Labour intensive work in Botswana: A description and evaluation of six programmesMuatjetjeja, Mex Mujazemee 16 February 2007 (has links)
Student Number : 0400522J -
MSc research report -
School of Civil and Environmental Engineering -
Faculty of Engineering and the Built Environment / The Government of Botswana has, since 1972, implemented several programmes of
labour intensive work as a complementary effort to alleviate high levels of
unemployment, poverty and rural under-development. This research project describes
and evaluates six of the programmes: the Botswana Labour Intensive District Roads
Programme (LG 34), the Rural Roads Programme (RRP), the Labour Intensive Public
Works Schemes (LG 38), the Labour Intensive Drought Relief Programme (LG 117),
the current National Public Works Programme (LG 1107) and the current Labour
Intensive Routine Road Maintenance Programme. The programmes have been
described and evaluated in relation to their internal objectives as well as against
international literature on labour intensive work in order to determine whether or not
they were successful. The study reveals that the LG 34 was a highly successful
programme as it achieved most of its key objectives and was in conformity with
international literature. The programme created jobs for a significant number of poor
Batswana through the construction of good quality low cost roads. It developed and
established road construction and maintenance units within the District Councils. The
success of the LG 34 was, however, later undermined by a depreciated wage rate
contributing to the eventual demise of the programme.
The Labour Intensive Road Maintenance Programme, although currently in its early
stages of expansion, has been impressive. It has successfully developed and
demonstrated through a Pilot Project a model for the use of labour based small
contractors, managed by a private sector consultant, for routine road maintenance.
This had not been done before in Botswana.
The rest of the programmes were plagued by inefficiencies resulting from poor initial
planning, lack of training and technical supervisory personnel, lack of proper
organisational systems for the programmes and incorporation into drought relief activities. Most of these programmes were wound up, and the on-going National
Public Works Programme is struggling to survive.
In sum, the Botswana experience has shown that labour intensive methods could be
successful if attention were paid to initial design and planning, training of technical
supervisory staff and the establishment of proper organisational systems. In addition,
to differentiate proper labour intensive work from drought relief, wages must be paid
at or close to the Industrial Class minimum wage.
DPDoFcuments
Complete
Click Here & Upgrade
Expanded Features
Unlimited Pages
|
2 |
Comparative evaluation of the development of labour-intensive works technology programme in NamibiaMvungi, Charles Nyero 04 November 2008 (has links)
1. Background
A number of development programmes have been carried out in Namibia since independence. It is seldom that evaluation is undertaken after completion to assess the degree of success of the programmes implemented in relation to their objectives and other effects. Often, similar programmes or projects are undertaken without the benefit of lessons and experiences from past programmes or projects. The aim of his study was to evaluate one such post-independence development programme implemented in Namibia namely the Labour-Based Works Technology Development Programme (LBWP). This programme was initiated in 1991, and was largely completed in 2000. 2. Problem Statement
Creation of employment and poverty eradication are two of the four broad goals of the National Development Plan 1 and II (NDP I and NDP II) of the Government of Namibia (GON). The LBWP was implemented during the period of NDP1. Programme objectives were two fold; the creation of employment opportunities in the rural areas; and the development of road infrastructure in the underdeveloped inaccessible areas of the country. Prior to this programme, labour-based works technology was unknown in Namibia. There is no comprehensive study undertaken as yet to examine the level of success of the LBWP in Namibia in relation to its objectives, and in comparison with other successful programs elsewhere. This study was carried out for this purpose.
3. Literature Review
An extensive literature review was undertaken to establish the existing intellectual basis and the theoretical framework of labour-based works technology. Research that has already been done was analysed and compared to crystallise this study.
|
3 |
Evaluation of labour-intensive construction projects in Madibeng municipality, North-West Province, South Africa.Ngebulana, Matladi Refilwe 11 April 2008 (has links)
The launch of the Expanded Public Works Programme has
led to preferential use of labour-intensive
construction methods over conventional methods in
construction and maintenance of public infrastructure
assets. This report evaluated five bulk water
infrastructure projects in Madibeng Municipality where
labour-intensive construction methods were used.
The research found that factors which adversely
affected construction progress included: inability to
transfer experience and lessons learnt from one project
to the next, skills and experience shortcomings,
administrative and management realities, negative
interventions from stakeholders and failure of the
Municipality to set specific objectives and monitor
project achievements with respect to intended
objectives. Appropriate training and support from
local communities were found to enhance success during
construction.
