• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 26
  • 10
  • 1
  • 1
  • 1
  • Tagged with
  • 39
  • 39
  • 24
  • 24
  • 16
  • 11
  • 9
  • 9
  • 8
  • 7
  • 6
  • 6
  • 5
  • 5
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Sequenciamento e programação de lavra com alocação de equipamentos de carga. / Scheduling of mining with allocation of loading equipments.

Andrade, Arthur Quintão de 08 April 2014 (has links)
Este trabalho tem seu foco no problema de sequenciamento e programação da lavra em mina a céu aberto, com alocação de equipamentos de carregamento. Neste estudo considera-se a existência de uma frota heterogênea de equipamentos de carga e dois tipos de material lavráveis, sendo minério ou estéril. Para a lavra de minério são considerados requisitos de qualidade a serem atingidos pela mistura de minério, um britador, uma capacidade de operação atribuída à usina de beneficiamento e uma pilha de estoque objetivando abastecer a usina quando faltar minério nas frentes de lavra, denominada pilha de ROM. Em uma mina o carregamento pode ser gerido por um plano de lavra que descreve a movimentação e a produção horária de cada equipamento de carga ao longo do tempo. Neste contexto, apresenta-se um modelo matemático apoiado por um algoritmo responsável por mover o horizonte de tempo a cada execução do modelo com intuito de gerar ordens de lavra resolvidas com otimalidade. Juntas, essas ordens descreverão o plano de lavra dos equipamentos de carga. Os experimentos computacionais, realizados utilizando dados de uma jazida de cobre, mostram a efetividade da proposta considerando um horizonte de médio prazo. / This paper focuses on the mining scheduling problem in open pit, considering the allocation of loading equipment. This study considers the existence of a heterogeneous fleet loading equipment and two types of mineable material, namely ore or waste. For the mining of ore are considered quality requirements to be met by the ore blending, a crusher, the capacity of operation of the processing plant and a stockpile which feed the plant when there is lack of ore in mining fronts, called ROM stockpile. In a mine, loading can be managed by a mining plan that describes the movement and the schedule of each load equipment over time. In this context, we present a mathematical model supported by an algorithm that is responsible for moving the time horizon for each model run, with the goal of generating mining orders till resolved to optimality. Together, these orders describe the mining plan of the loading equipment. The computational experiments, conducted using data from a copper deposit, show the effectiveness of the proposal considering a medium-term horizon.
22

Modelo de gerenciamento de informações na cadeia de valor de mineração e de petróleo. / Information management model in the mining and oil value chain.

