• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 245
  • 157
  • 110
  • 32
  • 29
  • 25
  • 11
  • 6
  • 6
  • 6
  • 3
  • 3
  • 3
  • 2
  • 1
  • Tagged with
  • 735
  • 245
  • 200
  • 134
  • 97
  • 81
  • 78
  • 65
  • 63
  • 58
  • 54
  • 41
  • 39
  • 36
  • 35
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

Model and performance characteristics of a commercially-sized hybrid air conditioning air conditioning system which utilizes a rotary desiccant dehumidifier

Howe, Robert Randolph. January 1983 (has links)
Thesis (M.S.)--University of Wisconsin--Madison, 1983. / Typescript. Title from title screen (viewed Aug. 14, 2007). Includes bibliographical references (leaves 152-154). Online version of the print original.
32

Chemically Deposited Optical Fiber Humidity Sensor

Gaikwad, Parikshit S 02 August 2003 (has links)
Humidity measurement in industries is a critical factor, since it may affect the business cost of the product, end product quality, optimal functioning of equipment, and the health and safety of the personnel. Hence, humidity sensing is becoming very important, especially in the control systems for industrial processes. Since humidity is expressed in different ways, it is very difficult to come up with a reliable, consistent, and repeatable humidity measurement approach. In contrast to other sensors employed for measuring other parameters like temperature and pressure, a humidity sensor has to be in contact with the process environment and hence is difficult to implement. This research was initiated at the Diagnostic Instrumentation and Analysis Laboratory (DIAL) for the requirement from the DOE to monitor the moisture in the soil at the nuclear waste storage facility. The idea was to monitor the leakage, if any, in the storage cylinders to avoid any hazard that may come up. The humidity sensor in this case had to be able to transmit the measurement over a distance far away from the actual measurement site. Keeping all these factors in mind, a chemically deposited optical fiber humidity sensor was developed. It was based on the evanescent tail absorption of light passing through an optical fiber due to hygroscopic material deposited on it. The hygroscopic material used was an aqueous solution of Poly-vinyl-acetate (PVA) and Cobalt Chloride (COCl2). The sensor yielded a consistent humidity measurement from 75% to 95%. Based on the above research, research is currently in progress to bring up a commercial prototype of the sensor.
33

TELEMETRIC EGG FOR MONITORING NEST MICROCLIMATE OF ENDANGERED BIRDS

Stetten, George, Koontz, Fred, Sheppard, Christine, Koontz, Charles 11 1900 (has links)
International Telemetering Conference Proceedings / October 29-November 02, 1990 / Riviera Hotel and Convention Center, Las Vegas, Nevada / A series of artificial eggs has been developed for the New York Zoological Society to measure conditions in the nest of the white-naped crane (Grus Vipio). Investigations undertaken at the Bronx Zoo have endeavored to improve artificial incubation of the eggs of endangered species of birds. Artificial eggs were constructed and camouflaged so that a pair of birds would accept and incubate them. Inside each counterfeit egg, a radio telemetry transmitter was hidden to report on the temperature and humidity in the nest and the orientation of the egg itself with respect to gravity.
34

Some factors affecting the performance of draught buffaloes in wetland rice cultivation in Sri Lanka

Hulangamuwa, Sarath M. January 1993 (has links)
No description available.
35

Projektera och producera en fuktsäker byggnad : En studie som klarlägger ansvarstagandet och hur kommunikationen mellan aktörer kan förbättras / Planning and produce for a humidity secure building : A research that clarifies the responsibilities and how the communication between actors in a building project can be improved

