• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 3
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

A influência da modernização do sistema de controle de trens no consumo de energia no metrô de São Paulo / The influence of the train control system modernization on the consumption of energy São Paulo metro

Gomes, Francisco Moraes 23 June 2017 (has links)
Submitted by Nadir Basilio (nadirsb@uninove.br) on 2018-08-09T18:45:01Z No. of bitstreams: 1 Francisco Moraes Gomes.pdf: 3240990 bytes, checksum: 17659c72fed5b3faf44d712b20b24e39 (MD5) / Made available in DSpace on 2018-08-09T18:45:02Z (GMT). No. of bitstreams: 1 Francisco Moraes Gomes.pdf: 3240990 bytes, checksum: 17659c72fed5b3faf44d712b20b24e39 (MD5) Previous issue date: 2017-06-23 / The aim of this research is to study the potential association between the reduction in electricity consumption in Line 2 – Green of the São Paulo Subway and the change of the Train Control System from the "fixed block" type to the "moving block" type. This study is necessary because the transport sector is one of the biggest consumers of energy and the energy is one of the highest costs of the metro system, so that any reduction must be studied and understood. Most of the previous studies published on energy efficiency at subways and trains are simulation studies, there is a few literature based on empirical data. The statistical approach was chosen because there is no installed equipment to directly measure this influence, since there are only measures of consumption at the entrances of the System and there is no individual measurement of each train. Part of the data used was obtained via official communication channels of the company, another part was obtained directly from the operational reports and other data was extracted from the capture of the communications between the trains and centralized control system. Several variables that can influence the consumption of the line and also the train speed profiles in the periods just before and after the System change have been verified. The study of the relationships among these variables was done and the multivariate regression analysis was performed. The results of the regression generated an equation model with significance for the variables: type of system, proportion of useof the fleets used and the number of trips made. In the regression process, the stepwise method was used and some variables were withdrawn when verifying that they had multicollinearity. The data extracted from the communication protocol were not used in the regression, but they did allow verifying an evidence of improvement in the speed profiles and also a reduction in the number of stops that the train made in the route, indicating a smaller interference between the train movements with the new system. The calculated savings obtained by the new system was around 2.8%, rising to about 7.8% on average when the new fleet was included, which only uses the "moving block" system. / Esta pesquisa tem por objetivo estudar a potencial associação da ocorrência de queda no consumo de energia elétrica na Linha 2-Verde do Metrô de São Paulo com a troca do Sistema de Controle dos Trens do tipo “bloco fixo” para o tipo “bloco móvel”. Este estudo se mostra necessário, pois o setor de transporte é um dos maiores consumidores de energia e a energia é um dos maiores custos do sistema metroviário, de forma que qualquer redução deve ser estudada e compreendida. A maioria dos estudos anteriores publicados sobre eficiência energética em metrôs e trens são estudos de simulação, havendo pouca literatura baseada em dados empíricos. A abordagem estatística foi escolhida porque não há equipamentos instalados para se medir diretamente essa influência, pois apenas há medida de consumo somente na entrada de energia do Sistema, e não medição individual de cada trem. Parte dos dados utilizados foi obtida via canais oficias de comunicação da companhia, outra parte foi obtida diretamente dos relatórios operacionais e outros dados foram extraídos da captura das comunicações entre os trens e sistema de controle centralizado. Foram verificadas diversas variáveis que podem influir no consumo da linha e também os perfis de velocidades dos trens nos períodos imediatamente anteriores e posteriores a troca do Sistema. Foi realizado o estudo das relações entre essas variáveis e feita análise por regressão multivariada. Os resultados da regressão geraram um modelo de equação com significância para as variáveis: tipo de sistema, proporção de uso uma das frotas e a quantidade de viagens realizadas. No processo de regressão foi usado o método stepwise e algumas variáveis foram retiradas ao verificar que apresentavam multicolinearidade. Os dados extraídos do protocolo de comunicação não foram usados na regressão, mas por meio deles foi possível verificar indícios de melhoria nos perfis de velocidade e também uma redução na quantidade de paradas que o trem realizava no percurso, indicando uma menor interferência entre as movimentações dos trens com o novo sistema. A economia calculada obtida pelo novo sistema ficou em torno de 2,8%, subindo para cerca de 7,8% em média ao se incluir a nova frota, a qual só utiliza o sistema de "bloco móvel".
2

Simulation Methods for Mixed Legacy-Autonomous Mainline Train Operations

Morey, Emily J., Wilson, R. Eddie, Galvin, Kevin 22 June 2023 (has links)
We introduce and demonstrate a simple and efficient method for simulating mixtures of legacy and autonomous trains. The method generalises an earlier simulation that we developed for legacy-only operations, in which trains run according to fixed-block signalling rules. Autonomous trains, which use moving-block signalling rules, are incorporated into this framework by employing an overlapping set of short virtual fixed-blocks. Safe occupancy is then maintained by using shadowing rules that link the two sets of blocks. The paper gives relevant rail background, details of the proposed simulation rules, and demonstrates exemplar solution trajectories. The simulation technique is validated both in terms of maintaining safe occupancy and providing a close approximation of the true continuous-space dynamics of autonomous leader-follower pairs. At the Dresden meeting, a variety of interesting mixed-fleet capacity results will also be presented.
3

