter 3.2 --- Patients Selection Criteria --- p.71 / Chapter 3.2.1 --- For Retrospective Cost Analysis --- p.71 / Chapter 3.2.2 --- For Health-related Quality of Life Measurement --- p.71 / Chapter 3.3 --- Patient Screening --- p.72 / Chapter 3.4 --- Data Collection --- p.72 / Chapter 3.5 --- Overview of Assessment Methods --- p.73 / Chapter 3.5.1 --- Outcomes --- p.73 / Chapter 3.5.2 --- Cost Analysis --- p.74 / Chapter 3.5.3 --- Cost Effectiveness Analysis --- p.74 / Chapter 3.5.4 --- Cost Utility Analysis --- p.75 / Chapter 3.5.5 --- Health-related Quality of Life Assessment --- p.75 / Chapter 3.6 --- Statistical Analysis --- p.76 / Chapter 3.7 --- Ethic approval --- p.77 / Chapter Chapter 4 --- Results / Chapter 4.1 --- Study Population --- p.78 / Chapter 4.1.1 --- Cost and Pharmacoeconomic Analysis --- p.78 / Chapter 4.1.2 --- Health-related Quality of Life Assessment --- p.79 / Chapter 4.2 --- Study Results --- p.81 / Chapter 4.2.1 --- Comparison of All Patients --- p.81 / Chapter 4.2.1.1 --- Differences in Treatment Protocols --- p.81 / Chapter 4.2.1.2 --- Differences in Treatment Responses --- p.82 / Chapter 4.2.1.3 --- Differences in Treatment Outcomes --- p.82 / Chapter 4.2.1.4 --- Differences in Treatment Costs --- p.84 / Chapter 4.2.2 --- Comparison for Patients Treated by Melphalan-based Regimens and VAD-based Regimens --- p.90 / Chapter 4.2.2.1 --- Differences in Treatment Responses --- p.90 / Chapter 4.2.2.2 --- Differences in Treatment Outcomes --- p.90 / Chapter 4.2.2.3 --- Differences in Treatment Costs --- p.93 / Chapter 4.2.3 --- Melphalan-based Regimens Versus VAD-based Regimens by Patients with Different DS Staging --- p.96 / Chapter 4.2.3.1 --- Patients in Stage 3-A MM --- p.96 / Chapter 4.2.3.2 --- Patients in Stage 3-B MM --- p.98 / Chapter 4.2.4 --- Melphalan-based Regimens versus VAD-based Regimens in Patients with Different IS Staging --- p.101 / Chapter 4.2.4.1 --- Patients in Stage I MM --- p.101 / Chapter 4.2.4.2 --- Patients in Stage II MM --- p.104 / Chapter 4.2.4.3 --- Patients in Stage III MM --- p.107 / Chapter 4.2.5 --- Comparison for Patients with and without Transplantation --- p.110 / Chapter 4.2.6 --- Cost-effectiveness Assessment --- p.117 / Chapter 4.2.7 --- Cost-utility Assessment --- p.118 / Chapter 4.2.8 --- Sensitivity Analysis --- p.119 / Chapter 4.2.9 --- Health-related Quality of Life Assessment --- p.120 / Chapter Chapter 5 --- Discussion and Conclusion / Chapter 5.1 --- Summary of Results --- p.123 / Chapter 5.2 --- Implication for Treatment --- p.126 / Chapter 5.3 --- Economic Evaluation --- p.129 / Chapter 5.4 --- Health-related Quality of Life --- p.132 / Chapter 5.5 --- Limitations of the Study --- p.134 / Chapter 5.6 --- Conclusion and Implications for Future Studies --- p.135 / Appendix --- p.137 / References --- p.139
|
109 |
Att värdera en hamnutbyggnad : en översikt av ekonomiska verktyg samt en värdering av föroreningarLindblom, Niklas January 2008 (has links)
När en kommersiell hamn byggs ut fordras omfattande muddringsarbete för att säkerställa ett brukligt djup för sjöfart. Då stora delar av muddermassorna ofta är förorenade av tungmetaller och miljögifter krävs särskilt omhändertagande av dessa. Traditionella omhändertagningsalternativ består av att deponera massorna på särskild avsedd plats på land eller tippa till havs, något som inte tillåts för förorenade sediment. En relativt ny metod är stabilisering/solidifiering (S/S) som innebär att muddermassorna behandlas med ett bindemedel för att sedan kunna användas som fyllnadsmaterial i exempelvis kajkonstruktioner. Dessa alternativ behöver noga vägas mot varandra med hänsyn till ekonomiska och miljömässiga aspekter. Föreliggande studie undersöker ventuella brister i de ekonomiska värderingar som genomförts inför utbyggandet av Oxelösunds hamn. Vidare genomförs en begränsad cost-benefit analys (CBA) för att värdera alternativen utifrån emissionsnivåer till luft och vatten. Resultatet visar att S/S innan nyttiggörande är det samhällsekonomiskt mest attraktiva alternativet. / When a commercial port is expanding its activities there is need for dredging to secure a safe