• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 71
  • 26
  • 10
  • 9
  • 6
  • 4
  • 2
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 149
  • 149
  • 34
  • 31
  • 29
  • 21
  • 20
  • 18
  • 18
  • 18
  • 18
  • 16
  • 15
  • 15
  • 15
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

Development of an automated methodology for calibration of simplified air-side HVAC system models and estimation of potential savings from retrofit/commissioning measures

Baltazar Cervantes, Juan Carlos 25 April 2007 (has links)
This dissertation provides one methodology to determine potential energy savings of buildings with limited information. This methodology is based upon the simplified energy analysis procedure of HVAC systems and the control of the comfort conditions. Numerically, the algorithm is a tailored exhaustive search over all the independent variables that are commonly controlled for a specific type of HVAC system. The potential energy savings methodology has been applied in several buildings that have been retrofitted and/or commissioned previously. Results from the determined savings for the Zachry building at Texas A&M after being commissioned show a close agreement to the calculated potential energy savings (about 85%). Differences are mainly attributed to the use of simplified models. Due to the restriction of limited information about the building characteristics and operational control, the potential energy savings method requires the determination of parameters that characterize its thermal performance. Thus, a calibrated building is needed. A general procedure has been developed to carry out automated calibration of building energy use simulations. The methodology has been tested successfully on building simulations based on the simplified energy analysis procedure. The automated calibration is the minimization of the RMSE of the energy use over daily conditions. The minimization procedure is fulfilled with a non-canonical optimization algorithm, the Simulated Annealing, which mimics the Statistical Thermodynamic performance of the annealing process. That is to say, starting at a specified temperature the algorithm searches variable-space states that are steadier, while heuristically, by the Boltzmann distribution, the local minima is avoided. The process is repeated at a new lower temperature that is determined by a specific schedule until the global minimum is found. This methodology was applied to the most common air-handler units producing excellent results for ideal cases or for samples modified with a 1% white noise.
32

Modeling the rebound effect in two manufacturing industries

Safarzynska, Karolina 07 1900 (has links) (PDF)
The rebound effect refers to the phenomenon that energy savings from improvements in energy efficiency are lower than expected due to unintended second-order effects. Grasping specific mechanisms related to the rebound effect requires a good understanding of interactions between heterogonous agents on multiple markets. Otherwise, policies aimed at reducing energy use may render counter-expected and unforeseen consequences. In this paper, we propose a formal model, where technological change results from interactions on two markets: between consumers and producers in the market for final goods, and heterogeneous power plants in the electricity market. The analysis provides insights to the role of technological change, supply-demand coevolution, and status-driven consumption in explaining the rebound effect. The model is employed to compare effectiveness of economic policies aimed at reducing carbon emissions associated with production of consumer goods, namely: a tax on electricity and "nuclear obligations" to produce ten percent of electricity from nuclear energy. (author's abstract)
33

Freshwater on the island of Maui : system interactions, supply, and demand

Grubert, Emily 08 July 2011 (has links)
This work is part of a broader, multi-year investigation of Maui Island’s freshwater resources. Maui Island faces multiple resource constraints, including water, land, energy, and capital, and these resource constraints could become relevant over the next forty years. Not only does Maui face potential changes to its water and other systems due to external factors beyond its control, like anthropogenic and other climate changes, but Maui also could make developmental choices that will impact how its resource systems interact. In particular, this work looks at Maui’s freshwater systems as they relate to energy, waste, and environmental systems. This report provides a foundation for future scenario analysis on the island that will aim to characterize potential synergies and hazards of choices like increased food production, local fuel production, and increased use of renewable energies. / text
34

Potential savings when re-instating mine DSM projects / Ian Mulder.