Azevedo, Ricardo Cabral de 07 August 2007 (has links)
Este trabalho começa abordando os aspectos estudados: visualização e gerenciamento de informações. Verifica-se hoje que uma das grandes dificuldades com eles é conseguir-se uma visão integrada de todas as atividades de uma empresa, especialmente nas de grande porte, bem como se manter dados precisos e atualizados sempre à disposição, para que se consiga identificar com rapidez possíveis erros e soluções. Estuda-se a utilização de conceitos de mapeamento de processos e de realidade virtual nas áreas de mineração e petrolífera - incluindo um breve histórico e exemplos de aplicações - para suprir estas dificuldades. Descreve-se, a seguir, os objetivos do trabalho, que envolvem o desenvolvimento de um modelo de integração de informações para as duas áreas citadas, além da análise dos benefícios inerentes ao acesso gráfico a repositórios centrais de dados. Parte-se de uma revisão bibliográfica relacionada aos problemas e soluções analisados, e de uma metodologia de trabalho adequada ao tema proposto, baseada em observação, entrevistas e análises com profissionais dos setores envolvidos. Passa-se para o estudo de caso da mina Rio das Pedras, da empresa PETROBRAS, em São Mateus do Sul, PR, que explora folhelhos para obtenção de óleo, escolhida para este estudo por envolver simultaneamente mineração e petróleo, focos dessa tese. Obteve-se diversos resultados, atendendo aos objetivos propostos. Foi desenvolvido um modelo de gerenciamento integrado de informações. Para isso, foi criado um diagrama representando a cadeia de valor de petróleo e foram mapeadas as atividades principais dessa cadeia, bem como as da mineração. Também foram criados modelos, com o auxílio de avançadas ferramentas computacionais, para uso de realidade virtual, além de um roteiro para implantação destes modelos. Estes resultados foram sendo divulgados ao longo deste projeto em diversos eventos, incluindo o Rio Oil & Gas Expo and Conference, em 2006 e o SIAEM, em 2004. Ao final, observou-se que há a possibilidade de uma boa integração dentro de cada setor, de mineração e petrolífero, e até a integração dos dois setores em alguns aspectos comuns a ambos, permitindo maior facilidade na obtenção de dados e na tomada de decisão. Com isso, verifica-se que essa tecnologia pode trazer melhorias importantes para os setores envolvidos, e muito pode ser feito para desenvolvê-la ainda mais. / This thesis starts by identifying the key issues of the research: visualization and management of information. It is widely known that one of the most common difficulties in information management is to obtain a complete and integrated view of all the company processes and activities. Another common difficulty is to maintain the necessary data always precise, updated and available to whoever needs them, so that it will be possible for the user to identify discrepancies right at the beginning and to immediately visualize the most appropriate solutions for each case. Evaluating the use of process mapping and virtual reality applied to the mining and petroleum industry - including a brief historical background and examples of applications - it is verified how these technologies can help to solve the problems identified. This thesis describes then the research objectives, which are based on developing a model suited for the integration of information in the mining and oil industry. The integration between mine planning and operation, and between oil exploration and production, together with the analysis of the benefits of a central graphical database, are also included. The thesis includes a bibliographic review, related to the problems and solutions analyzed, and also the methodology that has been developed, including observation, interviews, discussions, and analysis with professionals from the mining and petroleum industry. The thesis uses as a case study the oil shale mine Rio das Pedras (a mine from PETROBRAS, in São Mateus do Sul, Paraná). A brief description of this mine, and the reasons for its use on this study, related to the fact that it combines oil and mining engineering, are also presented here. The results of the research includes the development of an information management model, an oil production chain model, and models for processes mapping and virtual reality. These results were presented at international events like Rio Oil & Gas Expo and Conference, in 2006, and SIAEM, in 2004. Through the simulation of basic operations, as ore transport to the plant, and with the aid of the most advanced software tools available, it was verified how the data could be easily obtained, and how these technologies could be improved - it is already possible to integrate some mining and oil industry aspects - with a quite favorable forecast for its future use in several applications in the mining and petroleum industry.
23

Aprimoramento do controle de qualidade do minério no planejamento de lavra de curto prazo: estudo de caso. / Improvement of the quality control of mining en the planning of short term - cause study.

Faria Junior, Agenor de 11 December 2009 (has links)
Melhorar o conhecimento sobre o minério lavrado é um desafio enfrentado diariamente pelas empresas de mineração. O presente trabalho trata de um estudo realizado na mina de apatita, localizada na cidade de Cajati, interior do Estado de São Paulo, de propriedade da Bunge Fertilizantes S/A, onde são abordados temas relacionados ao planejamento de lavra de curto prazo, visando o aprimoramento dos procedimentos de coleta de amostras de pó-de-perfuratriz, que são sistematicamente coletadas com o objetivo de controle de qualidade da lavra, contribuindo para uma efetiva melhoria na gestão do planejamento de lavra e na tomada de decisões. Os resultados obtidos mostram que, da forma como as amostras são coletadas, ocorre um enriquecimento do teor de P2O5, podendo levar a tomada de decisões erradas por parte da operação da mina. / Improve knowledge of the ore mined is a challenge faced daily by mining companies. This paper is a study in apatite mine, located in the city of Cajati, within São Paulo,propriety of Bunge Fertilizantes S/A, where are treated issues related to short term planning of the mine to improve procedures for collecting dust samples drilling, which are systematically collected for the purpose of quality control of mining, contributing to an effective improvement in the management of planning of mining and decision making. The results show that the way the sampling is done, there is an enrichment of content in P2O5, which can lead to making wrong decisions by the operation of the mine.
24

Análise de cenários de planejamento de lavra para adequação de uso futuro de área de mineração de agregados