Roslagsbanan: A capacity comparison between the current ATC system and the implementation of a CBTC system

Sofroniou, Chrysostomos January 2021 (has links)
Communications-based train control (CBTC) aims to improve headways in the railway systems while maintaining or even improving safety. By means of the CBTC systems, the exact position of a train is known more accurately than the traditional signalling systems. It is a continuous, automatic train control system utilizing high-resolution train location determination, independent from track circuits. The system makes use of the telecommunications between the train and track equipment for the traffic management and infrastructure control. Roslagsbanan is a narrow gauge urban railway system that connects Stockholm with the northern suburbs of the city and despite its age and limited capacity, it is one of the most used railways in Sweden. From the beginning, the entire track consisted of single-tracks where the trains had to wait for each other on special meeting tracks. Αn expansion plan is now underway and the authorities are building approximately 22 km of double-track where the trains will be able to meet. All work along the Roslagsbanan aims to increase capacity, safety and accessibility. With more double-tracks and an updated signal system, the risk of traffic disruptions will be reduced and it is possible to have more frequent traffic in the future. This master’s thesis investigates a CBTC implementation in Roslagsbanan according to the current expansion plan and comparisons are conducted between the current capacity of the ATC system. A simulation model is developed that calculates the train’s safe braking curve and safe braking distance and two case studies are examined. The first one: Calculation of the capacity of the train routes and examination a capacity increase by a minimum 20% during rush hour, taking into consideration the current expansion plan in double-tracks. The second one: Calculation of the capacity of the train routes considering double-tracks the entire route. In this way, differences could be seen between the traffic density with single and double-tracks. Several insights were gained during the realization of this project and as well as timetables have been created to visualize the findings of this thesis. The timetable’s regularity time is decreased to a significant degree and more frequent traffic can be accommodated. Furthermore, the capacity is definitely affected by the track/infrastructure design however, it is questionable whether this increase in capacity outweighs the economic factor of expanding the entire route to double-tracks. / Kommunikationsbaserad tågkontroll (CBTC) syftar till att förbättra framsteg i järnvägssystemen samtidigt som säkerheten bibehålls eller till och med förbättras. Med hjälp av CBTC-systemen är ett tågs exakta position känd mer exakt än de traditionella signalsystemen. Det är ett kontinuerligt, automatiskt tågkontrollsystem som använder högupplöst tåglägesbestämning, oberoende av spårledning. Systemet använder telekommunikation mellan tåg och spårutrustning för trafikledning och infrastrukturkontroll. Roslagsbanan är ett smalspårigt stadsjärnvägssystem som förbinder Stockholm med stadens norra förorter och trots sin ålder och begränsade kapacitet är det en av de mest använda järnvägarna i Sverige. Från början bestod hela spåret av enkelspår där tågen fick vänta på varandra på speciella mötesstationer. Ett utvecklingsprogram pågår nu och myndigheterna bygger cirka 22 km dubbelspår där tågen kommer att kunna mötas. Allt arbete längs Roslagsbanan syftar till att öka kapacitet, säkerhet och tillgänglighet. Med fler dubbelspår och ett uppdaterat signalsystem minskar risken för trafikstörningar och det är möjligt att ha mer frekvent trafik i framtiden. Detta examensarbete undersöker ett CBTC-genomförande i Roslagsbanan enligt den nuvarande expansionsplanen och jämförelser görs med ATC-systemets nuvarande kapacitet. En simuleringsmodell har utvecklats som beräknar tågets säkra bromskurva och säkra bromssträcka och två fallstudier undersöks. Den första: Beräkning av tåglinjernas kapacitet och undersökning av en kapacitetsökning med minst 20% under rusningstid med hänsyn till den nuvarande expansionsplanen i dubbelspår. Den andra: Beräkning av tåglinjernas kapacitet med tanke på dubbelspår hela rutten. På detta sätt kunde skillnader ses mellan trafiktätheten med enkel- och dubbelspår. Flera insikter gjordes under genomförandet av detta projekt och tidtabeller har skapats för att visualisera resultaten av denna avhandling. Tiden mellan tågen minskas i betydande grad och mer frekvent trafik kan tillgodoses. Dessutom påverkas kapaciteten definitivt av ban-/infrastrukturutformningen, men det är tveksamt om denna kapacitetsökning uppväger den ekonomiska faktorn att utöka hela rutten till dubbelspår.

Page generated in 0.0529 seconds