Mulder, Ian January 2012 (has links)
The increasing electricity demand in South Africa has lead to a shortage in electricity supply. In response to this problem Eskom has introduced multiple capacity expansion programs. Unfortunately the electricity shortage is expected to continue until Eskom’s capacity expansion programs are completed. Demand Side Management (DSM) is widely accepted as an immediate solution to the high electricity demand of South Africa. Numerous DSM projects implemented by ESCo’s have been successful, but over the years have not been sustainable. Without regular maintenance from the relevant ESCo, many projects have failed to achieve sustainable savings. After the implementation of DSM projects, all installed equipment and software becomes the property of the client. Experience has illustrated that some mines did not always have the expertise or available resources to monitor and maintain the projects. As a result the electrical energy savings of the project would gradually deteriorate. A feasibility study was conducted to determine whether the re-instatement of redundant and debilitated mine DSM projects could be marketed as the “low hanging fruit” of the industry. A key driver for this study, was the fact that costs involved for re-instatement of such DSM projects are generally considerably lower than those of new projects, yet still producing lucrative electricity savings. Three major mining entities discussed in this dissertation have neglected to realise a collaborative cost saving of R 55,5 Million per annum. This loss of opportunity can mainly be attributed to a lack of maintenance and monitoring of operational DSM projects on their mining sites. Three DSM projects related to the water reticulation system of the mine were investigated. It was discerned in all three cases that the successful re-instatement of DSM projects are indeed possible, but only when subjected to continuous monitoring. The maintenance performed on two of the three projects, respectively realised approximately R2,7 Million and R 750 000. This was achieved through the process of load shifting, over a period of one year. Maintenance on the third project realised approximately R1,5 Million through energy efficiency over a three month period. This dissertation illustrates that attractive savings in electricity and cost can be realised when re-instating redundant DSM projects in the mining industry. It also demonstrates the cost and time effectiveness of implementing such projects, compared to the focus on new DSM installations. / Thesis (MIng (Mechanical Engineering))--North-West University, Potchefstroom Campus, 2013.
35

Potential savings when re-instating mine DSM projects / Ian Mulder.

Mulder, Ian January 2012 (has links)
The increasing electricity demand in South Africa has lead to a shortage in electricity supply. In response to this problem Eskom has introduced multiple capacity expansion programs. Unfortunately the electricity shortage is expected to continue until Eskom’s capacity expansion programs are completed. Demand Side Management (DSM) is widely accepted as an immediate solution to the high electricity demand of South Africa. Numerous DSM projects implemented by ESCo’s have been successful, but over the years have not been sustainable. Without regular maintenance from the relevant ESCo, many projects have failed to achieve sustainable savings. After the implementation of DSM projects, all installed equipment and software becomes the property of the client. Experience has illustrated that some mines did not always have the expertise or available resources to monitor and maintain the projects. As a result the electrical energy savings of the project would gradually deteriorate. A feasibility study was conducted to determine whether the re-instatement of redundant and debilitated mine DSM projects could be marketed as the “low hanging fruit” of the industry. A key driver for this study, was the fact that costs involved for re-instatement of such DSM projects are generally considerably lower than those of new projects, yet still producing lucrative electricity savings. Three major mining entities discussed in this dissertation have neglected to realise a collaborative cost saving of R 55,5 Million per annum. This loss of opportunity can mainly be attributed to a lack of maintenance and monitoring of operational DSM projects on their mining sites. Three DSM projects related to the water reticulation system of the mine were investigated. It was discerned in all three cases that the successful re-instatement of DSM projects are indeed possible, but only when subjected to continuous monitoring. The maintenance performed on two of the three projects, respectively realised approximately R2,7 Million and R 750 000. This was achieved through the process of load shifting, over a period of one year. Maintenance on the third project realised approximately R1,5 Million through energy efficiency over a three month period. This dissertation illustrates that attractive savings in electricity and cost can be realised when re-instating redundant DSM projects in the mining industry. It also demonstrates the cost and time effectiveness of implementing such projects, compared to the focus on new DSM installations. / Thesis (MIng (Mechanical Engineering))--North-West University, Potchefstroom Campus, 2013.
36