Schmitzhaus, Wagner Cristiano January 2018 (has links)
A produção de agregados para construção civil é o maior segmento mineral Brasileiro, em números de produção, sendo formada principalmente por pequenos e médios empreendimentos, normalmente utilizando técnicas e procedimentos obsoletos e pouco um nenhum planejamento tanto para extração quanto para o fechamento da mina. O fechamento de mina e posterior utilização da área ainda é um grande problema visto que existem muitas áreas mineradas em que o plano de fechamento de mina não foi executado, deixando assim um passivo socioambiental elevado, prejudicando a imagem da mineração. Existem diversos exemplos de sucesso em que antigas cavas foram utilizadas para a implantação de novos empreendimentos, como loteamentos, óperas e hotéis. Com o intuito de mostrar a importância do planejamento para fechamento e posterior utilização de área de mineração, bem como a análise ambiental e impactos da atividade na sociedade e meio ambiente, este trabalho tem o objetivo de desenvolver uma metodologia para auxiliar, principalmente o pequeno e médio produtor de agregados, sobre os impactos que o correto planejamento e manejo da operação têm sobre o retorno no uso futuro da área. Foram desenvolvidos diferentes cenários de usos futuros alternativos de uma área de mineração localizada no Litoral Norte do Rio Grande do Sul, que posteriormente foram comparados entre si em relação à recuperação mineral, impactos socioambientais, e retorno financeiro. Ao final do trabalho foi possível visualizar uma metodologia apropriada para a análise de impactos socioambientais e planejamento para preparação da área para o recebimento de novos empreendimentos. A partir destes métodos de análise dispõe-se de diversos cenários comparativos, podendo assim o empreendedor tomar a decisão mais correta em relação ao seu empreendimento minerário e futuros empreendimentos pós-fechamento. / Aggregate production for civil construction is the largest Brazilian mineral segment, in production numbers, consisting mainly of small and medium-sized enterprises, usually using obsolete techniques and procedures and little or no planning for both extraction and closure of the mine. The closure of mines and subsequent use of the area is still a major problem, there are many mined areas where the mine closure plan has not been implemented, thus leaving a high social and environmental liability, damaging the mining image, but there are several examples of use of deactivated mining sites for the implementation of diverse projects. In order to show the importance of planning for the closure and subsequent use of the mining area, as well as the environmental analysis of impacts of the activity on society and the environment, this work has the objective of developing a methodology to assist, especially small and medium aggregate producer, on the impacts that correct planning and management of the operation has on the future use of the area. Different scenarios of future uses of a mining area located in the Northern Coast of Rio Grande do Sul were developed, which were later compared to each other in relation to mineral recovery, socioenvironmental impacts, and financial return. At the end of the work it was possible to visualize an appropriate methodology for the analysis of socio-environmental impacts and planning to prepare the area to receive new projects. From these methods of analysis we have several comparative scenarios, so that the entrepreneur can make the most correct decision regarding his mining enterprise and future enterprises after the closing.
25

Sequenciamento e programação de lavra com alocação de equipamentos de carga. / Scheduling of mining with allocation of loading equipments.

Arthur Quintão de Andrade 08 April 2014 (has links)
Este trabalho tem seu foco no problema de sequenciamento e programação da lavra em mina a céu aberto, com alocação de equipamentos de carregamento. Neste estudo considera-se a existência de uma frota heterogênea de equipamentos de carga e dois tipos de material lavráveis, sendo minério ou estéril. Para a lavra de minério são considerados requisitos de qualidade a serem atingidos pela mistura de minério, um britador, uma capacidade de operação atribuída à usina de beneficiamento e uma pilha de estoque objetivando abastecer a usina quando faltar minério nas frentes de lavra, denominada pilha de ROM. Em uma mina o carregamento pode ser gerido por um plano de lavra que descreve a movimentação e a produção horária de cada equipamento de carga ao longo do tempo. Neste contexto, apresenta-se um modelo matemático apoiado por um algoritmo responsável por mover o horizonte de tempo a cada execução do modelo com intuito de gerar ordens de lavra resolvidas com otimalidade. Juntas, essas ordens descreverão o plano de lavra dos equipamentos de carga. Os experimentos computacionais, realizados utilizando dados de uma jazida de cobre, mostram a efetividade da proposta considerando um horizonte de médio prazo. / This paper focuses on the mining scheduling problem in open pit, considering the allocation of loading equipment. This study considers the existence of a heterogeneous fleet loading equipment and two types of mineable material, namely ore or waste. For the mining of ore are considered quality requirements to be met by the ore blending, a crusher, the capacity of operation of the processing plant and a stockpile which feed the plant when there is lack of ore in mining fronts, called ROM stockpile. In a mine, loading can be managed by a mining plan that describes the movement and the schedule of each load equipment over time. In this context, we present a mathematical model supported by an algorithm that is responsible for moving the time horizon for each model run, with the goal of generating mining orders till resolved to optimality. Together, these orders describe the mining plan of the loading equipment. The computational experiments, conducted using data from a copper deposit, show the effectiveness of the proposal considering a medium-term horizon.
26

