• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 245
  • Tagged with
  • 245
  • 193
  • 178
  • 177
  • 172
  • 171
  • 169
  • 164
  • 161
  • 161
  • 149
  • 147
  • 144
  • 143
  • 141
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
231

Polyfunkční dům Brno Gajdošova, stavebně technologická příprava stavby / Multifunctional building Brno, Gajdošova street, Civil technical project

Kopecký, Ladislav January 2017 (has links)
The diploma thesis deals with the building-technology construction preparation of the Multifunctional House Brno Gajdošova. The paper contains the technical report concerning this building; coordination of building situation; time and financial plan of the construction; study of the main technological stages; equipment project; design of major building machinery and mechanisms; schedule of the main construction building; technological regulations for making of the monolithic panel and the green flat roof; inspection and test plans in accordance with these regulations. Furthermore, two technologies referring to the execution of the monolithic roof panel are compared including the comparison of the test plan as well as the budget for the main building. The specialisation is in the field of construction of buildings with special focus on the layouts and the rust of the main building.
232

Administrativní budova ESKO-T, stavebně technologický projekt / Administrative building ESKO-T, construction technology project

Vochyán, David January 2017 (has links)
The aim of this thesis is compile building and technological project of new office building of the company ESKO-T in Třebíč. This is a two-storey building, build technology cast-in-place longitudinal reinforced concrete frame with mono-pitched roof. Work is consist of a possible solution of steel, concrete and formwork of rental shop to building. Building and technological project, technological regulation for concreting, draft machine configuration, documentation broker transport relations, the crane card and concrete pump, control od worte quality, time schedule and building budget rough upper construction, environmental protection, occupational safety and health, object work schedule and price comparison concreting with hanging silo for concrete and concrete pump.
233

Stavebně technologický projekt přípravy a realizace Domova pro seniory Žacléř / Construction project for implementation of Retirement home Žacléř

Bonaventura, Pavel January 2022 (has links)
The aim of this diploma thesis is to prepare the construction of a Home for the Elderly in Žacléř. The work deals with technical regulations for the dismantling of asbestos roofing, demolition work and monolithic structures. For these regulations, a time plan for the implementation of monolithic structures, a control and test plan for monolithic structures, an itemized budget and a time and financial plan - object-oriented will be prepared. Furthermore, this work contains the coordination situation of the construction with broader transport relations, the design of the assembly machine, the report for the construction site equipment with drawings of the construction site equipment for individual technological regulations and last but not least the health and safety plan and assessment of construction noise. As part of the diploma thesis, several appendices were prepared for this stage, such as crane assessment, details of monolithic stair arms, noise wall scheme, budget for construction site equipment, environmental plan, ceiling and wall formwork scheme and staff balance for selected stages.
234

Realizace výstavby Hotelu Karpaty ve Valašských Kloboukách / Construction of the Hotel Karpaty in Valašské Klobouky

Šánek, Adam January 2022 (has links)
The subject of my diploma thesis is the solution of the construction of the Hotel Karpaty located near the town of Valašské Klobouky. The thesis contains an accompanying technical report, solution of transport routes, including traffic situation, time and financial plan of construction, study of implementation of main technological stages, construction site project with division into individual stages, drawing part and construction site report, design of main working machines and mechanisms, time hotel construction plan, plan for securing material resources, including budget and staff needs chart, technological regulation of monolithic ceiling structures, control and test plan for monolithic ceiling structures, design and installation of Schüco aluminum windows, design of construction measures Hotel Karpaty according to LEED standard.
235

Prodejní a servisní centrum Praha – stavebně technologický projekt / Sales and service center Prague - the building technological project

Trhlík, Lukáš January 2012 (has links)
In this diploma thesis deals with execution of ground works, foundation constructions, steel and armored concrete monolithic framework of the sales and service center in Prague. Establishment of the building will be done on armored concrete basement feet, strips and basement plate. The building is desinged in part as a steel framework and in part as a armored concrete framework. The building technological project contains for the phases primarily time and financial plan of object, technology prescription, time schedule, budget, model of the building site accessories, model of the machines, check and test plan, safety plan.
236

