• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 21
  • 2
  • 1
  • 1
  • Tagged with
  • 26
  • 14
  • 6
  • 6
  • 5
  • 5
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Bootstrap ponderado : uma avaliação numérica

Chaves Inácio, Felipe January 2004 (has links)
Made available in DSpace on 2014-06-12T18:06:19Z (GMT). No. of bitstreams: 2 arquivo7260_1.pdf: 401929 bytes, checksum: 7ec81ac7441668b14404182e76dcee1c (MD5) license.txt: 1748 bytes, checksum: 8a4605be74aa9ea9d79846c1fba20a33 (MD5) Previous issue date: 2004 / Em modelos de regressão linear em que os erros são heteroscedásticos, a prática comum é utilizar o estimador de mínimos quadrados ordinários para a estimação dos parâmetros juntamente com um estimador consistente da matriz de covariâncias dessas estimativas que, em geral, é o estimador desenvolvido por White (1980) ou uma de suas variantes. Entretanto, estimadores da matriz de covariâncias baseados em esquemas de bootstrap têm-se mostrado boas alternativas aos estimadores tradicionais. Em especial o estimador desenvolvido por Cribari?Neto & Zarkos (2004), em que a probabilidade de seleção dos resíduos é ponderada pelo inverso do grau de alavancagem, apresenta desempenho superior aos estimadores consistentes tradicionais, principalmente em situações não-balanceadas em que há observações potencialmente influentes. Utilizando simulações de Monte Carlo, foi analisada neste trabalho a sensibilidade desse estimador a diferentes formas de reamostragem através da análise do comportamento de novos estimadores que utilizam outras probabilidades de seleção dos resíduos. Adicionalmente, investigou-se a sensibilidade da inferência baseada neste e em outros estimadores a situações de não-normalidade dos erros
2

Estimador ponderado que compensa a ausência de resposta: uma aplicação / Pondered estimator to compensate for the lack of response: an application

Silva, Nilza Nunes da 09 December 1986 (has links)
Como tentativa para compensar a ausência de resposta, aplicou-se o estimador ponderado por pesos amostrais nos dados de um inquérito domiciliar que registrou uma taxa global de resposta igual a 79,10 por cento . O procedimento procurou viabilizar a aplicação do ajuste ao nível dos elementos, usando os pesos obtidos a partir da taxa diferencial de resposta verificada na amostra composta pelas famílias. Fixado o número de cômodos do domicílio como a variável critério para a formação das classes ponderadas, calcularam-se as médias ajustadas e suas variâncias para o peso e a estatura dos menores de 19 anos, usando-se as estimativas calculadas na amostra constituída pelos elementos pertencentes às famílias que efetivamente responderam ao inquérito. A consistência dos resultados obtidos sugere que estudos devem ser desenvolvidos a fim de buscar soluções que minimizem as pressuposições necessárias à aplicação do procedimento e determinem níveis de abrangência que possam ser considerados satisfatórios. / The weighting adjustment by sample weights was applied on the data from a survey sampling with a total response rate of 79,10 per cent , in order to compensate for the unit nonresponse. The weighting factors were gotten by the differential response rate calculated on the household sample to facilitate the application procedure. The variable used to define the weighting classes was the number of rooms of the dwellings. Also, the adjusted means and their variances were calculaled for weight and height of persons with ages under 19 years, using the measures obtained from the same age group individuals related to the respondent households. The consistency of the results support the sugestion that more research has to be done to search for procedures that will minimize the necessary assumptions that underlie them and that can assure wider application levels.
3

Estimador ponderado que compensa a ausência de resposta: uma aplicação / Pondered estimator to compensate for the lack of response: an application

