• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Volymbaserat underhåll / Volume based maintenance

Axelsson, Patrik, Korhonen, Sanna January 2021 (has links)
Examensarbetet utfördes på Scania Industrial Maintenance. Historiskt på Scania har intervallerna för det förebyggande underhållet (FU) på produktionsutrustningen bestämts baserat på kalenderdatum. Då kalenderdatum inte tar hänsyn till produktionsutrustningens faktiska användning så anpassas inte underhållet efter användningen. Detta kan leda till att för mycket eller för lite underhåll utförs i förhållande till användandet. Om för mycket underhåll utförs är detta kostsamt eftersom arbete och utbyten av reservdelar utförs i onödan. Samtidigt som för lite underhåll leder till att maskinerna går sönder när dom är planerade att användas vilket är väldigt kostsamt för företaget. På grund av detta önskar Scania att övergå till att utöver det kalenderbaserade intervallet även kunna bestämma intervallerna för det förebyggande underhållet baserat på produktionsvolymen. Målet med arbetet var att ta fram metoder samt process vilka beskriver hur Scanias fabriker i Södertälje, inom ramen för Future Powertrain Program (FPP), ska övergå till ett underhållsintervall baserat på volym. Dessa metoder ska sedan testas i två piloter, en pilot på Scanias axel- och växellådsmontering och den andra piloten på Scanias motorbearbetning. För att öka projektgruppens kunskap inom de ämnen vilka innefattades av projektet utfördes litteraturstudier på rapporter, artiklar och i faktaböcker. Litteraturstudier utfördes även under arbetets gång på sådant som inte täckts av arbetets initiala litteraturstudie. Utöver litteraturstudien har även en dokumentstudie utförts på företagets interna dokument och omfattade bland annat beredningsprocessen och instruktioner för Maximo vilket är det underhållsystem som används på Scania. Vidare utfördes även intervjuer av personal på Scania IM och Scania under arbetets gång då projektmedlemmarna önskade få insikt i verksamheten och de befintliga arbetssätten. Genom att avgränsa arbetet har fokuset legat på att realisera teorin på ett mindre område för att undersöka ifall denna omställning är möjlig att genomföra. De utvalda pilotområdena på DT och DM studerades i avseende på både organisation och produktionsutrustning. Dessa studier tillsammans med projektets litteraturstudie och dokumentstudie låg sedan som grund vid framtagandet av metoderna. De inom projektet framtagna metoderna testades i pilot på de utvalda områdena och utrustningarna. Piloterna vilka utfördes inom projektet var lyckade och Scania har som avsikt att inte återgå utan i stället utvidga områdena där projektets framtagna metoder ska användas. Resultatet av detta arbete är att det kommer utföras ett mer exakt underhåll i förhållande till det kalenderbaserade underhållet. Projektgruppen kunde även konstatera att säkerheten i verkstäderna skulle kunna höjas vid tillämpning av projektets framtagna metoder. Detta då underhållet som utförs på t.ex. nödstopp eller andra säkerhetsfunktioner utförs i proportion med utrustningens användning, därmed kan säkerheten säkerställas även vid höga produktionstakter. Metoderna framtagna inom projektet tar hänsyn till ifall utrustningen omfattas av garanti eller myndighetskrav. Dessutom tar de hänsyn till förebyggande underhållets längd och om FU:t omfattar ronder, underhåll för operatörer (UFO), periodiska utbyten eller säkerhet. Alla dessa faktorer påverkar vilka åtgärder som ska vidtas på det kalenderstyrda och volymbaserade FU:t vilket resulterar i en anpassad och förbättrad FU plan. / The thesis project was performed at Scania Industrial Maintenance. Historically, the intervals of the preventive maintenance for the production equipment have been determined based on calendar dates. As the calendar date does not take the actual use of the production equipment into account the maintenance is not adapted to this use. This could lead to either too much or too little maintenance is being performed in relation to the use of the equipment. When too much maintenance is performed, work and replacement of spare parts are performed when not needed which brings unnecessary costs for the company. At the same time, too little maintenance will instead lead to breakdowns when the machines are planned to be used, which could be very costly for the company. Because of this, Scania now wishes to proceed to determine the intervals for the preventive maintenance based on the production volume. The objective of the work was to develop methods and processes that describe how Scania's factories in Södertälje, within the framework of the Future Powertrain Program (FPP), will transition to a maintenance interval based on volume. These methods shall then be tested in two pilots, one pilot at Scania's axle and gearbox assembly and the other pilot at Scania's engine processing. To increase the project group's knowledge of subjects covered by the project, literature studies were carried out on reports, articles and in fact books. Literature studies were also performed during the course of the work on subjects that were not covered by the work's initial literature study. In addition to the literature study, a document study was also performed on the company's internal documents and included, among other things, the preparation process and instructions for Maximo, which is the maintenance system used at Scania. The project group also conducted interviews with staff at Scania IM and Scania during the work as the project members wanted to gain insight into the business and the existing ways of work. By delimiting the work, the focus has been on realizing the theory on a smaller area to investigate whether this transition is possible to implement. The selected pilot areas located at DT and DM were studied with regards to both organization and production equipment. These studies, together with the project groups literature study and document study, were then used when developing the methods. The methods developed within the project were tested in pilots on selected areas and equipment. The pilots that were carried out within the project were successful and the aim for Scania now is not to return to calendar-based maintenance but instead expand the use of themethods developed by this project. The result of this work is that a more accurate maintenance will be performed in relation to the calendar-based maintenance. The project group could also state that the safety in the workshops could be increased when applying the project's developed methods. This is because the maintenance performed on e.g. emergency stops or other safety functions are performed in relation to the use of the equipment. The methods developed within the project takes into account whether the equipment is covered by warranty or regulatory requirements. They also take into account the length of the PM and whether the PM includes routes, operator maintenance, periodic exchanges or security. These factors decides which measures needs to be taken on the calendar-controlled and volume-based PM, which results in an adapted and improved PM plan.

Page generated in 0.0863 seconds