Análise de projetos limite : lavra a céu aberto x lavra subterrânea

De Carli, Carla January 2013 (has links)
Com o passar dos anos a sociedade tem se tornado gradativamente mais dependente de recursos minerais para o seu funcionamento e para o desenvolvimento de produtos. A maior parte das coisas que cercam o homem necessita de alguma espécie de bem mineral como matéria prima para sua fabricação. Por isso, cada vez mais, a mineração tem sido objeto de estudos, buscando aprimoramento e desenvolvimento nos métodos de extração de minérios. Existem duas formas utilizadas para a extração de bens minerais, uma por uso de métodos de lavra a céu aberto (OP) e outra através da aplicação de métodos para lavra subterrânea (UG). A definição de qual método deve ser aplicado em cada caso depende de diversos fatores, como profundidade e geometria do corpo mineral, competência da rocha portadora do minério e da rocha encaixante, entre outros, mas ao final, aspectos econômicos predominam para a definição da viabilidade de cada um dos possíveis métodos. Porém, existem casos em que a melhor escolha para minerar o depósito não se dá por umas dessas duas opções, e sim, pela combinação de ambas, ou seja, a aplicação da lavra a céu aberto seguida da extração dos recursos remanescentes por lavra subterrânea. A grande dificuldade, nestes casos, é definir qual o momento ideal para a transição de método, de maneira que os resultados do projeto integrado sejam otimizados e que um método não inviabilize o outro. Para isso é necessário analisar as duas opções de lavra individualmente, lavrando somente a céu aberto e lavrando somente por métodos subterrâneos, além de analisar-se a viabilidade do projeto através da combinação dos dois métodos, comparando as opções técnica e economicamente e selecionando a que apresente a melhor resposta ao final, para então tomar-se a decisão de qual alternativa de projeto é o mais indicado para cada caso. / Over the years, the society has become progressively dependent on mineral resources for its operation and for development of products. The majority of the things that surround the men needs some kind of mineral material as raw material for its manufacture. Therefore, increasingly, mining has been studied aiming to improve and develop methods of mineral extraction. There are two ways that are utilized to mineral extraction, one by open pit methods (OP) e another by application of underground methods (UG). The definition of which one should be applied in each case depends on many factors, such as depth and geometry of the mineral body, strength of the mineralized and bounding rock, among others, but at the end, economic aspects are predominant for the definition of viability of the methods. However, there are some cases where the best choice to mine the deposit is not one of these options, but the combination of both methods, it means, the application of open pit mining followed by extraction of remaining resources by underground mining. The great challenge, in these cases, is to define what is the right moment for the transition of the methods, making sure that the results are optimized and one method do not impede the development of the other one. In this sense, it is necessary to analyze both options individually, mining the deposit only by open pit and mining only by underground, and also analyze the combination of the two methods, comparing these options technically and economically at the end, and then decide which project alternative is the best for each case.
27

Análise de cenários de planejamento de lavra para adequação de uso futuro de área de mineração de agregados