Nilza Nunes da Silva 09 December 1986 (has links)
Como tentativa para compensar a ausência de resposta, aplicou-se o estimador ponderado por pesos amostrais nos dados de um inquérito domiciliar que registrou uma taxa global de resposta igual a 79,10 por cento . O procedimento procurou viabilizar a aplicação do ajuste ao nível dos elementos, usando os pesos obtidos a partir da taxa diferencial de resposta verificada na amostra composta pelas famílias. Fixado o número de cômodos do domicílio como a variável critério para a formação das classes ponderadas, calcularam-se as médias ajustadas e suas variâncias para o peso e a estatura dos menores de 19 anos, usando-se as estimativas calculadas na amostra constituída pelos elementos pertencentes às famílias que efetivamente responderam ao inquérito. A consistência dos resultados obtidos sugere que estudos devem ser desenvolvidos a fim de buscar soluções que minimizem as pressuposições necessárias à aplicação do procedimento e determinem níveis de abrangência que possam ser considerados satisfatórios. / The weighting adjustment by sample weights was applied on the data from a survey sampling with a total response rate of 79,10 per cent , in order to compensate for the unit nonresponse. The weighting factors were gotten by the differential response rate calculated on the household sample to facilitate the application procedure. The variable used to define the weighting classes was the number of rooms of the dwellings. Also, the adjusted means and their variances were calculaled for weight and height of persons with ages under 19 years, using the measures obtained from the same age group individuals related to the respondent households. The consistency of the results support the sugestion that more research has to be done to search for procedures that will minimize the necessary assumptions that underlie them and that can assure wider application levels.
4

Minimização do atraso total ponderado na programação de máquinas diferentes em paralelo com elegibilidade. / Scheduling unrelated parallel machines with eligibility for minimizing total weighted tardiness.

Augusto Otto Molke 29 October 2018 (has links)
Este trabalho trata do problema de sequenciamento e programação de atividades em máquinas diferentes em paralelo, considerando elegibilidade de máquina, e tempo de liberação das máquinas e das atividades com o objetivo de minimizar o custo de atraso total. Tal problema é descrito pela literatura como NP-hard. Foi proposto um método otimizante que envolve modelagem matemática, um algoritmo de geração de colunas e, além disso, uma heurística para tratar problemas com instancias maiores. O algoritmo de geração de colunas é baseado no método proposto por Akker, Hurkens e Savelsbergh (2000), que foi adaptado para o problema de múltiplas máquinas diferentes. Assim, o método foi aplicado em instâncias da literatura e em instâncias geradas para este trabalho de até 25 atividades e 4 máquinas. Os resultados foram analisados e observou-se que o modelo de programação inteira mista e eficiente para encontrar limitantes superiores de boa qualidade. Por outro lado, o algoritmo de geração de colunas é eficiente para encontrar limitantes inferiores para o problema. Desta forma, o método proposto utiliza o modelo MILP e o algoritmo de geração de colunas de maneira a se complementar. Assim, soluções ótimas foram encontradas para 84% das instancias geradas, sendo que o GAP médio para as instancias restantes foi de 2,1%. A heurística proposta e baseada na ideia de heurística construtiva probabilística, que foi apresentada por Arcus (1965). Ela foi executada na massa de dados gerada, resultando em um GAP médio de 10,6%. / This paper deals with the problem of scheduling activities in unrelated parallel parallel, considering machine eligibility, and machine and activity release time in order to minimize total weighted tardiness.Such a problem is described in the literature as NPhard. It has been proposed an optimizing method that involves mathematical modeling and a column generation algorithm, in addition, it is proposed a heuristic to treat problems with larger instances. The column generation algorithm was based on the method proposed by Akker, Hurkens e Savelsbergh (2000), which has been adapted to the problem of multiple diferent machines. Thus, the method was applied in instances of the literature and in instances generated for this paper up to 25 jobs and 4 machines. The results were analyzed and it was noted that the mixed integer programming model is eficient to find good quality upper bounds. On the other hand, the column generation algorithm is eficient to find lower bounds for the problem. Therefore, the proposed method uses the MILP model and the column generation algorithm to complement each other. Thus, optimal solutions were found for 84 % of the generated instances, with the mean GAP for the remaining instances being 2.1 %. The proposed heuristic is based on the idea of probabilistic constructive heuristics, which was presented by Arcus (1965). It was run on the mass of data generated, resulting in an average GAP of 10,6%.
5

Minimização do atraso total ponderado na programação de máquinas diferentes em paralelo com elegibilidade. / Scheduling unrelated parallel machines with eligibility for minimizing total weighted tardiness.

