• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 34
  • 1
  • Tagged with
  • 35
  • 19
  • 15
  • 9
  • 8
  • 8
  • 7
  • 7
  • 6
  • 5
  • 5
  • 5
  • 5
  • 5
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

Statické zajištění zámku / Static provision of castle

Kulla, Lukáš January 2016 (has links)
The aim of this final thesis was static protection for castle in Miroslavské Knínice. It was necessary to explore several respects and find signs of violation. Next analyze and propose suitable assurance of individual parts. Separe into the stages of construction and to consider the proposal in terms of ensuring the resistance of materials. Finally create a detailed documentation in the range suitable for performance. Based on engineering geology and visual survey was designed horizontal bracing prestressing cables at three levels. The first level "A" consists of a closed circuit of prestressed reinforced concrete passports, supplemented by the cross and construction of prestressed reinforced concrete passports. Next level "B,C" is used to secure the top of the building. Levels “B,C” are proposed using prestressed cable in spare cable channels.
32

Premonstrátský klášter a kostel sv. Jiljí v Milevsku / Premonstratensian Monastery and Saint Giles Church in Milevsko

Zelenková, Pavla January 2016 (has links)
This dissertation focuses on the constructing and architectonic development of Premonstratensian monastery and the church of St. Giles of Milevsko in the Middle Ages. The work is based on the older art historical literature and it evaluates the archaeological researches' findings in the locality as well as construction and historic researches of particular buildings, which were carried on with connection to the restitution of the site to the Premonstratensian order in the 1990s. The work demonstrates the Milevsko grounds picture and its construction as well as architectonic development from the establishment of the pre- monastery era in the eighth century until the Hussite's wars. The dissertation provides study of court with a church with apsis, stone Romanesque house and the basilica. It characterises the George of Milevsko personality as well as the significance of the abbot Jarloch. It analyses in detail the Roman architecture of St. Giles Church and attempts to interpret the procedure of its construction. Furthermore, it deals with the shape of the monastery's basilica and the description of Romanesque monastic buildings while comparing the premises to other monastic sites in this country. This dissertation also describes the architectonic boom of abbeys in the era of early Gothics as well as...
33

Tunel Blanka: Inženýrskogeologické problémy a rizika ražby / The Blanka tunnel, geological hazadrs and problems during boring

Sedláček, Václav January 2016 (has links)
The Blanka tunnel has two boring sections: Brusnice tunnel and Královská obora tunnel. Both tunnels were boring in difficult geologycal conditions, but the geology conditions of these tunnels are not same. Also they had not the same hazards during boring. There was used a spectrum of different technical works with hazard reduction purpose and safety process of boring. There were three serious accidents, wnich everyone made a creater on the surface, but they have not the same causes. This text has a task to describe a geological survey before and during the boring of both tunnels. How other reasons affected the process of boring? How the tunnels were bored? What events preceded the everyone of three major failure? This text does not deal with economical things of boring and effects of specific personal influence on the process of boring. Key words Tunnel, excavation, Blanka, Brusnice, Letná, Stromovka park, Vltava river, underground water, geology, ordovik, New Austrian Tunnelling method, pilot tunnel, calotte, bench, bottom, arche, bolt, lining, grouting, collapse of ceiling, failure, tube, shale, quarzite, soil, loess, ballast, clay
34

Městský okruh Blanka, tunel Královská obora - ražená část, stavebně technologická příprava stavby / City circle road Blanka, tunnel Královská obora - mined section, preparation and building construction technology

Kobielusz, Petr January 2013 (has links)
My thesis is focused on process preparation and building construction technology of primary lining road tunnel, implemented in city part of Troja in the capital city Prague. Specifically it is a part of tunnel complex Blanka. The name of this part is Kralovská obora. If the all tunnel parts are built this tunnel complex Blanka can be complemented to already opened tunnels Zlíchovský, Mrázovka and Strahovský which are the part of city traffic circle. This technology preparation includes schedules and financial plans of the building, technological prescription for the primary tunnel lining, safety plan, control and trial/test plans, environmental plan, project of construction site, design of the main working machines, items budget of the north tunnel tube, coordination situation plan with wider relationships transport routes and technical report of building technological project.
35

Novostavba vinařského domu / Wine making house

Kouřilová, Vendula January 2015 (has links)
The subject of this master thesis is a design of wine house which comes together with restaurant and accommodation in Strazovice near Kyjov. It includes design study and all the detailed drawings of the building. The building is designed with three services - winery, restaurant and accommodation. Winery is divided into separate rooms for wine processing, finishing and wine aging, also storage, distribution and sale of wine. Canteen service includes kitchen with accessories, restaurant with dining, separated lounge, vaulted cellar and room for degustation. Lounge, cellar and degustation room is primary determined for different corporate events, conferences, weddings, family events and others. For building were chosen descending lands at the edge of Strazovice.. The main reason for this decision is the view that this place provides because of its higher position. Also this village is a part of region, for which wine production is typical. The shape of the object is rectangular and consists of three floors. Two upper floors are receding with comparison to the first floor. This formed a part of terrace which is connected with the oval part on pillars. Basement is situated completely below ground, only the south side is partly uncovered. Construction is made of reinforced concrete. Ground floors are with ventilated frontage. Frontage of the first floor is covered with wooden cladding, and frontage of the second floor is covered with plaster. Vertical constructions are made of lime-sand blocks and horizontal constructions are reinforced concrete. The roof is built of wooden trusses with arched upper part. On the roof there are installed photovoltaic panels for electricity which is used in the building. Rainwater is held in tank, servers as a water supply for the building. Wastewater is depurated in small sewage plant which is further conducted into the building. Other wastewater is captured in the sump. Projection of the winery emphasis, inter alia, on static and

Page generated in 0.0266 seconds