Schmitzhaus, Wagner Cristiano January 2018 (has links)
A produção de agregados para construção civil é o maior segmento mineral Brasileiro, em números de produção, sendo formada principalmente por pequenos e médios empreendimentos, normalmente utilizando técnicas e procedimentos obsoletos e pouco um nenhum planejamento tanto para extração quanto para o fechamento da mina. O fechamento de mina e posterior utilização da área ainda é um grande problema visto que existem muitas áreas mineradas em que o plano de fechamento de mina não foi executado, deixando assim um passivo socioambiental elevado, prejudicando a imagem da mineração. Existem diversos exemplos de sucesso em que antigas cavas foram utilizadas para a implantação de novos empreendimentos, como loteamentos, óperas e hotéis. Com o intuito de mostrar a importância do planejamento para fechamento e posterior utilização de área de mineração, bem como a análise ambiental e impactos da atividade na sociedade e meio ambiente, este trabalho tem o objetivo de desenvolver uma metodologia para auxiliar, principalmente o pequeno e médio produtor de agregados, sobre os impactos que o correto planejamento e manejo da operação têm sobre o retorno no uso futuro da área. Foram desenvolvidos diferentes cenários de usos futuros alternativos de uma área de mineração localizada no Litoral Norte do Rio Grande do Sul, que posteriormente foram comparados entre si em relação à recuperação mineral, impactos socioambientais, e retorno financeiro. Ao final do trabalho foi possível visualizar uma metodologia apropriada para a análise de impactos socioambientais e planejamento para preparação da área para o recebimento de novos empreendimentos. A partir destes métodos de análise dispõe-se de diversos cenários comparativos, podendo assim o empreendedor tomar a decisão mais correta em relação ao seu empreendimento minerário e futuros empreendimentos pós-fechamento. / Aggregate production for civil construction is the largest Brazilian mineral segment, in production numbers, consisting mainly of small and medium-sized enterprises, usually using obsolete techniques and procedures and little or no planning for both extraction and closure of the mine. The closure of mines and subsequent use of the area is still a major problem, there are many mined areas where the mine closure plan has not been implemented, thus leaving a high social and environmental liability, damaging the mining image, but there are several examples of use of deactivated mining sites for the implementation of diverse projects. In order to show the importance of planning for the closure and subsequent use of the mining area, as well as the environmental analysis of impacts of the activity on society and the environment, this work has the objective of developing a methodology to assist, especially small and medium aggregate producer, on the impacts that correct planning and management of the operation has on the future use of the area. Different scenarios of future uses of a mining area located in the Northern Coast of Rio Grande do Sul were developed, which were later compared to each other in relation to mineral recovery, socioenvironmental impacts, and financial return. At the end of the work it was possible to visualize an appropriate methodology for the analysis of socio-environmental impacts and planning to prepare the area to receive new projects. From these methods of analysis we have several comparative scenarios, so that the entrepreneur can make the most correct decision regarding his mining enterprise and future enterprises after the closing.
28

Análise de projetos limite : lavra a céu aberto x lavra subterrânea

De Carli, Carla January 2013 (has links)
Com o passar dos anos a sociedade tem se tornado gradativamente mais dependente de recursos minerais para o seu funcionamento e para o desenvolvimento de produtos. A maior parte das coisas que cercam o homem necessita de alguma espécie de bem mineral como matéria prima para sua fabricação. Por isso, cada vez mais, a mineração tem sido objeto de estudos, buscando aprimoramento e desenvolvimento nos métodos de extração de minérios. Existem duas formas utilizadas para a extração de bens minerais, uma por uso de métodos de lavra a céu aberto (OP) e outra através da aplicação de métodos para lavra subterrânea (UG). A definição de qual método deve ser aplicado em cada caso depende de diversos fatores, como profundidade e geometria do corpo mineral, competência da rocha portadora do minério e da rocha encaixante, entre outros, mas ao final, aspectos econômicos predominam para a definição da viabilidade de cada um dos possíveis métodos. Porém, existem casos em que a melhor escolha para minerar o depósito não se dá por umas dessas duas opções, e sim, pela combinação de ambas, ou seja, a aplicação da lavra a céu aberto seguida da extração dos recursos remanescentes por lavra subterrânea. A grande dificuldade, nestes casos, é definir qual o momento ideal para a transição de método, de maneira que os resultados do projeto integrado sejam otimizados e que um método não inviabilize o outro. Para isso é necessário analisar as duas opções de lavra individualmente, lavrando somente a céu aberto e lavrando somente por métodos subterrâneos, além de analisar-se a viabilidade do projeto através da combinação dos dois métodos, comparando as opções técnica e economicamente e selecionando a que apresente a melhor resposta ao final, para então tomar-se a decisão de qual alternativa de projeto é o mais indicado para cada caso. / Over the years, the society has become progressively dependent on mineral resources for its operation and for development of products. The majority of the things that surround the men needs some kind of mineral material as raw material for its manufacture. Therefore, increasingly, mining has been studied aiming to improve and develop methods of mineral extraction. There are two ways that are utilized to mineral extraction, one by open pit methods (OP) e another by application of underground methods (UG). The definition of which one should be applied in each case depends on many factors, such as depth and geometry of the mineral body, strength of the mineralized and bounding rock, among others, but at the end, economic aspects are predominant for the definition of viability of the methods. However, there are some cases where the best choice to mine the deposit is not one of these options, but the combination of both methods, it means, the application of open pit mining followed by extraction of remaining resources by underground mining. The great challenge, in these cases, is to define what is the right moment for the transition of the methods, making sure that the results are optimized and one method do not impede the development of the other one. In this sense, it is necessary to analyze both options individually, mining the deposit only by open pit and mining only by underground, and also analyze the combination of the two methods, comparing these options technically and economically at the end, and then decide which project alternative is the best for each case.
29