Molke, Augusto Otto 29 October 2018 (has links)
Este trabalho trata do problema de sequenciamento e programação de atividades em máquinas diferentes em paralelo, considerando elegibilidade de máquina, e tempo de liberação das máquinas e das atividades com o objetivo de minimizar o custo de atraso total. Tal problema é descrito pela literatura como NP-hard. Foi proposto um método otimizante que envolve modelagem matemática, um algoritmo de geração de colunas e, além disso, uma heurística para tratar problemas com instancias maiores. O algoritmo de geração de colunas é baseado no método proposto por Akker, Hurkens e Savelsbergh (2000), que foi adaptado para o problema de múltiplas máquinas diferentes. Assim, o método foi aplicado em instâncias da literatura e em instâncias geradas para este trabalho de até 25 atividades e 4 máquinas. Os resultados foram analisados e observou-se que o modelo de programação inteira mista e eficiente para encontrar limitantes superiores de boa qualidade. Por outro lado, o algoritmo de geração de colunas é eficiente para encontrar limitantes inferiores para o problema. Desta forma, o método proposto utiliza o modelo MILP e o algoritmo de geração de colunas de maneira a se complementar. Assim, soluções ótimas foram encontradas para 84% das instancias geradas, sendo que o GAP médio para as instancias restantes foi de 2,1%. A heurística proposta e baseada na ideia de heurística construtiva probabilística, que foi apresentada por Arcus (1965). Ela foi executada na massa de dados gerada, resultando em um GAP médio de 10,6%. / This paper deals with the problem of scheduling activities in unrelated parallel parallel, considering machine eligibility, and machine and activity release time in order to minimize total weighted tardiness.Such a problem is described in the literature as NPhard. It has been proposed an optimizing method that involves mathematical modeling and a column generation algorithm, in addition, it is proposed a heuristic to treat problems with larger instances. The column generation algorithm was based on the method proposed by Akker, Hurkens e Savelsbergh (2000), which has been adapted to the problem of multiple diferent machines. Thus, the method was applied in instances of the literature and in instances generated for this paper up to 25 jobs and 4 machines. The results were analyzed and it was noted that the mixed integer programming model is eficient to find good quality upper bounds. On the other hand, the column generation algorithm is eficient to find lower bounds for the problem. Therefore, the proposed method uses the MILP model and the column generation algorithm to complement each other. Thus, optimal solutions were found for 84 % of the generated instances, with the mean GAP for the remaining instances being 2.1 %. The proposed heuristic is based on the idea of probabilistic constructive heuristics, which was presented by Arcus (1965). It was run on the mass of data generated, resulting in an average GAP of 10,6%.
6

Espectro do laplaciano ponderado e hipersuperfícies em gradient Ricci solitons

Santos, Adina Rocha dos 01 August 2016 (has links)
We obtain upper estimates to the greatest lower bound of the essential spectrum of weighted Laplacian operator of non-compact weighted manifold under assumptions of the weighted volume growth. Furthermore, we find examples where the equality occurs in the es- timates obtained. As a consequence, we give estimates for the weighted mean curvature of complete noncompact hypersurfaces into weighted manifold with with finite index f-stability. Although we show that given a hypersurface isometrically immersed in a Ricci soliton gradient weighted with constant weighted mean curvature, finite weighted volume and satisfying more some conditions, has index of f-stability greater than or equal to two. / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / Obtemos estimativas superiores do ínfimo do espectro essencial do operador Laplaciano pon- derado de variedades ponderadas não compactas e completas, assumindo condições de cres- cimento de volume ponderado. Além disso, encontramos exemplos onde ocorre a igualdade em tais estimativas. Como uma aplicação, estimamos a curvatura média ponderada de hiper- superfícies imersas isometricamente em variedades ponderadas com índice de f-estabilidade finito. Mostramos ainda que dada uma hipersuperfície imersa isometricamente em um gradient shrinking Ricci soliton com curvatura média ponderada constante, volume ponderado finito e satisfazendo mais algumas condições, tem índice de f-estabilidade maior que ou igual a dois.
7