depth for water borne traffic. The sediments are to a large extent contaminated by metals and toxins which calls for certain treatment. Traditionally sediments have either been disposed of at a specific location on land or dumped at sea; the latter is however not permitted by law. A relatively new method is stabilization/solidification (S/S) which means that the sediments are treated using a solidifying agent after which it is possible to use the dredged materials as filling in construction of jetties. These alternatives need to be carefully compared with respect to economical and environmental aspects. This thesis investigates the potential shortcomings of conducted economical evaluations prior to the expansion of Oxelösund port. Further, a limited cost-benefit analysis is conducted to evaluate the alternatives with respect to emissions of contaminants to air and water. The results show that S/S before utilization of the dredged materials is the most attractive alternative from an economical point of view. / STABCON
|
110 |
Comparative cost-benefit analysis of renewable energy resources for rural community development in Nigeria / A.A. OgunladeOgunlade, Abimbola Adegoke January 2008 (has links)
Rural development by means of providing uninterruptible power supply has become a priority among developing countries. Nigeria especially has on its top agenda the mandate to provide clean and cost-effective means of energy to the rural communities, hardest hit by wave of incessant outages of electricity supply. Renewable Energy (RE), a clean form of energy that can be derived from natural sources is widely available throughout Nigeria but is not harnessed.
In this dissertation a Cost-Benefit Analysis (CBA) framework is proposed for renewable energy towards rural community development in Nigeria as indicated in the 18-point recommendations of Energy Commission of Nigeria (ECN). Moreover, a cost-benefit analysis tool is formulated and developed from the CBA framework in order to analyze comparatively the costs and intangible benefits of renewable energy projects for rural application. A case study demonstrating the working methodology of the proposed framework is presented in order to establish the cost-benefit components by assessing the comparative cost-benefit analysis of RE at a rural site of Nigeria.
Erinjiyan Ekiti rural area is located for CBA assessment with three RE resources (solar, wind and small hydro) selected for consideration. Through the application of Contingent Valuation Method (CVM), the respondents' willingness to pay for RE supply is obtained and RE benefits in monetary terms computed. Using three economic decision criteria namely: Net Present Value (NPV), Benefit-Cost Ratio (BCR) and Internal Rate of Return (IRR); the three RE resources are ranked according to their economic viability.
The result of the analysis provides useful insight to investors and decision makers into how RE projects in rural community should be conducted. Foremost, it is revealed that all three RE options will be economically viable if implemented, though adequate caution must be taken when making a decision. Based on the CBA assessment, the Small-Hydro Power (SHP) option is ranked as the most viable option. However, this is swiftly negated if RE social impact, such as the spiritual belief of the rural dwellers, who rely on the only potential river as a medium of communication with their ancestors, are taken into consideration. Furthermore, a sensitivity assessment of the three RE options revealed that only solar photovoltaic (PV) option is marginally viable, thus turns negative upon an assumed increase in discount rate of only 17%.
Herein, the proposed CBA framework provides a useful insight into an efficient method of appraising RE projects in rural communities. A CBA simulation tool is formulated and adapted from the CBA framework to enable quicker, reliable and automated means of assessing RE projects with a view to making wise investment decision. / Thesis (M.Ing. (Development and Management Engineering))--North-West University, Potchefstroom Campus, 2009.
|
Page generated in 0.0757 seconds