• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 4
  • 2
  • Tagged with
  • 9
  • 9
  • 9
  • 9
  • 5
  • 5
  • 4
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

The ecological economics of inter-basin water transfers the case of the Lesotho Highlands Water Project /

Matete, Mampiti Elizabeth. January 2004 (has links)
Thesis (Ph. D.)--University of Pretoria, 2004. / Title from PDF title page (viewed on July 16, 2006). Includes bibliographical references (p. 170-184).
2

Power, porous borders and polycentricity: the changing nature of transboundary water governance

Baltutis, William Jesse 14 May 2018 (has links)
The challenges facing resource management, including transboundary river basins, have become increasingly complex, requiring more holistic readings of governance processes that encompass a range of formal and informal collaborations between diverse actors. Innovation and transformative governance changes hold potential for addressing the increased complexity and multi-scaled nature of the challenges facing the world’s shared rivers. However, significant research gaps exist around this application in practice. This dissertation asks the following questions: Is governance of transboundary waters changing to integrate a more diverse set of actors beyond centralized governments? If so, what is the role of non-central state actors in contributing to innovations and transformative changes to transboundary water governance processes? In working towards answering these questions, the study explores the case of the Columbia River Treaty (North America) and the Lesotho Highlands Water Project (Southern Africa). This study has the following objectives: first, to determine the type of power, albeit conceived from a Euro-western perspective, that non-central state actors mobilize to engage in transboundary water governance processes, and assess if the power these actors mobilize is contributing to changes in governance. Second, to conceptualize the on-going bordering processes for transboundary water governance, and evaluate whether non-central state actors are shaping these processes. And, third, to identify which non-central state actors are involved in transboundary water governance, and examine whether and how these governance systems are becoming more polycentric. This dissertation is composed of five chapters, three of which have been prepared as standalone articles for submission to academic journals. Broadly, the dissertation findings suggest that changes to governance of transboundary waters, away from state-centric processes, may be emerging in some areas, such as the ability of non-central state actors to exercise and mobilize different forms of power to shape water governance processes. Findings illustrate that a clear distinction between international and national processes is no longer sufficient to address transboundary water governance challenges and issues. Further, findings illustrate that some non-central state actors have power and influence in these transboundary water governance processes. However, these insights also highlight that centralized government authority for transboundary waters remains, and evidence of the emergence of polycentric governance systems at the international scale is limited. / Graduate / 2019-04-30
3

A study of the impact of Lesotho Highlands Water Project on residents of Khohlo-Ntso : is it too late for equitable benefit sharing?

Letsebe, Phoebe Harward 14 January 2013 (has links)
Large-scale water project development is one of the most contentious areas of infrastructure development, physically displacing an estimated 40 to 80 million people throughout the past century. Overwhelming evidence of the adverse socio-economic impacts on local communities resulting from large dam construction has called into question whether such development truly benefits the majority or, rather, serves to promote elite accumulation of wealth at the expense of marginalized peoples. One of the most glaring issues concerning large dam development is the age-old question of distribution as those living in dam areas or downstream of dammed rivers suffer a disproportionate share of costs while enjoying few benefits. Recognized by the WCD (2000) as one of seven strategic priorities in decision-making concerning large dams, benefit sharing is one way to increase equity among stakeholders. A handful of countries around the world have incorporated benefit sharing mechanisms into large-scale water and hydroelectric projects, including Lesotho. With construction of Katse Dam beginning in the late 1980s, residents of Khohlo-Ntso have a quarter of a century’s experience with Africa’s second largest water transfer and hydroelectric project, the Lesotho Highlands Water Project (LHWP). While the adverse impacts of the LHWP on rural highlands Basotho communities has been widely documented, only one other study has researched benefit sharing within the LHWP. The central aim of this study was to discover what were local residents’ perceptions of LHWP benefit sharing as a community living only 10 kilometers downstream of Katse Dam. This research utilized a qualitative case study design to gain an in-depth account of local residents’ experiences, including their level of awareness of the LHWP benefit sharing mechanism, their experiences as a downstream community and their suggestions for transforming the LHWP into a more equitable project. Triangulation of qualitative methodological research techniques was employed to collect data including in-depth semi-structured interviews, focus groups and primary document analysis. The main findings of this study were that after living with Katse Dam for 25 years, local residents of Khohlo-Ntso are still unaware of their rights under the LHWP Treaty, do not know about the LHRF and have little hope of sharing benefits of the project.
4

