• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Hur anser elever att man uppnår en bra matematikundervisning i skolan.

Jonsson, Rebecca January 2010 (has links)
AbstractThe purpose of this study has been to find out what attitude fifth graders have towards mathematics. This is done to get a better understanding of student’s feelings regarding about mathematics and what it is that makes mathematics fun or boring. My questions have been: What do the students think is fun, boring and difficult about mathematics? How do students think that a good mathematics teacher should be? Do the students see a difference in the mathematics teaching in easy compulsory school years?To find answers to my questions I have looked into prior research on students attitudes towards mathematics. I have also conducted group interviews with ten year old students.I was quite surprised to see what the attitudes of the students towards mathematics. I thought that it would be more students that thought that mathematics was a boring subject, but this was not the case. There are different factors that influence the student’s attitude towards mathematics. The factors that influenced the students positively were varied teaching, a committed teacher and peer-peer work.Things that can influence the students negatively are no variation in work, to hard problems to solve and exclusively working in their textbooks. Also the current emotional state of the students may influence their attitude towards mathematics, both positive and negative.Four key phrases:Student’s attitude towards mathematicsVaried teachingThe teacher’s role in teachingJoint work
2

Hantering av gemensamt arbete vid stängning av plankorsning

Johansson, Malin, Sjöström, Therese January 2020 (has links)
Joint work is a measure of reallotment that guarantees that an important facility is carried out. The measure is applied predominantly in regulations relating to the closure of level crossings in order to ensure the construction of replacement roads for exits to public roads, or the reconstruction of individual roads. The Swedish mapping, cadastral and land registration authority provides legal manuals to support cadastral surveyors in their conducts. Land surveying operations that are affected by the joint work measure can be found in chapter 9 in manual for the property law. The purpose of the study was to map the working methodology for the management process of reallotment with decisions regarding joint work. The manual lacks national guidelines for handling these cases, which means that the knowledge is today transmitted through oral tradition. This means that cases with decisions regarding joint work are handled differently in Sweden. The aim for the study is to answer the specific questions by presenting what the handling looks like today and in the long term promote the cadastral surveyor’s handling of the process. To answer the study's questions, interviews and examination of land surveying dossiers were conducted. The respondents were made up of land negotiators from the Swedish Transport Agency and cadastral surveyors at the State Cadastral Authority, which works with the issue. The study's results illustrate a wide variety of perspectives and management of joint work. The most prominent was the ambiguity about how the decision should be designed, the interpretation of chapter 9 in the manual but mainly lack of clear guidelines for handling. It was found after the study was completed that national guidelines for the management process need to be established. Clarification of the extent of decision is required, as well as a stricter application of the property law. In addition, a more continuous monitoring by the State Cadastral Authority and the custodian of the construction work contributes to a more efficient process. / Gemensamt arbete är en åtgärd inom fastighetsreglering som garanterar att en viktig anläggning blir utförd. Åtgärden tillämpas övervägande i regleringar som avser stängning av plankorsningar för att tillförsäkra byggnation av ersättningsvägar för utfart till allmän väg, alternativt ombyggnation av enskilda vägar. Lantmäteriet tillhandahåller juridiska handböcker till stöd för FLM i deras handläggning. Lantmäteriförrättningar som berörs av åtgärden gemensamt arbete återfinns i 9 kap. handbok FBL. Syftet med studien var att kartlägga arbetsmetodiken för handläggningsprocessen av fastighetsregleringar med beslut om gemensamt arbete. Handboken saknar nationella riktlinjer för handläggning av dessa ärenden vilket innebär att kunskapen idag överförs via muntlig tradition. Det medför att ärenden med beslut om gemensamt arbete hanteras olika runt om i Sverige. Målet med studien är att besvara specifika frågeställningar genom att framställa hur hanteringen ser ut idag samt att på sikt främja FLM:s handläggning av processen. För att besvara studiens frågeställningar genomfördes intervjuer och granskning av förrättningsakter. Respondenterna utgjordes av markförhandlare från Trafikverket och FLM vid statliga lantmäterimyndigheten som arbetar med frågan. Studiens resultat åskådliggör en stor variation av perspektiven och hanteringen av gemensamt arbete. Det mest framträdande var oklarheter kring hur beslutet ska utformas, tolkningen av 9 kap. i handboken men främst avsaknad på tydliga riktlinjer för handläggningen. Det kunde konstateras efter studiens genomförande att det behöver fastställas nationella riktlinjer för handläggningsprocessen. Det krävs ett tydliggörande av beslutets omfattning samt en striktare tillämpning av FBL:s bestämmelser. Dessutom bidrar en mer kontinuerlig övervakning från lantmäterimyndigheten och sysslomannen av anläggningsarbetet till en effektivare process.

Page generated in 0.0572 seconds