Engström, Tobias, Johansson, Jesper January 2007 (has links)
<p>Tidigare studier visar att ansvarsfrågan för fuktsäkerheten är oklar samt att kunskapsöverföringen mellan byggprocessens olika aktörer brister. Detta kan leda till bristande fuktsäkerhet som i sin tur kan leda till hälsoproblem för de boende.</p><p>Den 1 juni 2006 kom Boverket ut med en ny regelsamling (BBR) och som numer innehåller tydligare regler och omformulerade krav gällande fuktsäkert byggande.</p><p>Detta arbete syftar till att redovisa risker med informationsspridningen mellan byggprocessens olika skeden samt att redovisa vilka förändringar som måste göras av aktörerna för att uppfylla senaste BBR (BFS 1993:57 med ändringar t.o.m. 2006:22). Målet med arbetet är att klarlägga ansvarsantagandet i de olika skedena av processen och att bidra med bättre rutiner för fuktsäkerheten.</p><p>Arbetet grundar sig på en litteraturstudie som i teori beskriver hur aktörerna bör bedriva sitt arbete för ett fuktsäkert byggande samt redogör vilken aktör som ansvarar för vilken del av arbetet. Till arbetet har även en fallstudie genomförts, på ett byggnadsprojekt utfört i egen regi, där aktörer inom program, projektering och produktionsstadiet intervjuats. Utifrån intervjusvaren redovisas risker och förbättringsförslag med deras arbete för fuktsäkert byggande.</p><p>Resultatet av fallstudien visar att det finns en del förbättringar att genomföra. I fallstudien upprättar inte beställaren några specifika fukttekniska krav. Beställaren bör upprätta en tydlig kravformulering som fastställer tekniska krav, krav på kompetens, rutiner och egenkontroller för projektet. Kravformuleringen bör också redovisa hur kraven ska verifieras samt vilken aktör som ansvarar för att kraven uppfylls. Då beställaren upprättar en sådan kravformulering minskar oklarheter i ansvarsfrågan som vilken aktör som ansvarar för vad.</p><p>I fallstudien skickar konstruktör sina bygghandlingar till beställare som vidarebefordrar dessa till entreprenör. För att minimera kunskapsförluster och missförstånd, mellan projektering och produktion, så bör konstruktören träffa entreprenören för att konstruktören ska kunna överföra avsikter och information med sina bygghandlingar.</p><p>I studerat projekt så tar arkitekten i första hand hjälp av materialleverantörer. Det bör kopplas fler kompetensområden, i första hand en oberoende fuktsakkunnig, till projektet i ett tidigare skede. Detta ökar möjligheten för att skapa ett välutformat program.</p><p>Studerat fall är projekterat enligt tidigare BBR, men om projektet skulle vara projekterat enligt gällande BBR (BFS 1993:57 med ändringar t.o.m. 2006:22) skulle vissa förändringar behöva genomföras. För att uppfylla de nya kraven från Boverket bör en fuktsäkerhetsprojektering utföras, och till detta ska rätt kunskap anlitas om det inte redan ingår i projektet. Vidare måste entreprenören ändra sina rutiner vid mottagningskontrollen av materialet. Idag utförs inte någon fuktkvotsmätning av virket, vilket måste genomföras för att säkerhetsställa att virket inte överstiger det kritiska fukttillståndet som Boverket fastställt.</p> / <p>Previous studies show that the responsibility of humidity is vague and that the transference of the knowledge between the building project actors fails. This can lead to health problem among the users of the building.</p><p>The first of June 2006 Boverket released a new collection with rules of construction which contains more specified rules to guarantee a secure humidity construction.</p><p>The purpose with this report is to clarify what kind of changes the actors need to do, to fulfil the new rules of construction from Boverket. The purpose is also to clarify risks with how the information is transferred between actors and what kind of responsibility the actors have in the different phases of the building project.</p><p>The report is based on a study of different literary works which in theory describes how the actors should pursue their work for securing humidity and also describes which actor is responsible in the different phases of the building project. For the report a specific building project is studied where different actors in different phases of the project has been interwieved. From the replys of the interwievs the risks and improvements for securing humidity is showed.</p><p>The result of the study clarifies that improvements can be done in this project. The orderer of the project doesn’t create demands from humidity point of view. To minimize misunderstanding of where the responsible lies in the different phases of the project, the orderer should create demands and also clarify which actor who is responsible for fulfilling the demands.</p><p>In this case the design engineer sends his building papers to the orderer of the project which further sends the paper to the contractor. To minimize misunderstandings between planning and production, the design engineer should meet up with the contractor to explain his intendancy with his building papers.</p><p>In this building project the architect often listens to the supplier of material. If more knowledge is connected to an earlier phase of the building project, most of all a humidity expert, it will increase the chance for a well formed program.</p><p>To fulfil the new rules of construction from Boverket the contractor needs to change his routine for the receiving of materials.</p>
36