It was concluded that labour-intensive construction
methods are feasible for bulk water provision projects
and can generate productive significant employment
provided certain basic requirements were in place.
Ultimately the findings led to the compilation of
lessons learnt from the projects.
|
4 |
The impact of South-South FDI : knowledge spillovers from Chinese FDI to local firms in the Cambodian light manufacturing industriesVICHETH, Pisey 13 August 2018 (has links)
The study of the extent to which incoming FDI results in ‘spillovers’ (technology, R&D, management practices and know-how) has so far yielded only mixed results, and research has largely been restricted to north-north and north-south interactions; this study develops a model of knowledge spillovers based on previous literature and extends inquiry into south-south FDI by investigating spillovers from Chinese FDI to the Cambodian garment and light manufacturing industries. Several significant factors including the nature and extent of FDI linkages, local industry absorptive capacity, nature of the network relationship, and local firms’ learning orientation have been found to influence the extent to which knowledge spillovers occur. These variables are integrated within this paper which develops a conceptual model of knowledge spillovers based on the Awareness-Motivation- Capability framework to examine knowledge spillovers derived through both horizontal and vertical linkages. One area of interest examined in the study is the FDI influence on domestic firms’ export performance since light manufacturing represents the most significant portion of Cambodia's total export products. The thesis, addresses two primary questions: (1) when, where and under what conditions are significant knowledge spillovers created? And (2) what are the effects of the spillovers on domestic companies' technological capability and export performance? The research contributes to the previous literature by further developing the theory on the realisation of knowledge spillovers as well as exploring the nature and channels of knowledge spillovers from South-South FDI in labour-intensive industry, an area of study previously unexplored. Our results show that knowledge spillovers occur through both horizontal and vertical linkages and Cambodian firms receive more spillovers from Chinese FDI than they do from FDI from developed countries.
|
5 |
A geographic perspective of labour-intensive methods in the development and maintenance of transport infrastructureMusekene, Eric Nndavheleseni 04 1900 (has links)
The study investigates the extent of distributional impacts of labour-intensive
road projects using a geographical approach. The aim is to evaluate
infrastructural effectiveness. The central premise is that the interface between
road investment and economic development has broad implications that are
beyond transportation’s basic purpose of providing access and mobility.
Communities are motivated by the outcomes and impacts of road
infrastructure development in improving the productiveness of the economy,
in line with socio-economic development and other multiplying effects.
The objective was to describe the nature and delivery mechanisms of labourintensive
road projects, evaluate the impact thereof on the project participants
and their communities and explore the constraints and challenges
experienced by these initiatives. The impact of the Gundo Lashu programme
was measured, based on an assessment of programme outputs, outcomes
and impacts, to determine whether the project had the desired effects on
individual participants and their households. A matched control case study
design, using a combination of qualitative and quantitative approaches was
adopted.
The study found that the Gundo Lashu programme had achieved the
expected outputs in terms of the total number of jobs created, total road
length constructed and maintained. However, the communities’ socioeconomic
outcomes and the impacts of the programme on poverty and
sustainable livelihoods were mixed. These conclusions re-affirm the notion
that the development of rural road infrastructure alone by labour-intensive
construction methods, is not sufficient in tackling poverty. While government is
focusing on addressing unemployment and skills development through labourintensive
road construction programmes, there is a need to ensure proper
integration of government services to make a significant impact. Huge
deficiencies exist in the inter-linkages between the programme planning
process and the municipal planning system and that there are a number of
management and planning, structural and functional, human resources and
funding barriers to proper planning, implementation and monitoring of projects
within the Gundo Lashu programme. Various challenges and barriers
emanates from lack of coordination, political interferences and lack of
strategic direction. Key recommendations include comprehensive road
planning, better project targeting mechanisms, development of guidelines for
future maintenance, skills training and capacity development, and resultsbased
monitoring. / Geography / D. Phil. (Geography)
|
6 |
A geographic perspective of labour-intensive methods in the development and maintenance of transport infrastructureMusekene, Eric Nndavheleseni 04 1900 (has links)
The study investigates the extent of distributional impacts of labour-intensive
road projects using a geographical approach. The aim is to evaluate
infrastructural effectiveness. The central premise is that the interface between
road investment and economic development has broad implications that are
beyond transportation’s basic purpose of providing access and mobility.
