Spelling suggestions: "subject:"efterbearbetning"" "subject:"förbearbetning""
1 |
On adhesion and galling in metal forming /Hanson, Magnus, January 2008 (has links)
Diss. (sammanfattning) Uppsala : Uppsala universitet, 2008. / Härtill 6 uppsatser.
|
2 |
Interaction between the alloying content, cast structure and forging process for large ingots /Sarnet, Jan. January 2005 (has links)
Licentiatavhandling (sammanfattning) Stockholm : Tekniska högskolan, 2005. / Härtill 5 uppsatser.
|
3 |
On the analysis of cast structure and its changes during hot working of forging ingots /Sarnet, Jan. January 2009 (has links)
Diss. (sammanfattning) Stockholm : Kungliga Tekniska högskolan, 2009. / Härtill 6 uppsatser.
|
4 |
Modelling and simulation of metal working processes /Nilsson, Annika, January 1900 (has links)
Diss. (sammanfattning) Luleå : Tekn. högsk., 2001. / Härtill 7 uppsatser.
|
5 |
Optimization of sheet metal forming processes /Jansson, Tomas, January 2005 (has links) (PDF)
Diss. (sammanfattning) Linköping : Linköpings universitet, 2005. / Härtill 5 uppsatser.
|
6 |
Wear mechanisms in sheet metal forming : effects of tool microstructure, adhersion and temperature /Gåård, Anders, January 2008 (has links)
Diss. (sammanfattning) Karlstad : Karlstads universitet, 2008. / Härtill 8 uppsatser.
|
7 |
Wear in sheet metal forming /Gåård, Anders, January 2008 (has links)
Licentiatavhandling (sammanfattning) Karlstad : Karlstads universitet, 2008. / Härtill 5 uppsatser.
|
8 |
Closed-die forging and slab hot rolling with focus on material yield : some industrial problems analysed by FEM,Ervasti, Esa, January 2008 (has links) (PDF)
Diss. (sammanfattning) Stockholm : Kungliga Tekniska högskolan, 2008. / Härtill 5 uppsatser.
|
9 |
Dimensionering och optimering av ett solcellssystem för en industribyggnad i Mellansverige : En simuleringsstudieÖstlund, Christine January 2019 (has links)
Vid omställningen till förnybara energisystem är solkraften som energikälla ett möjligt alternativ, för att uppnå klimat och energimålet med 100% förnybar energiproduktion år 2040. Detta är något regeringen eftersträvar genom infört bidrag i form av subventioner och skattereduktion vid installation av solceller. I denna fallstudie undersöks vilken effekt två olika solcellssystem har för en industribyggnad i Mellansverige, där studien tar hänsyn till ekonomisk-, teknisk- och klimatrelaterade aspekter. Systemen dimensioneras i strävan av optimala förhållanden samt av byggnadens begränsningar, med kostnadsförslag från en lokal återförsäljare få en bild av om återbetalningstiden är motiverande i frågan. Den lokala klimatpåverkan analyseras med växthusgasutsläpp i fokus, detta genom resultat av litteraturstudie. Dimensioneringen av solcellssystemen baseras på empiriskt material av studieobjektet och simuleras i programmet Winsun PV. Studien resulterade i två storlekar på system med tillhörande kostnadsförslag som ligger till grund för återbetalningstiden. System fall 1 dimensionerades i syfte att hålla den nominella systemeffektens storlek till 255 kWp, detta för att undgå extra energiskatt. Systemet gav ett årligt utbyte av 228 MWh/år som gav återbetalningstid mellan 18 – 22,5 år. Systemet simulerades med optimal lutningsvinkel av 39° i 15° azimutriktning av modulerna. System fall 2 dimensionerades till 1200 kWp i syfte att täcka effektivt användbar takyta, med årligt utbyte på 886 MWh/år och återbetalningstiden blev mellan 22,5 – 25,1 år. Modulerna simulerades med takets lutning ±4,7° i -15° azimutriktning. För att solceller ska ge ett mer lönsamt utbyte i högre latituder krävs en vidare effektivitetsutveckling för solcellstekniken samt ett förlängt investeringsstöd från Länsstyrelsen för framtida installationer. Om solcellssystemet ger en positiv inverkan på det ekologiska fotavtrycket beror av vart solcellen är tillverkad samt vilken elmix som byts ut mot den producerade solenergin. / When converting to renewable energy systems, solar power as an energy source is a potential option; in order to achieve the climate and energy goal with 100% renewable energy production in year 2040. This is something the government try to achieve by making installation of solar cells more attractive through allowances such as subventions and tax reduction. The aim of this study was to analyze the effect of solar cell system on an industrial building in the midst of Sweden, in regard of economical-, technical- and climate related points of view. This was performed by replacing purchased electricity with locally produced electricity, where optimal circumstances for the solar power systems and the limits of the building has been taken into consideration during the dimensioning. With cost suggestions from a local authorized dealer the magnitude