Energy efficiency opportunities in mine compressed air systems / F.W. Schroeder

Schroeder, Frederick William January 2009 (has links)
Demand Side Management (DSM) is one of the most viable and sustainable short term methods to address the shortfall in electricity generation in South Africa. This is because DSM projects can be implemented relatively quickly and inexpensively when compared with alternative generation options. This specifically applies to the mining industry. South African mines presently consume 15% of Eskom-generated electricity. Mine compressed air systems are some of the biggest users, consuming approximately 21% of mine electricity consumption. Electricity savings on compressed air systems are therefore important. With this study, various Energy Efficiency methods on compressed air systems were investigated. These methods include variable speed drives on compressor motors, temperature control of compressor discharge, minimising pressure drops in the air distribution systems, eliminating compressed air leaks, and optimising compressor selection and control. The most efficient strategies were identified, taking into account factors such as financial viability, sustainability, and ease of implementation. The best strategies were found to be the optimised control and selection of compressors, minimising compressed air leaks, and the optimal control of system pressure. These strategies were implemented and tested on large compressed air systems in gold and platinum mines. Savings of between 10% and 35% on the maximum demand of the systems were achieved. In present monetary terms this translates to as much as R108 million savings for the mines per year at the end of 2009 tariffs. If total mine compressed air electricity consumption can reduce by 30%, it will result in nearly a 1% reduction in total Eskom demand. This shows that mine compressed air savings can make a significant contribution to the drive for Energy Efficiency in South Africa. / Thesis (M.Ing. (Mechanical Engineering))--North-West University, Potchefstroom Campus, 2010.
37

Energy efficiency opportunities in mine compressed air systems / F.W. Schroeder

Schroeder, Frederick William January 2009 (has links)
Demand Side Management (DSM) is one of the most viable and sustainable short term methods to address the shortfall in electricity generation in South Africa. This is because DSM projects can be implemented relatively quickly and inexpensively when compared with alternative generation options. This specifically applies to the mining industry. South African mines presently consume 15% of Eskom-generated electricity. Mine compressed air systems are some of the biggest users, consuming approximately 21% of mine electricity consumption. Electricity savings on compressed air systems are therefore important. With this study, various Energy Efficiency methods on compressed air systems were investigated. These methods include variable speed drives on compressor motors, temperature control of compressor discharge, minimising pressure drops in the air distribution systems, eliminating compressed air leaks, and optimising compressor selection and control. The most efficient strategies were identified, taking into account factors such as financial viability, sustainability, and ease of implementation. The best strategies were found to be the optimised control and selection of compressors, minimising compressed air leaks, and the optimal control of system pressure. These strategies were implemented and tested on large compressed air systems in gold and platinum mines. Savings of between 10% and 35% on the maximum demand of the systems were achieved. In present monetary terms this translates to as much as R108 million savings for the mines per year at the end of 2009 tariffs. If total mine compressed air electricity consumption can reduce by 30%, it will result in nearly a 1% reduction in total Eskom demand. This shows that mine compressed air savings can make a significant contribution to the drive for Energy Efficiency in South Africa. / Thesis (M.Ing. (Mechanical Engineering))--North-West University, Potchefstroom Campus, 2010.
38

Numerical investigations of airflow and heat transfer in traditional Balinese buildings