Qualidade do solo em áreas restauradas no estado de São Paulo

Sanglade, Lucas Dias 08 May 2015 (has links)
Submitted by Luciana Sebin (lusebin@ufscar.br) on 2016-09-21T12:34:57Z No. of bitstreams: 1 DissLDS.pdf: 1642291 bytes, checksum: 745a8cbfe2eeb392253fc4364b0d4c3b (MD5) / Approved for entry into archive by Marina Freitas (marinapf@ufscar.br) on 2016-09-23T18:20:44Z (GMT) No. of bitstreams: 1 DissLDS.pdf: 1642291 bytes, checksum: 745a8cbfe2eeb392253fc4364b0d4c3b (MD5) / Approved for entry into archive by Marina Freitas (marinapf@ufscar.br) on 2016-09-23T18:20:47Z (GMT) No. of bitstreams: 1 DissLDS.pdf: 1642291 bytes, checksum: 745a8cbfe2eeb392253fc4364b0d4c3b (MD5) / Made available in DSpace on 2016-09-23T18:20:51Z (GMT). No. of bitstreams: 1 DissLDS.pdf: 1642291 bytes, checksum: 745a8cbfe2eeb392253fc4364b0d4c3b (MD5) Previous issue date: 2015-05-08 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / Ecological restoration is an emerging field of restoration ecology, and is widely used as an important tool for biodiversity conservation. However, appropriate indicative allocations of soil quality for the assessment and monitoring of forest restoration projects are still scarce. The objective of this study was to evaluate soil quality of four restored forests of different ages, a forest remnant and their agricultural surroundings in the State of São Paulo through chemical, physical and microbiological soil parameters by categorization by the weighted additive model. To measure the discrimination of soils due to the different locations and types of land use, the weighted additive model, along with a soil quality index (SQI) and principal component analysis (PCA) were used. The PCA differentiated the forests of their agricultural environments and locations with a prevalence of physical and chemical parameters in the distinction between the matrices. The parameters soil organic matter, total cation exchange capacity, phosphorus, soil bulk density, porosity, microbial biomass carbon and microbial activity had higher averages in the forests matrices, being higher in older forests. There was differentiation in soil quality of the studied forests, where the highest rates were obtained in the remaining forest soils and older restored forests. All forest areas showed higher rates compared to their respective agricultural environments. Finally, the SQI used were efficient for the identification of the areas, having potential as a tool to support decision-making on environmental issues. / A restauração ecológica é uma área emergente da ecologia da restauração, sendo amplamente empregada como uma importante ferramenta para a conservação da biodiversidade. Contudo, subsídios indicativos da qualidade do solo apropriados para a avaliação e monitoramento de projetos de restauração florestal ainda são escassos. O objetivo deste trabalho foi avaliar a qualidade do solo de quatro florestas restauradas de diferentes idades, um remanescente florestal e seus respectivos entornos agrícolas no Estado de São Paulo através de seus atributos químicos, físicos e microbiológicos por categorização pelo modelo aditivo ponderado. Para discriminação dos solos em função das diferentes localidades e tipos de cobertura foram utilizados o MAP, juntamente com um índice de qualidade do solo (IQS) e análises de componentes principais. As análises de componentes principais diferenciaram as florestas de seus entornos agrícolas e localidades, havendo predomínio de parâmetros físicos e químicos na contribuição para a distinção entre as matrizes. Os parâmetros matéria orgânica do solo, capacidade de troca catiônica total, teor de fósforo, densidade do solo, porosidade total, carbono da biomassa microbiana e atividade microbiana apresentaram médias superiores sob as matrizes florestais, sendo maiores nas florestas mais antigas. Houve diferenciação na qualidade do solo das florestas estudadas, onde os maiores valores de IQS foram obtidos nos solos do remanescente florestal e nos projetos de restauração florestal mais antigos. Todas as áreas florestais apresentaram maiores valores de IQS em comparação a seus respectivos entornos agrícolas. Conclui-se que o modelo utilizado para o cálculo do IQS foi eficiente na diferenciação das áreas, tendo potencial como ferramenta no auxílio da tomada de decisões na temática ambiental.
8

Formulações matemáticas para o problema de sequenciamento de lotes com penalidades por atraso