Análise de cenários de planejamento de lavra para adequação de uso futuro de área de mineração de agregados

Schmitzhaus, Wagner Cristiano January 2018 (has links)
A produção de agregados para construção civil é o maior segmento mineral Brasileiro, em números de produção, sendo formada principalmente por pequenos e médios empreendimentos, normalmente utilizando técnicas e procedimentos obsoletos e pouco um nenhum planejamento tanto para extração quanto para o fechamento da mina. O fechamento de mina e posterior utilização da área ainda é um grande problema visto que existem muitas áreas mineradas em que o plano de fechamento de mina não foi executado, deixando assim um passivo socioambiental elevado, prejudicando a imagem da mineração. Existem diversos exemplos de sucesso em que antigas cavas foram utilizadas para a implantação de novos empreendimentos, como loteamentos, óperas e hotéis. Com o intuito de mostrar a importância do planejamento para fechamento e posterior utilização de área de mineração, bem como a análise ambiental e impactos da atividade na sociedade e meio ambiente, este trabalho tem o objetivo de desenvolver uma metodologia para auxiliar, principalmente o pequeno e médio produtor de agregados, sobre os impactos que o correto planejamento e manejo da operação têm sobre o retorno no uso futuro da área. Foram desenvolvidos diferentes cenários de usos futuros alternativos de uma área de mineração localizada no Litoral Norte do Rio Grande do Sul, que posteriormente foram comparados entre si em relação à recuperação mineral, impactos socioambientais, e retorno financeiro. Ao final do trabalho foi possível visualizar uma metodologia apropriada para a análise de impactos socioambientais e planejamento para preparação da área para o recebimento de novos empreendimentos. A partir destes métodos de análise dispõe-se de diversos cenários comparativos, podendo assim o empreendedor tomar a decisão mais correta em relação ao seu empreendimento minerário e futuros empreendimentos pós-fechamento. / Aggregate production for civil construction is the largest Brazilian mineral segment, in production numbers, consisting mainly of small and medium-sized enterprises, usually using obsolete techniques and procedures and little or no planning for both extraction and closure of the mine. The closure of mines and subsequent use of the area is still a major problem, there are many mined areas where the mine closure plan has not been implemented, thus leaving a high social and environmental liability, damaging the mining image, but there are several examples of use of deactivated mining sites for the implementation of diverse projects. In order to show the importance of planning for the closure and subsequent use of the mining area, as well as the environmental analysis of impacts of the activity on society and the environment, this work has the objective of developing a methodology to assist, especially small and medium aggregate producer, on the impacts that correct planning and management of the operation has on the future use of the area. Different scenarios of future uses of a mining area located in the Northern Coast of Rio Grande do Sul were developed, which were later compared to each other in relation to mineral recovery, socioenvironmental impacts, and financial return. At the end of the work it was possible to visualize an appropriate methodology for the analysis of socio-environmental impacts and planning to prepare the area to receive new projects. From these methods of analysis we have several comparative scenarios, so that the entrepreneur can make the most correct decision regarding his mining enterprise and future enterprises after the closing.
30

Modelo de gerenciamento de informações na cadeia de valor de mineração e de petróleo. / Information management model in the mining and oil value chain.