The ecological economics of inter-basin water transfers: the case of the Lesotho Highlands Water Project

Matete, Mampiti Elizabeth 05 June 2006 (has links)
This study developed a general framework that can be applied to integrating environmental sustainability aspects into economic development planning in the case of exploiting water resources through inter-basin water transfers (IBWT). Using the Lesotho Highlands Water Project (LHWP) between Lesotho and South Africa (SA), the study used the multi-country ecological social accounting matrix (MC-ESAM) for Lesotho and SA to integrate ecological implications of the LHWP with the economic benefits of the project. The study further used the developed MC-ESAM multipliers to analyse the impact of lost ecological services downstream the LHWP dams in Lesotho on the wellbeing of households directly affected by the project in Lesotho and the general economies of Lesotho and SA. The MC-ESAM multipliers were also used to analyse different policy scenarios aimed at compensating affected households in Lesotho for ecological losses. The results revealed that while the LHWP has significant direct and indirect benefits in terms of social and economic development in Lesotho and SA, the project has serious unitended impacts on ecological resources and services, with resultant deleterious wellbeing implications for populations residing within the reaches of the LHWP rivers and downstream the LHWP dams in Lesotho. The results from the MC-ESAM multiplier analysis indicated that not only the income of populations directly affected by the project in Lesotho is likely to fall, but also that of other households and social groups, as well as the general economies of Lesotho. Also, because of economic dependence of Lesotho on SA in terms of imports, SA will also loose. The policy simulation results showed that compensating the ecological losses would greatly improve the welfare of directly affected populations and the rest of Lesotho economy. The empirical analysis and policy simulations results showed relatively small impacts in general, but were significant for groups of people directly affected by the project in Lesotho. The study demonstrated the importance of integrating ecological consequences into impact assessment of IBWT before such transfers can be implemented to ensure Pareto optimality and of considering economy-wide impacts and multi-sector, multi-country linkages associated with IBWT for a holistic impact assessment of IBWT. / Thesis (PhD (Agricultural Economics))--University of Pretoria, 2007. / Agricultural Economics, Extension and Rural Development / unrestricted
5

A critical assessment of the impact of involuntary resettlement on the lives of Basotho people : the case study of Lesotho Highlands Water Project, Lesotho.

Sephula, Bakoena Augustine. January 2011 (has links)
The aim of this research project is to explore the socio-economic and environmental effects experienced by the relocated population at Lesotho Highlands Water Project (LHWP). Large dams are constructed for irrigation, generation of hydroelectricity, consumption and so forth. In the case of Lesotho, the LHWP was constructed with the purpose of selling water to South Africa to earn royalties and generate hydroelectricity. Despite the fact that a number of factors are advanced to justify the construction of large dams, phenomenal experience has shown that the consequences emanating from their construction are sometimes irreversible and painful, for instance resettlement. This research study therefore sought to investigate the socio-economic and environmental impacts experienced by the affected community emanating from LHWP resettlement programme at Ha Thetsane and Ha Makhalanyane; whether the standard of living of resettlees as measured in terms of access to services has improved or not; the extent of their participation in the resettlement programme; their perception on their standard of living; the extent to which the people have adapted to their forced removal from their homelands; investigate the compensation process; and make tailored recommendations concerning the environmental impacts of involuntary resettlement on the lives of the Basotho people. Qualitative approach was used to collect both primary and secondary data. Literature review was undertaken to provide background information to the problem statement, the methodology design, the theories and other factors used to justify the construction of large dams. The existing literature led to a deeper understanding of the impacts of larger dams, reaction towards construction of large dams and Lesotho’s experience regarding the construction of large dams. Interviews were also conducted. The data collected were written into descriptive analysis form. The resettlement programme at Ha Thetsane and Ha Makhalanyane has resulted in both positive and negative impacts. The study has concluded that there is a need to engage all the stakeholders affected by involuntary resettlement through a transparent public participation process; consider more sustainable means of livelihoods; furnish resettlees with information on the options to enable them to make informed decisions; fulfil promises in order to build trust with the resettlees. / Thesis (M.Soc.Sc.)-University of KwaZulu-Natal, Durban, 2011.
6

A review of environmental assessments undertaken for phases 1A and 1B of the Lesotho Highlands Water Project.