Araújo, Katyanne Farias de 04 July 2016 (has links)
Submitted by Fernando Souza (fernandoafsou@gmail.com) on 2017-08-16T11:42:54Z No. of bitstreams: 1 arquivototal.pdf: 2606529 bytes, checksum: e6d5e9c7169bad77fb641468b804b962 (MD5) / Made available in DSpace on 2017-08-16T11:42:54Z (GMT). No. of bitstreams: 1 arquivototal.pdf: 2606529 bytes, checksum: e6d5e9c7169bad77fb641468b804b962 (MD5) Previous issue date: 2016-07-04 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior - CAPES / The problem of scheduling on a single machine, proven to be NP-hard, consists of de ning the job grouping in batches and of the sequence in which these batches will be processed on a machine. Each job is associated with a release date, a processing time, a due date, a priority level in relation to the others and a size. The machine is able to process a group of jobs (batch) simultaneously, provided that the sum of the job sizes belonging to the referred batch does not exceed the machine capacity. Each job must be processed only once and only one batch is processed at a time on the machine. In this work, we consider the objective as the minimization of total weighted tardiness, where the tardiness of a job is the di erence between its completion time and its due date, in case the job processing is nished after its due date and hence is late, or equals zero, otherwise. In the literature, this problem is usually referred to as 1jbatch; rj ; sj ; comptjPwjTj . When all jobs are available to be processed at time zero, the problem is usually represented as 1jbatch; sj ; comptjPwjTj . These problems are still poorly explored in the literature and in addition, cover a large number of variant forms. There are few studies involving the application of exact methods for solving both. Only one mathematical formulation was identi ed in the literature for these problems. Hence, four time-indexed formulations were developed to solve the aforementioned problems, one of which is capable of dealing with both problems. The results achieved by the developed models were compared between themselves and with the results of the model available in the literature. These computational results reveal that two of the proposed models obtained higher performance both in terms of quality of the solution, particularly regarding the achieved lower bounds, and in numbers of open nodes and of proven optimal solutions. / O problema de sequenciamento de lotes da produ c~ao em uma m aquina, comprovadamente tido como NP-dif cil, consiste na de ni c~ao do agrupamento de tarefas em lotes e da sequ^encia em que estes ser~ao processados em uma m aquina. Cada tarefa est a associada a uma data de libera c~ao, um tempo de processamento, uma data de entrega, um n vel de prioridade em rela c~ao as demais, e um tamanho. A m aquina e capaz de processar um conjunto de tarefas (lote) simultaneamente, contanto que a soma dos tamanhos das tarefas pertencentes ao referido lote respeite a capacidade da m aquina. Cada tarefa deve ser processada apenas uma vez e somente um lote e processado por vez na m aquina. Neste trabalho, considera-se como objetivo a minimiza c~ao do total de atrasos ponderados, onde o atraso de uma tarefa e igual ao seu tempo de t ermino menos a sua data de entrega, caso o processamento da tarefa seja nalizado ap os a sua data da entrega e, portanto, em atraso, e e igual a zero, caso contr ario. Na literatura, este problema e geralmente referenciado como 1jbatch; rj ; sj ; comptjPwjTj . Quando todas as tarefas est~ao dispon veis para serem processadas no instante de tempo zero, o problema e usualmente representado por 1jbatch; sj ; comptjPwjTj . Estes s~ao problemas ainda pouco investigados na literatura e, al em disso, abordam uma grande quantidade de variantes. Existem poucos trabalhos envolvendo a aplica c~ao de m etodos exatos para a resolu c~ao de ambos. Apenas uma formula c~ao matem atica foi identi cada na literatura para estes problemas. Dessa forma, quatro formula c~oes matem aticas com vari aveis indexadas no tempo foram desenvolvidas para resolver os problemas mencionados anteriormente, das quais uma e capaz de tratar de ambos os problemas. Os resultados alcan cados por meio dos modelos desenvolvidos foram comparados entre si e com os resultados do modelo dispon vel na literatura. Tais resultados computacionais demonstram que dois dos modelos propostos obtiveram desempenho superior tanto em termos de qualidade da solu c~ao, em especial em rela c~ao aos limites inferiores alcan cados, quanto em n umeros de n os abertos e quantidade de solu c~oes otimas comprovadas.
9

[en] GAS MODELS APPLIED TO TIME SERIES OF STREAMFLOW AND WIND / [pt] MODELOS GAS APLICADOS A SERIES TEMPORAIS DE VAZAO E VENTO