Ricardo Cabral de Azevedo 07 August 2007 (has links)
Este trabalho começa abordando os aspectos estudados: visualização e gerenciamento de informações. Verifica-se hoje que uma das grandes dificuldades com eles é conseguir-se uma visão integrada de todas as atividades de uma empresa, especialmente nas de grande porte, bem como se manter dados precisos e atualizados sempre à disposição, para que se consiga identificar com rapidez possíveis erros e soluções. Estuda-se a utilização de conceitos de mapeamento de processos e de realidade virtual nas áreas de mineração e petrolífera - incluindo um breve histórico e exemplos de aplicações - para suprir estas dificuldades. Descreve-se, a seguir, os objetivos do trabalho, que envolvem o desenvolvimento de um modelo de integração de informações para as duas áreas citadas, além da análise dos benefícios inerentes ao acesso gráfico a repositórios centrais de dados. Parte-se de uma revisão bibliográfica relacionada aos problemas e soluções analisados, e de uma metodologia de trabalho adequada ao tema proposto, baseada em observação, entrevistas e análises com profissionais dos setores envolvidos. Passa-se para o estudo de caso da mina Rio das Pedras, da empresa PETROBRAS, em São Mateus do Sul, PR, que explora folhelhos para obtenção de óleo, escolhida para este estudo por envolver simultaneamente mineração e petróleo, focos dessa tese. Obteve-se diversos resultados, atendendo aos objetivos propostos. Foi desenvolvido um modelo de gerenciamento integrado de informações. Para isso, foi criado um diagrama representando a cadeia de valor de petróleo e foram mapeadas as atividades principais dessa cadeia, bem como as da mineração. Também foram criados modelos, com o auxílio de avançadas ferramentas computacionais, para uso de realidade virtual, além de um roteiro para implantação destes modelos. Estes resultados foram sendo divulgados ao longo deste projeto em diversos eventos, incluindo o Rio Oil & Gas Expo and Conference, em 2006 e o SIAEM, em 2004. Ao final, observou-se que há a possibilidade de uma boa integração dentro de cada setor, de mineração e petrolífero, e até a integração dos dois setores em alguns aspectos comuns a ambos, permitindo maior facilidade na obtenção de dados e na tomada de decisão. Com isso, verifica-se que essa tecnologia pode trazer melhorias importantes para os setores envolvidos, e muito pode ser feito para desenvolvê-la ainda mais. / This thesis starts by identifying the key issues of the research: visualization and management of information. It is widely known that one of the most common difficulties in information management is to obtain a complete and integrated view of all the company processes and activities. Another common difficulty is to maintain the necessary data always precise, updated and available to whoever needs them, so that it will be possible for the user to identify discrepancies right at the beginning and to immediately visualize the most appropriate solutions for each case. Evaluating the use of process mapping and virtual reality applied to the mining and petroleum industry - including a brief historical background and examples of applications - it is verified how these technologies can help to solve the problems identified. This thesis describes then the research objectives, which are based on developing a model suited for the integration of information in the mining and oil industry. The integration between mine planning and operation, and between oil exploration and production, together with the analysis of the benefits of a central graphical database, are also included. The thesis includes a bibliographic review, related to the problems and solutions analyzed, and also the methodology that has been developed, including observation, interviews, discussions, and analysis with professionals from the mining and petroleum industry. The thesis uses as a case study the oil shale mine Rio das Pedras (a mine from PETROBRAS, in São Mateus do Sul, Paraná). A brief description of this mine, and the reasons for its use on this study, related to the fact that it combines oil and mining engineering, are also presented here. The results of the research includes the development of an information management model, an oil production chain model, and models for processes mapping and virtual reality. These results were presented at international events like Rio Oil & Gas Expo and Conference, in 2006, and SIAEM, in 2004. Through the simulation of basic operations, as ore transport to the plant, and with the aid of the most advanced software tools available, it was verified how the data could be easily obtained, and how these technologies could be improved - it is already possible to integrate some mining and oil industry aspects - with a quite favorable forecast for its future use in several applications in the mining and petroleum industry.

Page generated in 0.1621 seconds