• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Slöseri i produktionsflödet: Analys av en platsgjuten betongvägg / Waste in the production flow: Analysis of a cast in-situ concrete wall

Fransson, Mattias, Jamtlien, Mattias January 2018 (has links)
Höga byggkostnader och betydande bostadsbrist i Sverige visar att ett effektivare bostadsbyggande krävs. En reducering av slöseri i byggprocessen bidrar till en effektivisering av både tid och kostnad. För att öka förståelsen för vikten av effektivisering synliggör den här studien slöseri i produktionsflödet för en platsgjuten betongvägg i ett bostadsprojekt. Studien visar även var i produktionsflödet det finns förbättringsmöjligheter. Slöseriet synliggjordes genom en tidsstudie som visade på stor potential till förbättring i bostadsprojektets resursflöde, materialflöde och informationsflöde. Mycket tyder på att dessa brister i produktionsflödet beror på allt för kort byggtid, vilket leder till att en fullgod planering inte alltid utförs. / High construction costs and considerable housing shortages in Sweden show that a more efficient housing construction is required. A reduction of waste in the construction process contributes to the efficiency of both time and cost. In order to increase the understanding of the importance of efficiency, this study reveals waste in the production flow of a cast in-situ concrete wall in a housing project. The study also shows where in the production flow there are improvement opportunities. The waste was made visible through a time study which showed great potential for improvement in the housing project resource flow, material flow and information flow. There are many indications that these shortcomings in the production flow are due to a too short construction time, which means that a good planning is not always carried out.

Page generated in 0.0554 seconds