Fuktsäkringsarbete i ett byggprojekt : – En undersökning om hur byggprocessens aktörer arbetar för att uppnå samhällskraven / Securing humidity in a building project : -A Research about how the building process and its actors work to meet demands regarding the law.

Hansson, Linus, Nyberg, Andreas, Wahlberg, Jonas January 2006 (has links)
<p>Lagen säger att man inte får uppföra byggnader så att det riskerar människors hälsa. Trots detta uppförs byggnader så att ohälsa uppstår för de boende. Arbetet behandlar hur man i ett byggprojekt arbetar med fuktsäkring. Syftet är att undersöka hur man i projektet arbetar med att fuktsäkra byggnaderna. Målet är att lyfta fram var i processen det finns risker när det gäller fuktsäkring, och även ge förslag till förbättringar av arbetet med fuktsäkringen. En studie över lagar och förordningar har gjorts för att se vilka krav som ställs på en byggnad ur fuktsynpunkt samt hur branschregler tillämpas så att fuktproblem inte uppstår i byggnader. Intervjuer har gjorts för att se vilken roll byggnadsnämnden, entreprenören, konstruktören och leverantören har när det gäller att ställa krav på fuktsäkring. Arbetet är avgränsat till uppförandet av flerbostadshus i Karlstad där man bygger i egen regi. Resultatet visar att fuktskador riskerar att grundläggas i alla skeden i byggprocessen och att alla aktörer i projektet kan bidra till riskerna. Resultatet visar även att man är medvetna om fuktproblematiken och att större krav på dokumentation och erfarenhetsåterföring skulle minska riskerna för fuktskador. För att förbättra fuktskyddet skall man redan i programskedet upprätta en projektspecifik fuktskyddsbeskrivning gjord i samarbete med en fuktskyddssakkunnig. Man borde också informera/utbilda alla parter som riskerar bidra till fuktproblem i byggnader.</p> / <p>According to Swedish law you are not allowed to construct buildings in a way that may result in jeopardizing people’s health. Despite this fact buildings are constructed in such way that health problems accurse. This composition deals with a building-project and how its actors works regarding to humidity that effects buildings. The purpose of this essay is to look into how in a project one works with eliminating risks concerning humidity and also the level of demands that are made to secure the construction. The objective is to point out where in the building-process risks appears when it comes to securing humidity in buildings, but also to suggest how to make improvements. The method is based on a study of laws and ordinances that concerns humidity in buildings. The way the building line, and the knowledge within it, is used in a project to secure the building from humidity has also been studied. Interviews has been made to look into in what the role building department, entrepreneur, constructor and supplier has regarding to humidity in buildings. This essay is demarcated to multifamily buildings in Karlstad built in own-regime. The result shows that the risk of damage as a consequence of humidity is founded in all phases in the building-process and that all actors of the process are a part of the problem. The result also shows that actors in the project is well averred of the problem with humidity but that there is not enough demands on documentation and on how to work with experiences from earlier project. To work in a more efficient way one should draw up a description for the project regarding to the risk of humidity in the building. This description should be made in co-operation with someone who has the right knowledge concerning how to draw up a description, and that also makes the project safe from humidity point of view. The result also shows that it is necessary to educate all actors that risks contributing to the problem with humidity in buildings.</p>
37

Fuktsäkringsarbete i ett byggprojekt : – En undersökning om hur byggprocessens aktörer arbetar för att uppnå samhällskraven / Securing humidity in a building project : -A Research about how the building process and its actors work to meet demands regarding the law.