of the pay off time as a motivating factor was estimated. The local climate impact will be investigated through a litterature study, focusing on green house gas emissions. The dimensioning of the solar cell systems were based on empirical input from measurements in combination with documented data regarding the industrial building and simulated in the program Winsun PV. The study resulted in two different-sized systems with cost sheets that formed the basis for the calculated pay off time. System case 1 was dimensioned to keep the size of the nominal system effect to 255 kWp, this to avoid extra energy tax. The system gave an annual exchange of 228 MWh / year which gave the repayment period between 18 - 23 years. The system was simulated with an optimum angle of 39 ° in 15 ° azimuth direction of the modules. System case 2 was dimensioned to 1200 kWp in order to cover the effective usable surface of the roof, the system gave an annual exchange of 886 MWh / year and the repayment period was 22.5 - 25.1 years. The modules were simulated with the roof slope ± 4.7 ° in -15 ° azimuth direction. A further efficiency development for solar cell technology is required as well as an extended investment support from the County Administrative Board, to provide a more profitable exchange of solar cell systems in higher latitudes. If the solar cell system has a positive effect on the ecological footprint depends on where the solar cell is made and which electrical mix replaced by the produced solar energy.
|
10 |
Effektivisering av tillverkningsprocess med mjukvara för nesting / Effectivizing a manufacturing process with nesting softwareLundgren Akbarzadeh, André January 2023 (has links)
Rapporten presenterar ett examensarbete vid Kungliga Tekniska Högskolan, utfört på ett företag i skylttillverkningsindustrin. Syftet med examensarbetet är att undersöka om produktionen på det uppdragsgivande företaget kan effektiviseras genom att ersätta ett manuellt arbetsmoment med en automatiserad lösning i form av en mjukvara. Det undersöks även om, och i sådant fall hur stora förbättringar som kan göras i processen sett till ekonomisk, ekologisk och social hållbarhet. Genom att undersöka marknadens utbud av mjukvaror för nesting och jämföra mjukvarornas egenskaper mot definierade krav kunde en handfull mjukvaror konstateras vara relevanta. Testprogramvaror begärdes för dessa, och i de fall de erhölls så testades mjukvarorna på rådata från projekt som företaget tidigare tillverkat i syfte att jämföra resultaten. Skillnaderna i resultat beräknades och jämfördes med resultaten av det manuella arbetssättet. Det konstaterades att användning av den bäst presterande mjukvaran kan spara företaget i snitt 481 kronor per projekt i minskad material- och tidsåtgång. Vidare beräknades att företaget hade kunnat spara drygt 28 kg material på de fem projekten som tillverkades i aluminium, för vilka bara återvinningen hade kostat ca 2,25 kg koldioxidekvivalenter per projekt. Nyproduktionen av denna aluminium uppskattas motsvara mellan 16,6 – 36,2 kg koldioxidekvivalenter per projekt. / This paper presents a bachelors thesis at the Royal Institute of Technology, performed at a company in the sign manufacturing industry. The aim of the thesis is to investigate if the production at the company can be made more effective by replacing a part of the process that requires manual work with an automated solution in the form of a software. It is also investigated whether changes in the process can result in improvements in economical, ecological and social sustainability, and in that case the greatness of the improvements. By conducting market research of nesting software and comparing the properties of the software to pre-determined requirements, a handful of different software were considered potentially applicable. Software for testing were requested for these, and tests were conducted with those that were obtained. The tests were conducted on raw data from previously manufactured projects at the company in order to compare the results. The differences in results were calculated and compared with those of the manual process. It was concluded that the top performing software could render the company an average of 481 kronor saved per project in terms of time saved and material usage. Furthermore, calculations showed that the company could have saved over 28 kg worth of material for the five projects where aluminium was used. For these projects, the recycling of the aluminium would be equivalent to 2,25 kg carbon dioxide equivalents per kg, per project. The production of new aluminium for these projects would equate to an estimated 16,6 – 36,2 kg carbon dioxide equivalents per kg, per project.
|
Page generated in 0.0697 seconds