• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 26
  • 10
  • 1
  • 1
  • 1
  • Tagged with
  • 39
  • 39
  • 24
  • 24
  • 16
  • 11
  • 9
  • 9
  • 8
  • 7
  • 6
  • 6
  • 5
  • 5
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Influência da incerteza dos teores no planejamento de lavra aplicado ao sequenciamento de longo prazo

Cherchenevski, Pablo Koury January 2015 (has links)
O mapeamento da incerteza dos teores através de métodos de simulação geoestatística é uma metodologia que está começando a ser amplamente utilizada na indústria mineira. No entanto, o uso correto desse intervalo de incerteza para os processos subsequentes à avaliação de recursos ainda carece de entendimento e aplicação no setor industrial, onde o modelo de krigagem é empregado para o planejamento de mina. O sequenciamento da produção de longo prazo, com o objetivo de maximizar o Valor Presente Líquido (VPL), é uma das etapas mais importantes no planejamento de lavra e, portanto, o acesso à informação da variabilidade dos teores torna-se de grande importância permitindo a maximização dos lucros e da extração dos recursos. O objetivo deste estudo é avaliar o impacto da incerteza geológica no planejamento de lavra de modo a definir um sequenciamento a partir das simulações. Para isso ser alcançado, propõe-se uma análise probabilística incorporando as incertezas dos teores no sequenciamento de lavra, e quantificando, através de um índice de classificação proposto no estudo, os potenciais ganhos e riscos de perda associado a cada cenário sequenciado. O método de co-simulação por bandas rotativas é utilizado para gerar cenários equiprováveis. Em seguida, o sequenciamento de lavra é definido para cada cenário de teor simulado utilizando um software de otimização. Então, cada sequência de extração dos blocos obtida foi reavaliada para cada simulação de teor. Além disso, um índice de classificação é utilizado para definir o sequenciamento de lavra que gera o maior VPL. Por fim, é realizada uma comparação entre a opção de planejamento selecionada pela metodologia proposta e o modelo utilizado tradicionalmente na indústria obtido a partir de interpolações lineares (krigagem) dos teores. / Mapping grade uncertainty through geostatistical simulation is becoming widely used in the mining industry. However, the proper use of this uncertainty interval for subsequent decision making processes still lacks of understanding and use, where a grade kriging model is mostly employed for mine planning. The long-term scheduling aiming at maximizing Net Present Value (NPV) is one of the most important stages in mine planning, and therefore the assessment of grade variability is of great importance and allowing maximizing profit and resources extraction. The aim of this study is to evaluate the impact of geological uncertainty in mine planning in order to define the best scheduling given grade uncertainty derived from the simulations. For this to be achieved, it is proposed a probabilistic analysis incorporating grade uncertainties in the mining sequencing and quantifying, through a proposed classification index, the potential gains and risks of loss associated with each sequenced scenario. Turning bands algorithm is used to generate equally probable scenarios. Next, it is defined the mining sequence for each grade simulated scenario using an optimization software. Then, each block extraction sequence obtained is reevaluated for each grade simulation. Furthermore, a classification index is used to select the schedule which leads to the highest NPV. Finally, a comparison is performed with the selected schedule and the one obtained using the model traditionally used based on kriged grades.
12

Sistematização do cálculo de diluição e perdas operacionais para reconciliação de teores e massas em larva a céu aberto

