• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • Tagged with
  • 3
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Utveckling av mobilapplikation för visualisering av vattenströmmar / Development of a mobile application for visualisation of watercurrents

Rönnbäck, Viktor, Lagnöhed, Felix, Picetti, Anton, Broborg, Simon, Harju, Dag, Brynielsson, Emil, Örnås, Marcus, Reinisch, Emilia January 2022 (has links)
Denna rapport behandlar utveckling av en mobilapplikation för att mäta flöde i ett vattendrag på uppdrag av företaget SeaPattern. Rapporten inkluderar en gemensam del och åtta individuella delar. Den gemensamma delen beskriver arbetet som bedrevs under våren 2022 och gjordes som en del av kursen Kandidatprojekt i programvaruutveckling, TDDD96,vid Linköpings universitet. Målet med projektet var att utveckla en mobilapplikation föratt med enkelhet kunna beräkna flödet i ett vattendrag. Applikationen ger användarenmöjlighet att ladda upp ett videoklipp på ett vattendrag, för att sedan få tillbaka flödesberäkningen representerat med ett vektorfält eller värmekarta.
2

Dagvattenundersökning på Falu Återvinning / Stormwater Investigation at Falu Återvinning

Bors, Peter January 2012 (has links)
År 2011 asfalterade Falu Återvinning 5 500 m2 för att användas till rötslamkompostering. I samband med detta gav Länsstyrelsen i Dalarnas Län ett utredningsvillkor. Utredningsvillkoret går ut på att Falu Återvinning ska undersöka vad det förorenade dagvattnet innehåller och i vilka mängder, hur stora dagvattenflödena är, vilken påverkan på omgivningen dagvattnet har samt att förslag ges till lämpligt omhändertagande av dagvatten. I dagsläget går majoriteten av dagvattnet till en lakvattendamm och resterande går till Stångtjärnsbäcken, ett vattendrag som är fiskförande. Denna rapport ska fungera som underlag till en framtida utökning av Egenkontrollprogrammet för Vatten på Falu Återvinning med avseende på dagvatten. Egenkontroll innebär att verksamheter som kan medföra olägenheter för människors och miljöns hälsa är skyldiga att kontrollera verksamhetens påverkan. Syftet med examensarbetet var att planera och genomföra provtagning samt utvärdera analysresultat av dagvatten på Falu Återvinning. Erhållna analysresultat skulle ligga till grund för val av dagvattenhantering. Inför provtagningen undersöktes provtagningsmetoder och analysomfång. Provtagningsmetoderna inkluderade stickprov, blandprov och passiva provtagare. För- och nackdelar samt rådande förhållanden på anläggningen låg till grund för val av metod. Analysomfång valdes så att närsalter, tungmetaller, organiska summametoder och ett antal miljögifter undersöktes. Vilka miljögifter som skulle analyseras valdes utifrån avfallet som behandlas på Falu Återvinning. De erhållna analysresultaten utvärderades och låg till grund för rekommendation av dagvattenhantering. Då en ekonomisk lösning av dagvattenrening önskades undersöktes enkla och/eller naturliga reningsmetoder som inte kräver avancerad teknologi och är billiga i drift. Metoder som undersöktes var dagvattendammar, översilningsytor, avsättningsmagasin och alternativet att skicka dagvatten till Främby Avloppsreningsverk. Dagvattnet från Falu Återvinning visades innehålla framförallt höga halter av närsalter, zink och organiskt material. Provtagningspunkten DV5 visade indikationer på att framträngande grundvatten eventuellt kan ha förorenats av lakvatten från en intilliggande deponi. Detta på grund av väldigt höga halter av organiskt material, alkalinitet, klorid och ammoniumkväve. Framförallt de höga halterna av klorid och ammoniumkväve antydde att grundvattnet i området kunde ha förorenats av lakvatten. Dagvattnet i provtagningspunkten DV1 visade förhöjda halter av kadmium, koppar, zink och organiskt material. Den högsta halten av sulfat observerades i denna punkt, dock låg halten under riktvärdet för sulfat i dricksvatten. Även halter av PCB kunde detekteras i DV1. DV3 hade höga halter av bly, organiskt material och närsalter, men vattnet i denna punkt går i dagsläget till en lakvattendamm. DV4 hade väldigt varierande sammansättning, men visade förhöjda halter av organiskt material, kväve och koppar. Dagvattnet i DV1 och DV4 bör inte släppas ut i Stångtjärnsbäcken. Bästa hanteringsmetoden för dagvatten på Falu Återvinning förefaller vara anläggandet av en dagvattendamm alternativt att dagvattnet skickas till Främby Avloppsreningsverk. / In 2011, Falu Återvinning laid out 5 500 m2 of new tarmac to be used as storage space, mostly for digested sludge composting. In a correlation with this the County Administrative Board of Dalarna gave an investigation condition. This condition meant that the storm water at Falu Återvinning was to be examined in regards of pollution concentrations, masses, flows and possible environmental impact on the surroundings. The condition also meant that an appropriate treatment of the storm water was to be suggested. Today, the majority of the storm water is lead to an existing leachate pond while the remaining storm water goes to the Stångtjärnsbäck, which is a stream with a certain protection value since it contains fish. This report will serve as a basis for future expansion of the Self-monitoring program for Water at Falu Återvinning in regards of storm water. Self-monitoring means that businesses that can cause harm to human and/or environmental health have an obligation to monitor this impact. The purpose of the thesis project was to plan and carry out a sample-taking of the storm water at Falu Återvinning, and evaluate the results of the analyzes. These results were to be used as the basis of choosing appropriate treatment of the storm water. Prior to sampling, different sampling methods and the extent of the analyze were investigated. The sampling methods included grab and composite samples as well as passive sampling devices. The advantages and disadvantages of the different sampling methods as well as the conditions at Falu Återvinning formed the basis for the choice of method. The extent of the analyzes were chosen so that this included nutrient salts, heavy metals, organic parameters and a number of environmental pollutants. Which environmental pollutants were to be examined was chosen by consideration to the waste that is treated at Falu Återvinning. The acquired results were evaluated and used as a base for the recommendation of appropriate treatment of storm water at Falu Återvinning. An economical solution was desired so simple and/or natural treatment processes were investigated, since these are cheaper to run and requires less advanced technology. Processes that were investigated were storm water ponds, grassed areas, detention basins and the possibility to send the storm water to the local wastewater treatment facility, Främby Avloppsreningsverk. The investigated storm water at Falu Återvinning showed high concentrations of foremost nutrient salts, zinc and organic material. The sampling point of DV5 indicated that penetrated ground water may have been polluted by leachate from a nearby landfill. This is due to very high concentrations of organic material, alkalinity, chloride and ammonia nitrogen. Especially the very high concentrations of ammonia nitrogen and chloride indicated a pollution of leachate. The storm water in the sampling point DV1 showed elevated concentrations of cadmium, copper, zinc and organic materials. The highest concentrations of sulfate were found in this sampling point, although these values were lower than the guideline value of sulfate in drinking water. Concentrations of PCB were detected in DV1. DV3 contained high concentrations of lead, organic materials and nutrient salts, but the storm water in this point is collected and sent to the leachate pond. The composition of DV4 was the most varying out of all the sampling points, but showed high concentrations of organic materials, nitrogen and copper. The stormwater in sampling points DV1 and DV4 should not be lead to the Stångtjärnsbäck. The best treatment options for the storm water at Falu Återvinning would either be a storm water pond or the ability to send the water to the wastewater treatment facility Främby Avloppsreningsverk.
3

