• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 245
  • Tagged with
  • 245
  • 193
  • 178
  • 177
  • 172
  • 171
  • 169
  • 164
  • 161
  • 161
  • 149
  • 147
  • 144
  • 143
  • 141
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
211

Hanácký statek - stavebně technologický projekt / Hanacky estate - construction and technological project

Troubilová, Hana January 2012 (has links)
In this diploma thesis is designed replica Hanacky estate from the 19th century. The whole structure includes not only a replica of the estate but also including the reconstruction of a barn or shelter. Hanacky estate will be part of Zoopark Vyškov and will serve as an environmental education center. Thesis I deal with a construction technological project. I focus here on the transport links, building-site cell site equipment, calculation of water and electricity, design tools and machinery, calculation, budget and schedule, the use of machines and workers, limitky. I deal with the technological regulations innovative technology. Furthermore, it is the control and test plans, security, ecology, design contract for work. In the last part of my thesis I deal with natural building materials.
212

Příprava realizace Vysokoškolských kolejí VUT v Brně / Preparation of realization of University dormitory BUT

Götz, Libor Unknown Date (has links)
The aim of this diploma thesis is to prepare the realization of college dormitories for the Brno University of Technology. A technical docummentation for the construction-technological project, transport routes design, time and financial schedule, budget according to technical – economic indicators, main technological stages implementation study, construction project, main construction machines proposal, time plan, and an item budget of the main construction object is prepared. An integral part of this thesis are the technological regulations, including control and test plans. And at the end the LEED certification and the health and safety plan were prepared.
213

Příprava realizace výrobní haly Tescan / Preparation of realization of production hall Tescan

Hlávka, Jan Unknown Date (has links)
The topic of this diploma thesis is the preparation of the realization of the production hall of the company Tescan. The thesis contains a technical report on the construction technology project, the coordination situation, the time and financial plan of the construction. Furthermore, the project addresses the design of construction site equipment and machinery for each stage, the schedule of the main building, the plan of its supply of materials for the rough construction and technological regulations for the substructure of the building, to which the inspection and test plan applies. The next assignment deals with the budget of the main building, health and safety plan and the issue of formwork needed for implementation. The specialization in the area deals with the design and assessment of industrial floors and solutions for securing a construction pit.
214

Příprava realizace Rezidence Bučovických teras / Preparation for the implementation of the Bučovice Terrace Residence

Loukota, Michal Unknown Date (has links)
The subject of the diploma thesis is the implementation of apartment buildings in Bučovice, specifically focusing on the apartment building "X". It deals with a construction technology project. Its content is a technical report on the construction technology project, traffic relations for the transport of materials and machines to the construction site, technical report on the construction site equipment, construction technology study, machine design, elaboration of technological regulation for monolithic ceiling construction and infiltration tank. The chapters on safety and health protection at work on the construction site, the LEED certification system and a noise study for earthworks are also elaborated. Several diagrams of the procedure of execution of individual constructions, time and financial plan, selected details are elaborated. The thesis contains 30 appendices.
215

Bytový komplex Kadetka, příprava realizace stavby / Apartment Complex Kadetka, Preparation for Building Realisation

Páleník, Tomáš Unknown Date (has links)
The subject of the diploma thesis is to elaborate a selected part of the construction technology project for Apartment complex Kadetka - preparation for building realisation. Specifically, this is an underground garage and object C. In the course of the creation of project, the objects A and B, incorporated in the project of the construction site equipment, were also taken into account. The content of the work is a technical report to the construction technology project, evaluation of transport routes, time and financial plan, individual realization phases of the main building phase, design of the main building machine and mechanisms, time schedule for rough construction, plan for securing material resources, elaboration of technology regulations for underground monolithic reinforced concrete structures and check and test plan. The thesis also includes an item budget for the apartment house made with Build Power S software.
216

Realizace bytového domu v Brně - stavebně technologický projekt / Implementation of Apartment House in Brno - Building Contruction Project

Pospíšil, Dominik Unknown Date (has links)
Theme of the diploma thesis is technical report of the technological project for apartment building Hroznatova – Brno - Zidenice, which will be realized on Hroznatova street. For object I prepare technical report of the technological project, studies of realization main technological phases, solution of wider transport relations, objects time and financial plan, time schedule, project for site facilities with drawing of four main technological phases, design of the main construction machines and mechanisms, technological specification for realization of horizontal monolithic reinforced concrete ceiling construction, health and safety solutions for the solved construction, where I evaluate concreting ceilings, balance of workers and main machines, inspection and test plan for constructions from technological specification. As other assignment I make a itemized budget for Etics and ceiling construction, calculation according to THU and comparative truck crane with tower crane.
217

Příprava realizace administrativních objektů Palmovka Park / Preparation for the implementation of administrative buildings Palmovka Park

Boucník, Jan January 2018 (has links)
The diploma thesis deals with the preparation of the construction of Palmovka Open Park III administrative building. It contains a technological regulation for drilled piles, technological regulation for reinforced concrete monolithic constructions, broader transport routes, study of the implementation of the main technological stages, design of building machines and mechanisms, control and testing plan for drilling piles and reinforced concrete constructions, risk and measures, time and financial plan, calculation according to THU, drawing of site equipment, cycle, timetable, item budget, selected technological details.
218

Skladovací hala PFM Flexi - stavebně technologický projekt / PFM Flexi storage hall - construction technology project

Chroustovský, David January 2018 (has links)
The aim of this diploma thesis is the design of an effective construction-technological project for the construction of reinforced concrete prefabricated storage halls by PFM-Flexi, s.r.o. The solution of the chosen problem is the design of the building site equipment, the verification of the transport routes of the key materials, the assembly schemes, the technological regulation and the control and test plan for the precast reinforced concrete frame, the BOZP plan, the comparison of the two versions of the installation in financial terms, the budget item and the schedule of the main building, timetable, calculation timetable and environmental aspects of the construction.
219

Administrativní budova Lomnického - stavebně technologická příprava stavby / Administrative building Lomnického - Building technology preparation of construction

Hanzlík, Vlastimil January 2019 (has links)
This diploma thesis focuses on the construction and technological preparation of the office building in the Lomnického street. The aim of this work is to choose the appropriate construction process. The thesis contains a technical report of a construction and technological project, solutions of wider transport relations, time and financial object plan, itemized budget, design of a site equipment, design of the main building machines and mechanisms, time schedule, technological regulation, inspection and test plan, calculation of two options of the excavation of building pit and details to waterproofing of the substructure. In detail, the thesis is dedicated to secure the building pit enclosed by diaphragm walls.
220

Příprava a realizace výrobní haly v Holešově / Implementation of Production Hall in Holešov

Ševela, Ondřej January 2019 (has links)
The diploma work has been dealing with the building and technological design of a production hall in Holešov. The work includes the general and specification report, the study of main technological phases, the site plan, the technological specification solving the transportation relations and coordination of oversize transportation, time and financial schedule of the construction, material supply plan including staff review, the time schedule for pre-cast frame assembly, machinery plan including the time employment, the site plan including the drawings, technological specification of pre-cast frame assembly and of steel-fibre-reinforced floor, inspection and test plan of pre-cast concrete frame assembly, assessment of lifting mechanism, the procedure scheme of pre-cast concrete frame assembly and the cost estimate of pre-cast concrete frame.

Page generated in 0.0325 seconds