Câmara, Taís Renata January 2013 (has links)
Em lavra a céu aberto, a diluição nem sempre é um fator analisado e calculado sistematicamente, muitas vezes é apenas um número ajustado para atender necessidades de auditorias, por exemplo. A diluição, assim como a perda, são fatores que devem ser sempre considerados nas estimativas de teores e massas para quantificação de reservas. Estes fatores andam sempre conjugados e são determinados considerando diversas particularidades do depósito (complexidade geológica, geometria do corpo de minério, dureza da rocha, etc.) e características da operação (equipamentos, geometria de cava, habilidade dos operadores, entre outros). O principal objetivo deste estudo é a determinação de um fator de diluição que possa ser utilizado no planejamento de lavra (modelo de estimativas), levando em consideração diversas particularidades do depósito e da operação, além de considerar fatores objetivos relacionados à geometria. A reconciliação pode ser definida como uma comparação entre teores e massas estimados no modelo de blocos com as medidas reais dos teores e massas produzidos, dentro de um mesmo volume. O processo de reconciliação de teor e massa entre o planejamento e o executado atua como uma maneira para verificar se o planejamento está adequado, e se não estiver, identificar onde se encontram os problemas de falta de aderência. Além de verificar a confiabilidade dos procedimentos de construção do modelo utilizado, a reconciliação permite definir medidas corretivas e priorizá-las para aproximar os resultados entre produção e o planejamento. Para saber se o fator de diluição utilizado está correto e adequado às necessidades do depósito é necessário primeiramente, saber se existe uma boa aderência na reconciliação entre planejado e executado. Com o resultado, é possível saber quais fatores estão sendo causadores de diluição e/ou perdas de minério e onde estes estão ocorrendo. O fator de diluição pode ser uma ferramenta muito positiva se aplicado de maneira correta, já que este varia a partir de diferentes etapas ao longo do planejamento de mina, influenciando áreas a serem mineradas, orçamentos, eficiência da produção e também melhora do resultado financeiro do projeto. / In open pit mining, not always the dilution is a factor analyzed and systematically calculated, often is only a number adjusted for attending the needs of audits, for example. The dilution, as well as loss, are factors that should be always considered for tonnage and grade estimates during mine planning. These factors are always associated and can be determined considering several particularities of the deposit (like geology complexity, orebody geometry, rock hardness, etc.) and the operation itself (e.g. mining equipment, pit design, experience, among others). The main objective of this study is to determine a dilution factor that can be used in mine planning (estimation model), taking into consideration those particularities of the deposit and operation, besides considering objective factors related to the geometry. Reconciliation could be defined as a comparison of predicted grade and tonnage from the block model estimates against the effective measures of mined mass and produced ore, within a block. The reconciliation process of grade and mass of planning against executed is a way to check if planning is appropriate, and if not, identify where the problems of lack of adherence are. In addition to checking the reliability of the procedures used in the block model creation, reconciliation allows one to define corrective measures and prioritize them to optimize production and planning. To understand if the dilution factor used is correct and appropriate to the needs of the deposit it is first required knowing if there is a good adherence in reconciliation between planned and executed. With the results, is possible to know which factors are causing dilution and/or losses of ore and where they are occurring. The dilution factor can become a very positive tool if better assessed, because it varies from different locations along the mine planning, influencing areas to be mined; budgets; production efficiency and also profit increase.
13

Análise de expansão de cava com múltiplas restrições de superfície sob incerteza geológica

Kuckartz, Bruno Tomasi January 2017 (has links)
A operação e gerência de empreendimentos mineiros são tarefas normalmente difíceis e complexas. Para otimizar toda a operação, os engenheiros precisam lidar com muitos aspectos técnicos e restrições, como a modelagem geológica, estimativa de reservas, determinação da necessidade de blendagem, projeto das cavas ótimas e operacionais, custos operacionais, questões ambientais, entre outros. Nesse sentido, o posicionamento de infraestruturas de superfície é um dos pontos críticos dentro do planejamento de mina. Aproximar as estruturas da cava, com o intuito de reduzir custos operacionais, pode interferir em eventuais expansões da cava em novos e favoráveis cenários. Nesses casos, impactos no valor presente líquido (VPL) do projeto são inevitáveis e precisam ser tratados tecnicamente, avaliando um grande número de cenários alternativos para delinear uma estratégia que incremente a lucratividade do projeto. O objetivo deste estudo é avaliar, por meio de comparações de VPL entre diferentes cenários de múltiplas restrições de superfície, sob incerteza geológica, a possibilidade de mover pilhas de estéril e outras infraestruturas de suas atuais posições e/ou definir prioridades e mensurar o impacto que cada restrição representa na lucratividade do projeto. A metodologia foi aplicada a uma mina de fosfato para ilustrar como determinar a melhor alternativa em uma perspectiva de planejamento de mina de longo prazo. Utilizando o método de cavas híbridas, aplicado ao modelo de teores simulados, foi possível identificar zonas de probabilidade de ocorrência dentro da cava matemática, o que forneceu informações cruciais para auxiliar na tomada de decisão a respeito da necessidade de relocação de estruturas. / The operation and management of mining enterprises are usually difficult and complex tasks. To optimize the entire operation the engineers must deal with several technical aspects and constraints, such as orebody modelling, reserves estimation, determination of blending necessity, optimum and operational pit designs, operational costs, environmental issues, among others. In this sense, locating surface infrastructures is one of the most critical mine planning concerns. Approximating these structures to the pit, in order to reduce the operational costs, might interfere with future pit expansions in new favorable scenarios. In such cases, impacts on project’s net present value (NPV) are inevitable and must be deal technically, evaluating several alternative scenarios to delineate a strategy to maximize profitability. The aim of this study is to evaluate, through NPV comparisons considering different scenarios with multiple constraints, under geological uncertainty, the possibility of moving waste piles and infrastructure buildings from their current position and/or defining priorities to after measuring the impact that each constraint represents on the project´s profitability. The methodology will be applied to a phosphate mine, to determine the best alternative from a long-term mine planning perspective. Using the hybrid pits method, applied to a simulated grades model, allowed the identification os occurrence probability zones within mathematical pit, providing critical data to support decision making regarding infrastructure relocation.
14

