• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 3
  • 3
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Fuktvandring i putsade lättbetong- och tegelfasader : En undersökning om hur fukt vandrar och beter sig mot en putsfasad av två olika material med olika porositeter. / Moisturetransport in aerated concrete- and brickfacades : A study of how moisture behave and transports in a facade of two different materials with different porosities

Hägg, Marcus, Sjölund, Henrik January 2013 (has links)
I dagsläget finns en stor mängd byggnader i Sverige där fasaden består av puts direkt anliggande mot antingen lättbetong eller tegel. Dessa fasader kan skapa problem för brukaren p.g.a. fukttransport via putsen direkt in i konstruktionen. Problemen som kan uppstå som följd av dessa konstruktioner är inte bara estetiska utan kan även påverka inomhusmiljön. Syftet med detta arbete var att undersöka om det gick att med ny teknik visa de resultat som framkommit från erfarenheter från praktiskt arbete samt undersöka hur en renovering påverkar de fasader som består av puts direkt mot lättbetong eller tegel. Arbetet har utförts med hjälp av simuleringsprogrammet Wufi Pro för att sedan analyserats med hänsyn till fukttransporter och vatteninnehåll. Resultaten som framkommit påvisar en förhöjd risk för problem med de ursprungliga fasaderna samt slutsatsen att en renovering enligt ett av de två förslagen är att föredra. / Today there’s a great deal of buildings in Sweden where the facade is constructed by plaster directly connected to either aerated concrete or masonry brick. These facades could create problems for the user on accord of the moisture transport via the plaster directly into the construction. The problems that could follow these types of facades aren’t just esthetical but could also affect the indoor environment. The purpose with this study was to examine if it would be possible using today’s technology to show the results coming from past experiences by practical work, and at the same time examine how a remodel affects the facades that consists of plaster directly on aerated concrete or masonry brick. The work has been conducted with the simulation program Wufi Pro, later to be analyzed  according to moisture transport and water content. The results that came from this has shown an increased risk for problems with the original facades and at the same time that a remodel according to one of the two proposed remodel ways to prefer.
2

Penzion / Pension

Daňková, Zuzana January 2014 (has links)
The thesis dealt with the reconstruction of the existing farm buildings. After a complete reconstruction of the object it will serve as a guest house with training center. The equipment includes the restaurant with its own kitchen facilities and building will be completed by the wellness center, which will be located in the new part of development. Object of wellness center will probably be completely resolved in the construction phase B. The property is located in the village Býkovice, Býkovice (616524 ), house No. 30, No. 82, land parcel numbers: 120/1 , 120/2 , 121/1. That object will consist of three floors, one floor is partly underground, further aboveground floor which will be directly accessible from the northern part and attic. The total built-up area will be approximately 526 m. Ridge height is 5,250 m and 3,840 m. The building is based on the existing foundations and the new wellness center is based on the footings of plain concrete C16/20. The base concrete slabs will be made new in the entire building, reinforced with KARI networks 150x150x6. Peripheral bearing and interior bearing walls remain largely preserved (masonry, brick, stone and mixed). New structures will be designed in Porotherm and added with light rails Fermacell (SDK). The steel-concrete ceiling and ceiling in the new part will be made of Porotherm. The staircase is made of steel, staircase. The roof is gabled house (main building) and desk (east wing), above the training center is also gabled roof. All roofs are fitted with metal roofing.
3

Nová Jižní čtvrť a její propojení s řekou Svratkou / New South District and its Connection to Svratka

Nedbalová, Monika January 2019 (has links)
Brno has been considering moving the Main railway station for several decades. Countless urban plans have been done through several competitions, the new South District, which will be located north direction of today's Dolní nádraží station in the future. The architectural study, which was the subject of this diploma thesis, designs multifunctional object called Platform. The building could become part of the emerging South District. The base for the architectural study of the Platform was urban concept of South District designed by me as a pre-diploma thesis. The significance of the South District is comparable to the new Main Railway Station in Vienna surrounded by new district. Those opportunities were the foundation for designing compact urban structure with great variability of public spaces and buildings themselves. The new building is located on the Route of experiences, which is an alternative lane to the main boulevard from the Main Station to the centre of Brno. That starts at the railway station, leads through South District and its main square, the waterfront, through the islands of Svratka, to the park next to the river. Lane continues to the rediscovered railway viaduct and further to today's Main railway station. The viaduct was an inspiration for the architectural design, in the sense of material and shape. The mass of the building itself is divided horizontally into two parts. The lower, heavy masonry brick part of the market is visually separated from the upper objects that seem to levitate above the market. These three upper masses grow from the green roof of the market. Their function is already evident due to their facades. Upper part belongs to the two apartment buildings with a regular grid of south-west orientated windows and one coworking facility located in the northern corner of the Platform. The location of the building is significant. The views from the Platform are amazing - one side there is the Svratka River with island

Page generated in 0.0586 seconds