• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • 1
  • 1
  • Tagged with
  • 3
  • 3
  • 3
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Optimalizace uspořádání technologických pracovišť ve společnosti Slovarm / Optimal layout of technological workplaces at Slovarm

Podzámsky, Ján January 2012 (has links)
The purpose of this thesis is the layout optimalization of workplaces within the firm Slovarm Ltd., which was successfully done. By using the procedures of technological design was made the layout, which is based on requirements of company management. The process of solving problems was preceded by a theoretical clarification and explanation of basic concepts, as well as the characterization and technical description of the company as a whole. Subsequent analyses showed different variants from which was chosen the best one. It was elaborated in details and its positive effects were measured in technical-economic evaluation.
2

EFFEKTIVISERING AV BYGGLOGISTIK: TRANSPORT- OCH MATERIALFLÖDE : En fallstudie vid Årstastråket (Etapp 1) i Stockholm

Basharkar, Wahidullah January 2015 (has links)
The purpose of this study is to examine how construction logistics work for the ongoing project “Årstastråket” Stage 1, and to identify the logistics problems that the project may have. The aim then is to find solutions to these problems in order to avoid them in the upcoming projects. The study will include delopment of a standard template that can be used in logistics planning of the project. At the beginning of the study a comprehensive literature review of the available literature including reports and research articles was done to obtain a deeper knowledge of the subject in question. The result of this study is based on conducted case studies on the construction site, such as interviews and site visits. The majority of collection in the case study was mainly collected from 11 site visits, which then was supplemented with the information obtained from the interviews. The interviews were conducted with the local manager and supervisor of the project at “Årstastråket” Stage 1. In this study the construction logistics worked generally well, both in terms of transport- and material flow at the construction site. The main logistics problems identified in “Årstastråket” Stage 1 was particularly poor logistics planning of the project at an early stage, lack of visual communication and constant updating of construction site plan alongside project developing. The new developed standard template for logistics planning of the project at an early stage can be used in order to achieve the established goals and make the project even more effective.
3

Studie výrobní logistiky se zaměřením na plynulé materiálové toky / The Study of Production Logistics Focused on Continuous Material Flow

Štenclová, Jana January 2012 (has links)
This diplom´s thesis is focused on areas of logistics and invetory management in manufacturing company, which are both important parts of business. The object of this thesis is analysis of activities which are connected with material flow. Theoretical part describes basics of logistics and material flow. Practical part deals with methods, which could help the company optimize costs for material elements and make the relationships between suppliers and customers more effective.

Page generated in 0.1315 seconds