Beräkning av pumpkapacitet samt konstruktion av pumpfundament / Calculation of pump capacity and construction of a pump foundation

Beijer, Anton, Lindholm, Magnus January 2013 (has links)
Ett undersöknings- och utvecklingsarbete för att lösa ett problem med att dränkbara pumpar i ett vattenavrinningssystem gick sönder med perioder på två år i genomsnitt, utfördes i samarbete med Cementa AB i Skövde. Orsak till pumpars haveri söktes och fanns vara bristande rutiner och kunskap om det underhåll pumparna krävde. För att lösa detta problem utvecklades riktlinjer för nyinköp av torruppställda pumpar för att möjliggöra kontinuerligt underhåll. Då möjligheter för placering av torruppställd pump saknades utvecklades ett pumpfundament för placering av torruppställd pump. Krav för utvecklingsarbetet togs fram i samarbete med Cementas underhållsavdelning och teoretisk dimensionering av dränkbara länspumpars dåvarande volymflödeskapacitet utfördes. Krav utvärderades och viktades med hjälp av parvis jämförelse. Dimensionering och kontroll av hållfasthet för utvecklat pumpfundamentet utfördes med hjälp av Finita Element Analyser i programvaran Pro/Engineer Creo 1.0 Mechanica. Kontroll av hållfasthet i infästning av pumpfundamentet samt svetsfogar utfördes analytiskt. Arbetet resulterade i en rekommendation till Cementa AB i Skövde att ta in offerter på nya torruppställda pumpar med hjälp av utvecklade riktlinjer och att tillverka det pumpfundament som tagits fram inom ramen för examensarbetet, för att placera nya pumpar på. Att noggrant följa de underhållsinstruktioner som pumpar har och att underlätta för personal att utföra detta underhåll ansågs kunna bidra till att pumpar skulle få en längre och mer ekonomisk livslängd. / A development project to solve problems with why submersible pumps in a run-off system broke down with periods of two years, on average, was performed in collaboration with Cementa AB in Skövde. Reason for the pumps breakdowns was searched and found to be inadequate procedures and missing knowledge of the maintenance required on the pumps. To solve this problem, guidelines for the purchase of new dry pit pumps were developed to allow for continuous maintenance. As the possibilities of placing a dry well pump did not exist at Cementa, a pump foundation was developed. Requirements for the development work were produced in cooperation with Cementas maintenance department and theoretical dimensioning of the submersible bilge pumps volume flow capacity was performed. Requirements were evaluated and weighted using Pairwise comparison. The design and control of the strength of the developed pump foundation was performed using finite element analysis in the software Pro/Engineer Creo 1.0 Mechanica. Controls of the strength of the attachment of the pump foundation and welds were performed analytically. The work resulted in a recommendation to Cementa AB in Skövde to bring in quotes on the new dry-pit pumps using the developed guidelines and to manufacture the pump foundation developed within the framework of the thesis. Cementa was also recommended to carefully follow the maintenance instructions for pumps and make it easier for staff to perform this maintenance. This was recommended to ensure that new pumps would have a longer and more economical lifetime.

Page generated in 0.0557 seconds