Musasa, Naison Telmore. January 2000 (has links)
The construction of large dams has become a contentious issue throughout the world. Environmentalists, human rights activists, NGOs, academics and local communities have all contributed to the debate. On the one hand, proponents have highlighted the role of dams in alleviating poverty, improving the quality of life of communities, and their positive impact on local and national economies. Opponents of large dams have argued that the negative impacts on the environment and local communities outweigh any perceived benefits. Methods for assessing the environmental impact of large projects have been used since the 1970's. By 1988 most of Europe had adopted methods such as environmental impact assessment for evaluating the impact of proposed projects. These procedures aim to inform decision makers and authorities of the potential impact that a proposed project may have. World financial institutions, such as the World Bank, have also adopted the use of these assessment methods as part of their evaluation of projects that are seeking funding. This research establishes the environmental standards and requirements that were in place internationally, nationally and regionally, during the planning, design and implementation of Phase 1A and Phase 1B of the Lesotho Highlands Water Project. The products of the environmental investigations during successive phases of the project (1986-1999) are assessed to establish whether the parties involved conform to these standards. In addition, the research highlights affected communities' experience of the project implementation, as well as the impact of the project on their lives. The research suggests that in the early phases of the Lesotho Highlands Water Project (feasibility and Phase 1A), studies failed to meet environmental assessment standards and requirements, Studies undertaken during Phase 1B represent a considerable improvement and conform more closely to World Bank standards. Although the participation of interested and affected parties has improved, there still appear to be areas of major concern to affected communities. The study highlights the need for greater transparency during the assessment phase of projects, and in particular, more effective involvement of the local communities. Future environmental assessments of this nature are likely to be subject to more stringent requirements including the systematic assessment and quantification of downstream impacts and the incorporation of the costs of all impacts in the project costs. Further phases of the Lesotho Highlands Water Project, will therefore need to demonstrate environmental sustainability in the long term. / Thesis (M.Sc.)-University of Natal, Pietermaritzburg, 2000.
7

Participatory development : a case study of the Lesotho Highlands Water Project, Phase 1.

Mofokeng, Retšepile Mary-Antoniette. January 2013 (has links)
Development stakeholders globally argue that participatory development is the best model of development strategy in achieving sustainable, self-reliant development. This is one of the major tools of democracy used by democratic governments. This type of development strategy asserts that if people decide on their own development and if development becomes personcentred, there is a high possibility of successful and sustainable development projects within communities. It should be understood that participatory development involves people’s participation in development projects from the adoption stage of project to monitoring and evaluation of those projects. In Lesotho, lack of participatory development in development projects is reflected in environmental impact assessment reports by a number of developers. In these reports, participatory development and beneficiary empowerment are not regarded as valuable. It seems empowerment and capacity building is on the margins of the government and developers in Lesotho. This study addresses issues of participatory development with the focus of the Lesotho Highlands water project. It provides a critical examination of the events around the project from its conception, the beginning of the construction of phase one of the project to the end of this phase. The study then provides a critical analysis of the treaty of the Lesotho Highlands Water Project signed in 1986 with much reflection on participatory development and all it entails. / Thesis (M.Sc.)-University of KwaZulu-Natal, Pietermaritzburg, 2013.
8

The transnational role and involvement of interest groups in water politics : a comparative analysis of selected Southern African case studies

