Spelling suggestions: "subject:"links""
31 |
Tvorba štíhlého podniku / Creating a Lean CompanySmrčková, Iveta January 2019 (has links)
This master‘s thesis is focused on ways, which are aimed at increasing the overall equipment effectiveness in the conditions of a particular business subject. This is the Logaritma a.s., which focuses on the automotive industry. The content is an analysis of the current status and overall equipment effectiveness for the entire enterprise and on the concretely chosen assembly lines. For specific assembly lines is proposed to solutions to establish equipment efficiency, using methods used in lean company. Theoretical solutions are defined.
|
32 |
Projekt automatizace manipulace s písty / Project automation of manipulation with pistonMužíková, Markéta January 2019 (has links)
This diploma thesis deals with solution of project automatization of manipulation with piston. On the basic theoretical knowledge about Bosch Company and terms connected with automatization in industry is tied up with detailed description of actual state of solution, which presents workplace as the thesis issue. After that follows the project of processes containing time simulations and description of variants of the solution, from which is selected the best one. The selected variant is descripted in a special chapter, where is analysed the concept of optimized workplace with its elements of automatization and its parts. Workplace is appraised by technical-economic way, where is included the project calculation of backflow. In last point is made risk analysis used for reduction of risks and increase of the workplace safety.
|
33 |
Použití standardu ISA 95 pro část výrobní linky / Using of ISA 95 for part of the production lineHorák, Lukáš January 2021 (has links)
This thesis deals with the design and implementation of the ISA-95 standard on a newly created production line. The standard and its models are described in the theoretical part, following with the individual selected software solutions, which were used for the standard’s application. Subsequently, a description of the construction and program tools of both devices, which by physical arrangement and their connection create the production line, is provided. The next part of the thesis deals with the design and application of a batch control process. This is the basis for an ISA-95 standard implementation, which uses specific software resources for data acquisition and visualization. A functional verification of the production line and realized design was done within the last part. The conclusion presents an evaluation of production based on analyzed data from the test production.
|
34 |
Moderní algoritmy posunu výšky základního tónu a jejich využití ve virtuálních hudebních nástrojích / Modern pitch-shifting algorithms and its aplication in virtual musical instrumentsKřupka, Aleš January 2011 (has links)
This diploma thesis deals with pitch shifting methods of acoustical signals. The theoretic part of this thesis involves description of three different pitch shifting techniques, these are the method using a modulated delay line, PICOLA method and method using a phase vocoder. The first two methods represent the processing in time domain, the third method represents the processing in frequency domain. In relation with the PICOLA method, the thesis also mentions algorithms for pitch estimation. The practical part demonstrates the use of these methods. There is described a sampler virtual musical instrument based on the playback of the sounds stored in memory. In this part the particular units providing the required functionality are described. The generating of sounds is controlled by the MIDI protocol. In the sampler is implemented the PICOLA method.
|
35 |
Systém směrování na více bran pomocí směrovače Mikrotik / Multigateway routing system based on the Mikrotik routerStraník, Jan January 2012 (has links)
This thesis deals with the routing of data traffic to multiple gateways with a network operating system MikroTik RouterOS, which has become widespread in the small firms and home users. It is aimed to describe the problem with using multiple gateways. RouterOS description itself and its core components needed to solve this issue, such as routing, packet marking and quality assuranceservices. It also deals with the description of the particular design and testing. The proposedsolution is verified on the example of a real situation. Finally, the proposed solution is compared to alternative solutions, commonly used in practice.
|
36 |
Anamorfní mapy v MHD / Schematic maps of Public Transport SystemKriške, Petr January 2013 (has links)
This diploma thesis is focused on creating schematic maps and their using in public transport system. It describes methods of making and individual variations of these maps. Further, the thesis is trying to evaluate and classify the available czech and world cartographic works with this content. Based on this analysis are proposed the new alternative solutions of schematic map in public transport in Nový Jičín.
|
37 |
Projekt zabezpečení chodu poloautomatické linky na výrobu plastových oken / Operational project of semi-automatic line for production plastic windowsHorák, Aleš January 2009 (has links)
This diploma thesis deals with plastic windows semi-automatic production line in the company RI-Okna. The system of storage, handling and weaknesses of the production line are described. The solution is fleshed out into a technological project, including economic evaluation and technical drawings.
|
38 |
Identifikace a hodnocení chyb na výrobní lince a jejich prevence / Identification and assessment of errors in the production line and their preventionLanger, David January 2011 (has links)
The manufacturing companies are faced to the strong pressure to decrease the production costs. They are therefore forced to optimize the manufacturing processes and to increase their efficiency. The ideal way to increase the productivity is to optimize the manufacture by increasing the efficacy of the equipment, material, working hours and other sources of finding out causes of wasting in production, it means to abolish the causes of making mistakes.
|
39 |
Optimalisace výrobně-montážní linky / Optimization of the production-assembly lineDoležal, Zbyněk January 2011 (has links)
This work deals with the way of balancing production-assembly line, which would minimalize set up costs. The production-assembly line shall allow assembling more mutually similar variants of the same product. The time of duration of each operation is constant, but can differs between individual variants of the product. Cycle time is related to the variant of the product.
|
40 |
Návrh inovace montážní linky termostatických hlavic ve firmě Honeywell / Assembly line innovation project for thermostatic heads at HoneywellFical, Karel January 2012 (has links)
The object of this work is to propose innovative solutions on the assembly line in company Honeywell. Optimization of this line will be achieved by changing the concept of calibration. The current stabilization in air-conditioned chamber will be replaced by operational calibration incorporated in the assembly line, which will depend on ambient temperature. This work will be mainly contained a description of the current status, the proposed changes and economic evaluation.
|
Page generated in 0.0504 seconds