Rekonstrukce Hlavní budovy Plaveč – příprava a organizace výstavby / RECONSTRUCTION OF THE CENTRAL BUILDING PLAVEČ – PREPARATION AND ORGANIZATION OF CONSTRUCTION

Černý, Karel January 2012 (has links)
This thesis deals with reconstruction of the home for the elderly Plaveč main building. These reconstruction is primarily interior renovation, the rooms of clients and staff facilities, but also the surrounding of the building. All work will be in full operation. Consideration of this factor in the organization of construction is the main subject of this thesis, which shall include traffic contexts, costing, budget, time schedule, equipment of construction site, construction machinery, technology procedure, occupational safety and resources.
237

Stavebně technologický projekt novostavby pavilonu Veterinární a farmaceutické fakulty v Brně / Constructive-technological project of a new building University of Veterinary and Pharmaceutical Sciences Brno

Gwoździová, Joanna January 2012 (has links)
The subject of the thesis is the construction-technological project New flats of Study and Information Centre of Faculty of Veterinary Medicine in Brno. The building will offer a modern study environment for students. There will be a space for the central library as well as the study centre in the SIC. Also, the university archive and museum depository of the Institute of the History of Veterinary Medicine and Pharmacy will take place there. The building will be constituted of three five-floor blocks with overall groundplan size 72,40 x 30,50 m. The construction system is comprised by a ferroconcrete frame. The block C (the northern one) has one underground floor. At the level of the first uderground floor, the particular blocks are interconnected by an installation corridor. At the level of the second and third above-ground floor, the blocks are linked up with ferroconcrete connecting bridges. In the case of the fourth above-ground floor, the blocks are bridged by a dimensional steel construction which at the same time forms a roof and lifts the glassed frontage along the perimeter of the building. The fifth above-ground floor disposes of recessive steel extenstions of the engine rooms of air conditioning system.
238

Stavebně technologický projekt stavby Nové byty - Bystřice na Pasekách / Constructive-technological project of building New flats - Bystrice on Paseky

Lisztwanová, Mariola January 2012 (has links)
The subject of the thesis is the Constructive-Technological Project of building New Flats – Bystrice on Paseky. The building will be realized at the building plot of land within a developed area. The attempt is to leave the calm rural character of the surroundings undisturbed. The bulding is supposed to merge with the surroundings. Concerned are two apartment buildings with grand plans of 18 x 36 meters, disposing of three above-ground floors, no cellar, and a panel roof. In order to make the building merge with the surroundings, a wooden external cladding has been projected. Thus, the building is supposed to give the impression as if it was constructed of wood.
239

Stavebně technologický projekt montované haly v Pardubicích / CONSTRUCTION TECHNOLOGICAL PROJECT OF PREFABRICATED HALL IN PARDUBICE

Švub, Daniel Unknown Date (has links)
Diploma thesis deals with construction-technological project of prefabricated steel hall. I put emphasis on technological process of foundation structures. The time schedule of all processes, the cost estimation budget, the inspection and testing plan and the machine set designing are also contained. The building site equipment for excavation and rough superstructure and the coordination plan drawing with transportation roads is designed.
240

Výstavba sportovní haly v Novém Městě na Moravě - stavebně technologický projekt / Construction of a sports hall in Nové Město na Moravě - construction technology project

Tomášek, Martin Unknown Date (has links)
This diploma thesis deals with the construction technological preparation of a sports hall in Nové Město na Moravě. The aim of the work is the most optimal design of the construction process. The work contains a technical report of construction technology project, coordination situation of construction with wider links of transport routes, calculation of construction according to THU, time and financial plan of construction, study of main technological stages of building, construction site project, design of main construction machines and mechanisms, building, time schedule of the main building, technological regulation, control and test plan, environmental and safety risks with a plan of their specific solutions for the cladding of skeleton Kingspan panels. Part of the work is also an alternative design of internal partitions.

Page generated in 0.0696 seconds