Método para auxílio na definição da quantidade de minério liberado

Fontoura, Daniel Mayer January 2017 (has links)
Em uma operação mineira, a quantidade e a qualidade do minério disponível para alimentação na usina são essenciais para a continuidade e flexibilidade das operações. A quantidade de minério liberado não é considerada em softwares especialistas de sequenciamento de lavra. Geralmente quando o minério liberado é utilizado em rotinas de planejamento, a tonelagem mínima de minério liberado é definida a partir de métodos empíricos. Este estudo desenvolve uma metodologia que auxilia na definição da quantidade de minério liberado a ser considerada nos planos de lavra. Por meio da análise de um estudo de caso, usando krigagem ordinária como método de estimativa e simulação geoestatística para acesso à incerteza, foi avaliado o potencial da metodologia proposta. Foram gerados planos de lavra de cinco anos como referência a partir de cada um dos dois modelos de blocos. Os sequenciamentos de referência foram usados para gerar novos sequenciamentos, com quantidades variáveis de minério liberado (a saber, um, três, cinco e oito meses) para homogeneização na lavra, com posterior alimentação de usina com pilhas de homogeneização. Usando estas possíveis configurações, observou-se o impacto no valor presente líquido de cada um dos cenários e os efeitos do uso de minério liberado na variação de teores para composição de pilhas de homogeneização. A convergência desses critérios é capaz de fornecer diretrizes para a definição da quantidade adequada de minério liberado, a ser usada nos planos de lavra, que permita um balanço entre despesas com antecipação de descobertura para liberação de minério e, também, propicie uma atenuação da variância de teores na formação de pilhas de homogeneização para alimentação da usina. / In a mining operation the quantity and quality of the exposed ore available for plant feeding are essential for the continuity and flexibility of the operations. The quantity of exposed ore it is not considered in the mine sequencing specialist softwares. Generally when esposed ore is considered in mine planning routines, the minimum tonnage of exposed ore is defined by empirical methods. This study develops a methodology that helps in the definition of the quantity of exposed ore to be considered in the mine planning. Trough analyzing a case study, using ordinary kriging and geoestatistical simulation to access the uncertainty, it was evaluated the proposed methodology potential. It was generated five year mine planning as a reference for each one of the two block models. The reference mine plans were used to generate new scenarios with variable quantities of exposed ore (namely one, three, five and eight months) to mining blend, with posterior plant feed with homogenization piles. Using these possible configurations, it was observed the impact on the net present value of each scenario and the effects of using exposed ore on the grade variability while composing homogenization piles. The convergence of these criteria is able to give drivers for the definition of the quantity of exposed ore, to be used in the mine plans, which balances the expenses with stripping anticipation for ore exposure and give lower grade variability in the homogenization pile formation for plant feed.
15

Análise de expansão de cava com múltiplas restrições de superfície sob incerteza geológica