Hansson, Linus, Nyberg, Andreas, Wahlberg, Jonas January 2006 (has links)
Lagen säger att man inte får uppföra byggnader så att det riskerar människors hälsa. Trots detta uppförs byggnader så att ohälsa uppstår för de boende. Arbetet behandlar hur man i ett byggprojekt arbetar med fuktsäkring. Syftet är att undersöka hur man i projektet arbetar med att fuktsäkra byggnaderna. Målet är att lyfta fram var i processen det finns risker när det gäller fuktsäkring, och även ge förslag till förbättringar av arbetet med fuktsäkringen. En studie över lagar och förordningar har gjorts för att se vilka krav som ställs på en byggnad ur fuktsynpunkt samt hur branschregler tillämpas så att fuktproblem inte uppstår i byggnader. Intervjuer har gjorts för att se vilken roll byggnadsnämnden, entreprenören, konstruktören och leverantören har när det gäller att ställa krav på fuktsäkring. Arbetet är avgränsat till uppförandet av flerbostadshus i Karlstad där man bygger i egen regi. Resultatet visar att fuktskador riskerar att grundläggas i alla skeden i byggprocessen och att alla aktörer i projektet kan bidra till riskerna. Resultatet visar även att man är medvetna om fuktproblematiken och att större krav på dokumentation och erfarenhetsåterföring skulle minska riskerna för fuktskador. För att förbättra fuktskyddet skall man redan i programskedet upprätta en projektspecifik fuktskyddsbeskrivning gjord i samarbete med en fuktskyddssakkunnig. Man borde också informera/utbilda alla parter som riskerar bidra till fuktproblem i byggnader. / According to Swedish law you are not allowed to construct buildings in a way that may result in jeopardizing people’s health. Despite this fact buildings are constructed in such way that health problems accurse. This composition deals with a building-project and how its actors works regarding to humidity that effects buildings. The purpose of this essay is to look into how in a project one works with eliminating risks concerning humidity and also the level of demands that are made to secure the construction. The objective is to point out where in the building-process risks appears when it comes to securing humidity in buildings, but also to suggest how to make improvements. The method is based on a study of laws and ordinances that concerns humidity in buildings. The way the building line, and the knowledge within it, is used in a project to secure the building from humidity has also been studied. Interviews has been made to look into in what the role building department, entrepreneur, constructor and supplier has regarding to humidity in buildings. This essay is demarcated to multifamily buildings in Karlstad built in own-regime. The result shows that the risk of damage as a consequence of humidity is founded in all phases in the building-process and that all actors of the process are a part of the problem. The result also shows that actors in the project is well averred of the problem with humidity but that there is not enough demands on documentation and on how to work with experiences from earlier project. To work in a more efficient way one should draw up a description for the project regarding to the risk of humidity in the building. This description should be made in co-operation with someone who has the right knowledge concerning how to draw up a description, and that also makes the project safe from humidity point of view. The result also shows that it is necessary to educate all actors that risks contributing to the problem with humidity in buildings.
38

The Study of Precondition Variations on the Warpage of PBGA packages

Chen, Wei-Chih 29 August 2001 (has links)
The main objective of this research is to studying the moisture effect on warpage of PBGA via IR-reflow process by utilizing Shadow Moir&#x00E8; method. The relationship between precondition variations and moisture content of PBGA is also studied.
39

The effect of relative humidity on the upper thermal death point of the dry-wood termite, Marginitermes hubbardi (Banks) (Isoptera, kalotermitidae)

Megenasa, Tessema, 1936- January 1964 (has links)
No description available.
40

Effect of artificial weathering of seed cotton on weight and fiber quality

Makki, Yahia Mohamed, 1940- January 1972 (has links)
No description available.

Page generated in 0.0845 seconds