Communities are motivated by the outcomes and impacts of road
infrastructure development in improving the productiveness of the economy,
in line with socio-economic development and other multiplying effects.
The objective was to describe the nature and delivery mechanisms of labourintensive
road projects, evaluate the impact thereof on the project participants
and their communities and explore the constraints and challenges
experienced by these initiatives. The impact of the Gundo Lashu programme
was measured, based on an assessment of programme outputs, outcomes
and impacts, to determine whether the project had the desired effects on
individual participants and their households. A matched control case study
design, using a combination of qualitative and quantitative approaches was
adopted.
The study found that the Gundo Lashu programme had achieved the
expected outputs in terms of the total number of jobs created, total road
length constructed and maintained. However, the communities’ socioeconomic
outcomes and the impacts of the programme on poverty and
sustainable livelihoods were mixed. These conclusions re-affirm the notion
that the development of rural road infrastructure alone by labour-intensive
construction methods, is not sufficient in tackling poverty. While government is
focusing on addressing unemployment and skills development through labourintensive
road construction programmes, there is a need to ensure proper
integration of government services to make a significant impact. Huge
deficiencies exist in the inter-linkages between the programme planning
process and the municipal planning system and that there are a number of
management and planning, structural and functional, human resources and
funding barriers to proper planning, implementation and monitoring of projects
within the Gundo Lashu programme. Various challenges and barriers
emanates from lack of coordination, political interferences and lack of
strategic direction. Key recommendations include comprehensive road
planning, better project targeting mechanisms, development of guidelines for
future maintenance, skills training and capacity development, and resultsbased
monitoring. / Geography / D. Phil. (Geography)
|
7 |
Labour Intensive Public Work (LIPW) Programme as an empowerment tool for youth development : the Ghanaian experienceEshun, Samuel Nuamah 02 1900 (has links)
The Labour Intensive Public Work (LIPW) programme under the Ghana Social Opportunity
Project (GSOP), is a social protection programme initiated by the Government of Ghana, to offer
jobs and income earning opportunities to some targeted rural residents, especially the youth,
through the application of labour intensive technology in the construction of community
infrastructure that has the potential of generating secondary employment. This is a mixed method
study sought to provide an account on the Ghanian version of LIPW programmes. The study
assessed and identified the challenges facing the programme implementation from beneficiary and
implementers’ perspective in order to set the platform for an interactive feedback between project
implementers and community members for the smooth implementation of future LIPW
programmes. The study also assessed the impact of the programme on poverty and migration
among the youth in Ghana. In identifying the challenges facing the programme from implementers’ perspective, 15 key project
implementers were interviewed. An interview guide and a questionnaire were also developed to
collect data from 500 beneficiaries of the programme to know their challenges. In assessing the
impact of the programme on migration among the youth, questionnaires were administered to 239
households in beneficiary communities and 189 households from non-beneficiary communities of
the LIPW programme. Finally, data was collected from 90 youth who benefited from the
programme and 90 youth who did not benefit from the programme to compare and determine the
extent to which the programme has contributed in reducing poverty among the youth.
The study revealed that the key challenge facing the programme implementation from the
implementers’ perspective is capacity problem involving, inadequacy of staff to implement the
programme at the district level, frequent breakdown of vehicles for monitoring, and delays in the release of funds for commencement of project. Beneficiaries of the programme also indicated that
they were not satisfied with the amount of money they were receiving as wage for their labour.
They were also unhappy with the delays in payment of their wages and the period of engagement
in the programme. The study found out that the LIPW programme under the GSOP has not
contributed in reducing migration among the youth. However, the programme has contributed to
reducing poverty among the youth. The study therefore recommends that capacity gap analysis
conducted before project initiation should include adequacy of staff and logistics to cater for any
deficiency. It is strongly recommended that beneficiaries of the programme should be consulted
in setting the wage rate to avoid resentment provoking misunderstanding between beneficiaries
and project implementers. The study further recommended that the government should scale up
the programme to cover more communities in order to reduce poverty among the youth in Ghana. Finally, the study proposed a new model for LIPW for the youth known as ‘LIPW +3Cs’. This
model incorporates three Cs, that is ‘C’ompetence’, ‘C’onnections’ and ‘C’haracter’ into LIPW
programmes. ‘LIPW +3Cs’ will not only train youth to secure jobs after the programme
(Competence) but will assist them to establish a network among themselves and other supporting
institutions (Connections). Issues of character which encompases a sense of right and wrong will