Kuckartz, Bruno Tomasi January 2017 (has links)
A operação e gerência de empreendimentos mineiros são tarefas normalmente difíceis e complexas. Para otimizar toda a operação, os engenheiros precisam lidar com muitos aspectos técnicos e restrições, como a modelagem geológica, estimativa de reservas, determinação da necessidade de blendagem, projeto das cavas ótimas e operacionais, custos operacionais, questões ambientais, entre outros. Nesse sentido, o posicionamento de infraestruturas de superfície é um dos pontos críticos dentro do planejamento de mina. Aproximar as estruturas da cava, com o intuito de reduzir custos operacionais, pode interferir em eventuais expansões da cava em novos e favoráveis cenários. Nesses casos, impactos no valor presente líquido (VPL) do projeto são inevitáveis e precisam ser tratados tecnicamente, avaliando um grande número de cenários alternativos para delinear uma estratégia que incremente a lucratividade do projeto. O objetivo deste estudo é avaliar, por meio de comparações de VPL entre diferentes cenários de múltiplas restrições de superfície, sob incerteza geológica, a possibilidade de mover pilhas de estéril e outras infraestruturas de suas atuais posições e/ou definir prioridades e mensurar o impacto que cada restrição representa na lucratividade do projeto. A metodologia foi aplicada a uma mina de fosfato para ilustrar como determinar a melhor alternativa em uma perspectiva de planejamento de mina de longo prazo. Utilizando o método de cavas híbridas, aplicado ao modelo de teores simulados, foi possível identificar zonas de probabilidade de ocorrência dentro da cava matemática, o que forneceu informações cruciais para auxiliar na tomada de decisão a respeito da necessidade de relocação de estruturas. / The operation and management of mining enterprises are usually difficult and complex tasks. To optimize the entire operation the engineers must deal with several technical aspects and constraints, such as orebody modelling, reserves estimation, determination of blending necessity, optimum and operational pit designs, operational costs, environmental issues, among others. In this sense, locating surface infrastructures is one of the most critical mine planning concerns. Approximating these structures to the pit, in order to reduce the operational costs, might interfere with future pit expansions in new favorable scenarios. In such cases, impacts on project’s net present value (NPV) are inevitable and must be deal technically, evaluating several alternative scenarios to delineate a strategy to maximize profitability. The aim of this study is to evaluate, through NPV comparisons considering different scenarios with multiple constraints, under geological uncertainty, the possibility of moving waste piles and infrastructure buildings from their current position and/or defining priorities to after measuring the impact that each constraint represents on the project´s profitability. The methodology will be applied to a phosphate mine, to determine the best alternative from a long-term mine planning perspective. Using the hybrid pits method, applied to a simulated grades model, allowed the identification os occurrence probability zones within mathematical pit, providing critical data to support decision making regarding infrastructure relocation.
16

Método para auxílio na definição da quantidade de minério liberado

Fontoura, Daniel Mayer January 2017 (has links)
Em uma operação mineira, a quantidade e a qualidade do minério disponível para alimentação na usina são essenciais para a continuidade e flexibilidade das operações. A quantidade de minério liberado não é considerada em softwares especialistas de sequenciamento de lavra. Geralmente quando o minério liberado é utilizado em rotinas de planejamento, a tonelagem mínima de minério liberado é definida a partir de métodos empíricos. Este estudo desenvolve uma metodologia que auxilia na definição da quantidade de minério liberado a ser considerada nos planos de lavra. Por meio da análise de um estudo de caso, usando krigagem ordinária como método de estimativa e simulação geoestatística para acesso à incerteza, foi avaliado o potencial da metodologia proposta. Foram gerados planos de lavra de cinco anos como referência a partir de cada um dos dois modelos de blocos. Os sequenciamentos de referência foram usados para gerar novos sequenciamentos, com quantidades variáveis de minério liberado (a saber, um, três, cinco e oito meses) para homogeneização na lavra, com posterior alimentação de usina com pilhas de homogeneização. Usando estas possíveis configurações, observou-se o impacto no valor presente líquido de cada um dos cenários e os efeitos do uso de minério liberado na variação de teores para composição de pilhas de homogeneização. A convergência desses critérios é capaz de fornecer diretrizes para a definição da quantidade adequada de minério liberado, a ser usada nos planos de lavra, que permita um balanço entre despesas com antecipação de descobertura para liberação de minério e, também, propicie uma atenuação da variância de teores na formação de pilhas de homogeneização para alimentação da usina. / In a mining operation the quantity and quality of the exposed ore available for plant feeding are essential for the continuity and flexibility of the operations. The quantity of exposed ore it is not considered in the mine sequencing specialist softwares. Generally when esposed ore is considered in mine planning routines, the minimum tonnage of exposed ore is defined by empirical methods. This study develops a methodology that helps in the definition of the quantity of exposed ore to be considered in the mine planning. Trough analyzing a case study, using ordinary kriging and geoestatistical simulation to access the uncertainty, it was evaluated the proposed methodology potential. It was generated five year mine planning as a reference for each one of the two block models. The reference mine plans were used to generate new scenarios with variable quantities of exposed ore (namely one, three, five and eight months) to mining blend, with posterior plant feed with homogenization piles. Using these possible configurations, it was observed the impact on the net present value of each scenario and the effects of using exposed ore on the grade variability while composing homogenization piles. The convergence of these criteria is able to give drivers for the definition of the quantity of exposed ore, to be used in the mine plans, which balances the expenses with stripping anticipation for ore exposure and give lower grade variability in the homogenization pile formation for plant feed.
17