Wijaya Kusuma, I. Gusti Bagus January 1999 (has links)
Traditional Balinese architecture is commonly related to culture and traditional reasoning. When subjected to several modem problems such as energy demand, pollution, and impact of urbanisation and tourism, traditional architecture becomes less attractive since the definitions behind traditional reasoning are not clear and can be interpreted in different ways. To understand this feature, the study of traditional Balinese architecture starts by using several key parameters such as wind engineering and heat transfer, as presented and used in several countries. The flow patterns around a cubic building have been studied by many researchers. The velocity profile at the model position and the local surface roughness are specific to each building model and cannot be estimated from general tests of a standard building shape, therefore specific velocity profiles and conditions are used in this particular study. The air flow around a cluster of traditional Balinese buildings is extremely complicated and difficult to determine by modelling an isolated building (via symmetric conditions) since the buildings are linked to each other. Full scale models of traditional buildings have been investigated by using CFD to predict the above aspects. Simulations using this method can be done more quickly and less expensively than with wind tunnel experiments, and are capable of delivering more detailed and comprehensive information about the flow structure. Two-dimensional models of traditional Balinese building arrangements are simulated by using a commercial code Fidap based on the finite element method to assess the effects of type of roof, fence and surface roughness. Three-dimensional models are simulated by using a commercial code CFX based on the finite volume method to verify some traditional definitions. A standard к-ε model is adopted because it needs less computational power and has achieved notable successes in calculating a wide variety of thin shear layer and recirculating flows without the need of adjustment of the model constants, but with the imposition of boundary conditions to reduce the over-prediction near windward edges. Adopting lower values of к and ε combined with multi-blocks is shown to reduce this over-estimation. For a cubic building, the results can be compared with several other turbulence models. It appears that traditional Balinese architecture has a strong and significant correlation with several engineering fields, therefore traditional communities can develop by considering the Tri Hita Karana concept in order to improve thermal comfort and reduce cooling loads, with corresponding energy savings.
39

Rule-based integrated building management systems

Clark, Gary George January 1993 (has links)
The introduction of building management systems in large buildings have improved the control of building services and provided energy savings. However, current building management systems are limited by the physical level of integration of the building's services and the lack of intelligence provided in the control algorithms. This thesis proposes a new approach to the design and operation of building management systems using rule-based artificial intelligence techniques. The main aim of is to manage the services in the building in a more co-ordinated and intelligent manner than is possible by conventional techniques. This approach also aims to reduce the operational cost of the building by automatically tuning the energy consumption in accordance with occupancy profile of the building. A rule-based design methodology is proposed for building management systems. The design adopts the integrated structure made possible by the introduction of a common communications network for building services. The 'intelligence' is coded in the form of rules in such a way that it is both independent of any specific building description and easy to facilitate subsequent modification and addition. This is achieved using an object-oriented approach and classifying the range of data available into defined classes. The rules are divided into two knowledge-bases which are concerned with the building's control and its facilities management respectively. A wide range of rule-based features are proposed to operate on this data structure and are classified in terms of the data classes on which they operate. The concepts presented in this thesis were evaluated using software simulations, mathematical analysis and some hardware implementation. The conclusions of this work are that a rule-based building management system could provide significant enhancements over existing systems in terms of energy savings and improvements for both the building's management staff and its occupants.
40

A pragmatic value-driven approach to design with applications to energy-conscious buildings

Lee, Benjamin David 12 January 2015 (has links)
Within the design community, a growing number of researchers have shown interest in extending the value context to include design, such that designers focus on maximizing the 'value' of the product or service, rather than simply satisfying a set of requirements. Thus, by applying a value-driven approach to design, the design community hopes to show that the magnitude of cost and schedule overruns may be reduced, or even eliminated. However, a common criticism of value-driven approaches is that they are difficult to implement, and not sufficiently pragmatic to be used for large scale engineering problems. Further, some argue that less rigorous methods appear to provide reasonable results in practice, and so rigor is not necessary. To reconcile these disparate viewpoints, it must be shown that value-driven approaches contribute to the design process, and can be implemented in practice at a reasonable cost. In response, I propose that the cause for the lack of practicality in value-driven approaches is attributable to the lack of well established and verified methods and tools. This dissertation presents research that attempts to address this deficiency by first developing a better understanding of effectiveness for methods that seek to enable value-driven design. This investigation leads to a concise set of desired characteristics for methods for guiding the development of value-models which then motivate the creation of a Systematic Method for Developing Value Models (SMDVM). To evaluate the SMDVM, it is applied to the design and retrofit of buildings for energy efficiency. A simulation workbench is developed as a tool to automate the development and analysis of value models for building design and retrofit contexts. The workbench enables architects, engineers, and other practitioners to easily incorporate uncertainty into analyses of building energy consumption, as part of a value-driven approach to design and retrofit.