GILSON GONCALVES DE MATOS 04 October 2013 (has links)
[pt] Os modelos GAS (generalized autoregressive score) são modelos de séries temporais com parâmetros variantes no tempo, os quais possuem sua evolução ditada pelo vetor score ponderado da função de verossimilhança. A avaliação da verossimilhança nestes modelos é bastante simples, bem como incorporação de efeitos como assimetria, memória longa e outras dinâmicas. Por serem baseados no score da verossimilhança, exporta-se a estrutura completa da distribuição preditiva para o mecanismo de atualização dos parâmetros, e não apenas a média ou momentos de ordem superior. Estas características, somadas á capacidade de lidar com processos multivariados e não estacionários, tornam a classe em estudo uma nova alternativa para a construção de modelos com parâmetros variantes, particularmente para séries temporais não gaussianas. Nesta dissertação, foram desenvolvidos modelos GAS univariados para a análise das séries mensais de vazão do Rio Paraibuna (MG) e de fator de capacidade de uma usina é olica não divulgada do Nordeste, utilizando as distribuições gama e beta, respectivamente. Além disso, foi derivado um novo modelo GAS bivariado com marginais gama e beta para a modelagem conjunta dos processos de vazão e vento, de modo a explorar a complementaridade sazonal entre as séries. / [en] The GAS models (generalized autoregressive score) are time series models with time-varying parameters, which have their update mechanism drived by the scaled score of the likelihood function. The likelihood evaluation in these models is quite simple, as well as the incorporation of effects like asymmetry, long memory and other dynamics. Because they are based in the scaled score of the likelihood, it exploits the full structure of the predictive distribution to the update mechanism of the parameters, and not just mean or higher order moments. These characteristics, coupled with the ability to handle with multivariate and non-stationary processes, make the studied class a new alternative to the construction of models with time-varying parameters, particularly for non-Gaussian time series. In this dissertation, univariate GAS models were developed to analyze monthly series of streamflow of Paraibuna river (MG) and of capacity factor of a wind farm undisclosed in Northeast, using the gamma and beta distributions, respectively. In addition, a new bivariate GAS model with gamma and beta marginals was derived for the joint modeling of the streamflow and wind processes, in order to explore the seasonal complementarity between the series.
10

[en] COST OF CAPITAL FOR BRAZILIAN SECTOR OF ELECTRICITY DISTRIBUTION / [pt] CUSTO DE CAPITAL DO SETOR DE DISTRIBUIÇÃO ELÉTRICO BRASILEIRO

BIANCA DE PAULA MONTENEGRO 08 May 2015 (has links)
[pt] No Brasil, assim como em outros países, a prestação de serviço público de energia elétrica é realizada em concessão sob a coordenação de um órgão regulador independente, atividade que no Brasil é desempenhada pela Aneel – Agência Nacional de Energia Elétrica. É também competência da Aneel a estimação do WACC regulatório – custo médio ponderado de capital do setor elétrico, que remunerará o capital dos investidores do setor, por intermédio das tarifas, até o final do ciclo de revisão tarifária vigente, que ocorre em média a cada cinco anos. Para tanto, o regulador se utiliza de dados da economia norte - americana adaptados para a realidade local, por entender que a bolsa brasileira possui limitações no que tange a consistência das séries. Imprecisões no cálculo do WACC podem levar a concessionária a perceber ganhos adicionais, no caso de uma taxa superestimada, ou perdas, no caso de uma taxa subestimada, podendo resultar em uma possível redução nos investimentos que poderiam afetar a qualidade no serviço prestado ou planos de expansão. Passam por tanto a ser de interesse de toda a sociedade discussões em torno de um aprimoramento da metodologia aplicada na estimação do custo de capital do setor. A proposta apresentada neste trabalho é estimar o custo médio ponderado de capital do setor de distribuição elétrico brasileiro, por meio de aprimoramentos na metodologia atual adotada pelo órgão regulador do setor, alinhando com as melhores práticas da teoria de finanças. Os resultados apontam para a necessidade de aprofundamento de discussões pelo regulador considerando algumas alternativas nos critérios de estrutura de capital, taxa livre de risco, risco-país e prêmio de risco de crédito. / [en] In Brazil, as in other countries public utilities are operated as concessions under the coordination of an independent regulatory agency, a role played in Brazil by Aneel– National Agency of Electricity. It is also Aneel s responsibility the estimation of regulatory WACC – weighted average cost of capital of the electricity sector which remunerates investors capital through tariffs until the end of the current tariff review cycle that occurs on average every 5 years. For that the regulator based the calculation of the WACC on American economic data adapted to Brazil reality assuming that data from Brazilian stock exchange series have some limitation. Inaccuracies in the WACC can lead to companies obtaining additional gains in the case of an overestimated rate, or losses in the event of an underestimated, which might result in reduction in investments and could affect the quality of service or expansion plans. Therefore, it is in the interest of society to discuss improvements of the methodology applied in estimating the cost of capital in the sector. This study aims to estimate the weighted average cost of capital of the Brazilian electricity distribution sector through improvements in current methodology adopted by the regulatory agency, aligning it with finance theory best practices. Results indicate the need for deeply discuss from the regulator about some alternatives improvement in the capital structure, risk free rate, country risk and credit risk premium.

Page generated in 0.0653 seconds