Análise de expansão de cava com múltiplas restrições de superfície sob incerteza geológica

Kuckartz, Bruno Tomasi January 2017 (has links)
A operação e gerência de empreendimentos mineiros são tarefas normalmente difíceis e complexas. Para otimizar toda a operação, os engenheiros precisam lidar com muitos aspectos técnicos e restrições, como a modelagem geológica, estimativa de reservas, determinação da necessidade de blendagem, projeto das cavas ótimas e operacionais, custos operacionais, questões ambientais, entre outros. Nesse sentido, o posicionamento de infraestruturas de superfície é um dos pontos críticos dentro do planejamento de mina. Aproximar as estruturas da cava, com o intuito de reduzir custos operacionais, pode interferir em eventuais expansões da cava em novos e favoráveis cenários. Nesses casos, impactos no valor presente líquido (VPL) do projeto são inevitáveis e precisam ser tratados tecnicamente, avaliando um grande número de cenários alternativos para delinear uma estratégia que incremente a lucratividade do projeto. O objetivo deste estudo é avaliar, por meio de comparações de VPL entre diferentes cenários de múltiplas restrições de superfície, sob incerteza geológica, a possibilidade de mover pilhas de estéril e outras infraestruturas de suas atuais posições e/ou definir prioridades e mensurar o impacto que cada restrição representa na lucratividade do projeto. A metodologia foi aplicada a uma mina de fosfato para ilustrar como determinar a melhor alternativa em uma perspectiva de planejamento de mina de longo prazo. Utilizando o método de cavas híbridas, aplicado ao modelo de teores simulados, foi possível identificar zonas de probabilidade de ocorrência dentro da cava matemática, o que forneceu informações cruciais para auxiliar na tomada de decisão a respeito da necessidade de relocação de estruturas. / The operation and management of mining enterprises are usually difficult and complex tasks. To optimize the entire operation the engineers must deal with several technical aspects and constraints, such as orebody modelling, reserves estimation, determination of blending necessity, optimum and operational pit designs, operational costs, environmental issues, among others. In this sense, locating surface infrastructures is one of the most critical mine planning concerns. Approximating these structures to the pit, in order to reduce the operational costs, might interfere with future pit expansions in new favorable scenarios. In such cases, impacts on project’s net present value (NPV) are inevitable and must be deal technically, evaluating several alternative scenarios to delineate a strategy to maximize profitability. The aim of this study is to evaluate, through NPV comparisons considering different scenarios with multiple constraints, under geological uncertainty, the possibility of moving waste piles and infrastructure buildings from their current position and/or defining priorities to after measuring the impact that each constraint represents on the project´s profitability. The methodology will be applied to a phosphate mine, to determine the best alternative from a long-term mine planning perspective. Using the hybrid pits method, applied to a simulated grades model, allowed the identification os occurrence probability zones within mathematical pit, providing critical data to support decision making regarding infrastructure relocation.
18

