Spelling suggestions: "subject:"integrated product tem"" "subject:"integrated product term""
1 |
HSTSS-DAC CUSTOM INTEGRATED CIRCUITS FOR SUBMINIATURE PCM TELEMETRY AND SIGNAL CONDITIONINGGibson, David, Penrose, N.B., Doerr, Michael, Borgen, Gary 10 1900 (has links)
International Telemetering Conference Proceedings / October 25-28, 1999 / Riviera Hotel and Convention Center, Las Vegas, Nevada / To meet specific test and evaluation requirements, the Hardened Subminiature Telemetry and Sensor Systems (HSTSS) program is addressing the miniaturization and ‘G’ hardening of telemetry components. Two custom Integrated Circuits (ICs) are in development to support the design of miniature Pulse Code Modulation (PCM) systems with up to 128 analog input channels. This paper describes the design and development of the custom IC chips of the HSTSS Data Acquisition Chipset (DAC). The original requirements, the roll of the Integrated Product Team (IPT), design decisions, a discussion of the additional features, and practical limitations of the Data Acquisition Chipset will be covered.
|
2 |
INSTRUMENTATION AND LOGISTICS: INFLUENCING DESIGN AND OWNERSHIP COSTSPhillips, Martin 10 1900 (has links)
International Telemetering Conference Proceedings / October 25-28, 1999 / Riviera Hotel and Convention Center, Las Vegas, Nevada / A program’s success is measured by the three parameters of cost, schedule and performance. This is true of any acquisition program, including instrumentation development and procurement. The primary purpose of Logistics is to influence and reduce the Total Ownership Costs (TOCs) to the Department of Defense while procuring a supportable system that meets the customer’s needs. The time to influence the TOCs is as early in the life-cycle of the program as can be done - where it is cheapest to affect a “fix.” This paper will briefly describe where Logistics influences ownership costs in the acquisition process. Examples of cost drivers identified in the Hardened Subminiature Telemetry Sensor System (HSTSS) program will be provided and the role of Integrated Product Team (IPT) members in influencing and reducing the TOCs will be discussed. This process is not just in the purview of the traditional logistician, but is also performed by each member of the program’s IPT. Each IPT member brings his unique knowledge and experiences to the teams pool of corporate knowledge. Examples will be provided of decisions made by the IPT that reduced TOCs.
|
3 |
The use of reciprocal interdependencies management (RIM) to support decision making during early stages designShelton, Mona C 03 May 2008 (has links)
Published works cite that 70-80% of the total cost of a product is established during conceptual design, and that improvements in time-to-market, quality, affordability, and global competitiveness require the development of better approaches to assist decision-making during the early stages of product design, as well as facilitate enterprise knowledge management and reuse. For many years, concurrent engineering and teaming have been viewed as “the answer” to product development woes, but studies reveal teaming is not sufficient to handle the task complexities of product development and the long-term goal of enterprise learning. The work of Roberto Verganti provides new insights with regard to reciprocal interdependencies (RIs), feedforward planning, selective anticipation in the context of improving teaming and concurrent engineering, as well as enterprise learning, knowledge management, reuse. In this research, reciprocal interdependencies management (RIM) is offered as a means of addressing product development and concurrent engineering issues occurring in the early stages of design. RIM is combination of Verganti’s concepts, a conceptual RIs structure, new RIM-application strategies, RIM-diagramming, and a conceptual RIM-based decisions support system, which come together to form a vision of a RIM-based enterprise knowledge management system. The conceptual RIM-based DSS is presented using the specific case of supporting a working-level integrated product team (IPT) engaged in the design of an aircraft bulkhead. A qualitative assessment tool is used to compare RIM to other approaches in the literature, and initial results are very favorable.
|
Page generated in 0.2528 seconds