Meissner, Richard 07 September 2005 (has links)
This study focuses on the transnational role and involvement of interest groups in the water politics of two Southern African international river basins – the Kunene and Orange Rivers. The thesis is in part based on the theory of social constructivism, with the purpose of investigating the extent to which the collective transnational activities of interest groups, regarding the implementation of WRMPs in selected Southern African international rivers, lead to the undermining of the acceptance of the actions and policies that are authorised at the state level of world politics. Two case studies were analysed namely the proposed Epupa Dam and the Lesotho Highlands Water Project (LHWP). Regarding the problem statements and the chosen theoretical approach, a number of findings were made. Firstly, interest groups posed a substantial challenge to the national and international ‘agential power’ of the states., although the erosion of the policies initiated at the state level differed in respect of the two cases. In the Kunene River basin, the interest groups have moderate international ‘agential power’ and moderate to high domestic ‘agential power’. Namibia’s international and domestic ‘agential power’ is substantially lower than that of the interest groups, mainly on account Angola opposing plans for a dam at Epupa. In the Orange River basin, the interest groups have high domestic ‘agential power’, especially the Lesotho interest groups, and moderate international ‘agential power’. The reason for the high domestic ‘agential power’ of the Lesotho-based interest groups is Lesotho’s reflexive ‘agential power’. This reflexivity is a direct consequence of Lesotho’s changing identity from a politically unstable to stable state. South Africa’s international and domestic ‘agential power’ is higher than that of the interest groups, mainly because the South African government went ahead with plans to construct the LHWP in an era where there was little opposition to the project. Since there was no interest group involvement during the planning phase of the LHWP from 1956 to 1986, there was no interest group challenge of the LHWP. Also, the interest groups could not effectively challenge the economic power of South Africa. Furthermore, the ANC changed its stance from being anti-LHWP in the 1980s to pro-LHWP when it became the ruling party. This meant that the Project was backed by the ruling party’s ideological power. Thus, it was concluded that interest groups had a significant role and influence on the water politics regarding the WRMPs in the international river basins of Southern Africa. The thesis contributes to the body of research on water politics in a number of ways. First, the study contributes to an understanding of the reasons why interest groups are transnationally involved in water politics and of the roles they play in this process. Second, a theory of water politics (hydro-normative commensalism) was developed, that primarily focuses on the role of norms in water politics. Third, a new definition of water politics was developed, stating that water (hydro-) politics is the transnational interaction, through norm creation and utilisation, between a plethora of non-state and state actors, varying from individuals to collectivities, regarding the allocation and use of, and perception towards domestic and international water resources. The relationship between the state and interest groups is increasingly transnational because of a diminishing capacity of the state to insulate itself from the influences of non-state actors regarding the implementation of policies. / Thesis (DPhil (International Politics))--University of Pretoria, 2006. / Political Sciences / unrestricted
9

The perception of the community on the socio-environmental impacts of Metolong dam and reservoir in Lesotho

Sekamane, Thabang 12 1900 (has links)
In the Kingdom of Lesotho, large dams are currently being constructed with the sole purpose of selling water to the Republic of South Africa, in order to earn royalties and to generate electricity for Lesotho. The focus of this study was to investigate the perception of the community on the socio-environmental impacts of Metolong Dam and Reservoir in Lesotho. A qualitative research methodology was adopted and grounded theory was used in collecting data from the study area. Qualitative research techniques used were document analysis, field notes and semi-structured interviews. After conducting an audit which evaluated the accuracy of the initial Environmental Impact Assessment (EIA) by comparing actual to predict impacts, it was found that the perceptions of the community on the socio-economic impacts of Metolong project were: the community had poor education due to expensive school fees and their level of education did not help with dynamics on climate for they are complex and not easily to be understood, alcoholism existed due to unemployement, cultural constraints existed dominated by the patriarchal structures on the land and decision making, compensation policy was not honoured by project developers, the project brought benefits and loss of life-support resources, people are unable to grow wheat, beans and peas for their fields are taken and the community experienced loss of building sand that is not addressed. Information obtained helped the study to close the gap which appears not to have been addressed by the Government of Lesotho Department of Water Affairs Lowlands Water Supply Unit, 2008. Results of the study revealed that local villagers in the study area were happy with the project benefits, but they were discontented with the project as they were not incoporated in the management and supervision of the project. Rather, the local villagers were engaged only as labourers. The study recommends that when large dams are constructed, local villages should not be given promises that are dressed with many enticing commitments. The reason is that, communities never asked for the project, but it is set forth authoritatively as obligatory upon them. Project authorities should increase their efforts to fulfil promises made. Not only that, they should have respect, compassion, care and dedication when dealing with affected people. It is in this regard that the Local Based Project Execution and Observation Model is proposed, which will incorporate local villagers in the management steps of all large dam developments within their communities, in order to contend with environmental impacts of large dams. / Environmental Sciences / Ph. D. (Environmental Management)

Page generated in 0.0961 seconds