Método para auxílio na definição da quantidade de minério liberado

Fontoura, Daniel Mayer January 2017 (has links)
Em uma operação mineira, a quantidade e a qualidade do minério disponível para alimentação na usina são essenciais para a continuidade e flexibilidade das operações. A quantidade de minério liberado não é considerada em softwares especialistas de sequenciamento de lavra. Geralmente quando o minério liberado é utilizado em rotinas de planejamento, a tonelagem mínima de minério liberado é definida a partir de métodos empíricos. Este estudo desenvolve uma metodologia que auxilia na definição da quantidade de minério liberado a ser considerada nos planos de lavra. Por meio da análise de um estudo de caso, usando krigagem ordinária como método de estimativa e simulação geoestatística para acesso à incerteza, foi avaliado o potencial da metodologia proposta. Foram gerados planos de lavra de cinco anos como referência a partir de cada um dos dois modelos de blocos. Os sequenciamentos de referência foram usados para gerar novos sequenciamentos, com quantidades variáveis de minério liberado (a saber, um, três, cinco e oito meses) para homogeneização na lavra, com posterior alimentação de usina com pilhas de homogeneização. Usando estas possíveis configurações, observou-se o impacto no valor presente líquido de cada um dos cenários e os efeitos do uso de minério liberado na variação de teores para composição de pilhas de homogeneização. A convergência desses critérios é capaz de fornecer diretrizes para a definição da quantidade adequada de minério liberado, a ser usada nos planos de lavra, que permita um balanço entre despesas com antecipação de descobertura para liberação de minério e, também, propicie uma atenuação da variância de teores na formação de pilhas de homogeneização para alimentação da usina. / In a mining operation the quantity and quality of the exposed ore available for plant feeding are essential for the continuity and flexibility of the operations. The quantity of exposed ore it is not considered in the mine sequencing specialist softwares. Generally when esposed ore is considered in mine planning routines, the minimum tonnage of exposed ore is defined by empirical methods. This study develops a methodology that helps in the definition of the quantity of exposed ore to be considered in the mine planning. Trough analyzing a case study, using ordinary kriging and geoestatistical simulation to access the uncertainty, it was evaluated the proposed methodology potential. It was generated five year mine planning as a reference for each one of the two block models. The reference mine plans were used to generate new scenarios with variable quantities of exposed ore (namely one, three, five and eight months) to mining blend, with posterior plant feed with homogenization piles. Using these possible configurations, it was observed the impact on the net present value of each scenario and the effects of using exposed ore on the grade variability while composing homogenization piles. The convergence of these criteria is able to give drivers for the definition of the quantity of exposed ore, to be used in the mine plans, which balances the expenses with stripping anticipation for ore exposure and give lower grade variability in the homogenization pile formation for plant feed.
19

Bergwerksplanung und interaktive Prozessüberwachung in der virtuellen Grubenwarte

Buttgereit, David, Benndorf, Jörg 16 July 2019 (has links)
Im Rahmen des von der europäischen Kommission geförderten Forschungsvorhaben Real-Time Mining (Förderkennzeichen 641989) wurde eine Leitstand-Software entwickelt, mit der die heterogenen Daten der verschiedenen Partner in einer homogenen Benutzeroberfläche visualisiert und analysiert werden können. Das Visualisierungscockpit ist ein leistungsstarkes Modul, das die interaktive Darstellung von Lagerstättenmodellen, die 3DExtraktionsplanung, integrierte Daten des Positionierungssystems sowie die Visualisierung von Sensor- und Maschinenleistungsdaten beinhaltet. Neue Hardware-Technologien bieten heutzutage eine Vielzahl von Möglichkeiten für die innovative Umsetzung von Visualisierungslösungen. Der Einsatz von Virtual-Reality-Brillen ermöglicht eine immersive Erforschung der 3D-Daten. Dies ist noch intuitiver und komfortabler als eine 'klassische' 3D-Visualisierung und bietet große Möglichkeiten zur Unterstützung einer optimierten Entscheidungsfindung. Insbesondere in der Bergbauindustrie stehen sehr heterogene und komplexe Datensätze zur Verfügung. Um die Exploration dieser Daten besonders intuitiv zu gestalten, ist der Einsatz der VR-Technologie besonders naheliegend und daher wurde die Cockpit-Software als „VR-ready“ konzipiert. Die Implementierung basiert auf modernsten Technologien unter Berücksichtigung spezieller Softwareentwicklungsanforderungen wie Benutzerfreundlichkeit, Performance, Kompatibilität, Modularität und Erweiterbarkeit. / As part of the research project funded by the European Commission (number 641989), a control station software was developed with which the heterogeneous data of the various partners can be visualized and analyzed in a homogeneous user interface. The visualization cockpit is a high-performance module that includes the visualization of deposit-model, 3D extraction planning, integrated data of the positioning-system as well as the visualization of sensor and machine performance data. New hardware technologies offer a variety of possibilities for innovative implementation of visualization solutions. The use of virtual reality glasses enables immersive exploration of the 3D data. This is even more intuitive and convenient than a “classic” 3D visualization and offer great opportunities to support optimized decision making. Especially in the mining industry very heterogeneous and complex data sets are available. To make the exploration of the data particularly intuitive, the use of VR technology is particularly obvious. The implementation of the cockpit software is carried out based on the latest technologies with respect to special software development requirements such as user-friendliness, performance, compatibility, modularity and expandability.
20

Impacto da variabilidade operacional na execução do plano de lavra. / Analysis of the impact of the operational variability onto execution of a mine plan.

Marin, Tatiane 30 March 2009 (has links)
Um dos principais desafios para engenheiros de planejamento na mineração é fornecer planos de lavra que sejam exeqüíveis e que levem em conta as variabilidades operacionais da mina. Muitas vezes, os planos de lavra são criados com base nos valores médios históricos ou estimados das principais variáveis do sistema, que embora representem corretamente o ambiente de lavra, não permitem estimar o impacto de eventuais variabilidades nos resultados da operação da mina. O resultado dessa situação é uma menor confiabilidade nos planos de lavra quanto menor o horizonte de tempo planejado, o que leva a tomada de decisões operacionais muitas vezes intuitivas que nem sempre são ótimas, podendo prejudicar o atendimento das metas de longo prazo definidas pelo planejamento. Esta pesquisa propõe uma metodologia para criar planos de lavra que incorporem a variabilidade operacional, ou seja, planos exeqüíveis em conformidade com as operações unitárias da lavra, através da aplicação de técnicas de simulação. Essa metodologia é testada através de uma aplicação teórica e um estudo de caso, permitindo que a operação possa efetivamente contar com um plano que teve sua exeqüibilidade avaliada antes de sua publicação, apoiando assim o processo de tomada de decisões num ponto-chave da cadeia de produção mineral. Os resultados do estudo de caso comprovaram os benefícios práticos da metodologia de simulação proposta, permitindo fixar metas de produção mais realísticas para as condições operacionais da mina estudada, além de identificar oportunidades para a continuidade da pesquisa em temas relacionados à incorporação da incerteza geológica e à automatização do processo de simulação de lavra. / One of the main challenges for mine planning engineers is to produce operationally feasible mine plans which take into account the practical variability of the mining operation. It is quite common for the mining industry to work with plans that have been based on estimated means or historical values for most of the key operational variables, which although are useful to represent the mine environment, do not allow management to predict the impact of eventual variations onto the outcome of the mining operation. The result is a lower degree of confidence on the mine plans the shorter the time horizon considered, and a non-optimal decision making process that is much more oriented on experience, with a significant impact on the longer-term targets of the mine operation. This research proposes a methodology for creating mine plans that are operationally feasible and which are aligned with the practicalities of the mining operation by taking into account the operational variability of the mine. The methodology is based on simulation techniques and it is tested through a theoretical application and a case study. The outcome is a mine plan that is appropriate for the mines operation because it has been tested through simulation prior to its publication, which represents an important contribution for the decision making process at a key position in the mine production chain. The results obtained have confirmed the practical benefits of the proposed simulation methodology, by allowing the establishment of more realistic production targets associated to the current operating conditions of the mine being studied. The outcome of the project have also allowed the identification of opportunities for further research, related to the incorporation of geological uncertainty and to the automation of the mine simulation process.

Page generated in 0.1117 seconds