• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Produktionsflödesanalys : Förstudie av nya produktionsflöden för golvprodukter / Productions flow analysis : Preliminary study of new production flows for floor products

Svensson, Joel, Ideström, Gabriel January 2019 (has links)
Examensarbetet genomfördes i samarbete med Tarkett AB i Ronneby med syfte att konstruera ett nytt produktionsflöde vilket ska minska stopp i flödet samt nå en produktionsökning på 15%. Det nya flödet ska sedan planeras i den givna hallen. Leanprinciper är grunden för det nya flödet och metoder som värdeflödesanalys och ledningsverktyg används för att göra en nulägesbeskrivning. Information samlades in genom observationer som utfördes genom “att gå längs flödet”, intervjuer och teorin kring lean för att analysera flödet. Värdeflödesanalys gjordes på det befintliga flödet för att sedan kunna skapa framtida flöden. Idégenerering utfördes för att få fram olika koncept till nya alternativa flöden. Dessa koncept har sedan utvärderats genom verktyg och med generell bedömning. Ett koncept har valts ut att gå vidare med för fortsatt analys och försök att planera i den givna hallen för att få en förståelse hur flödet skulle fungera med de begränsningar som finns. En värdeflödesanalys gjordes för det befintliga flödet för att få överblick och ta fram värdehöjande och icke värdehöjande aktiviteter. Flödet begränsas av produktionsstopp på grund av aktiviteter som är icke värdehöjande och en flaskhals i produktionen som begränsar hastigheten på hela flödet. Alternativa flöden har tagits fram. Det flöde som valdes är ett lådflöde där materialet fylls i lådor för att sedan skickas vidare till maskinen som producerar golv av materialet. Lådorna kan fyllas 15 % snabbare men flaskhalsen kan fortfarande ej ta emot denna ökning. Lösningen blir kontinuerligt flöde på alla processer som det går att ha ett kontinuerligt flöde och ett buffertlager som förbrukas med jämna mellanrum där material i lådor minskar produktionsstopp eftersom lådorna ej är direkt kopplade till resten av linjen och därmed inte blir direkt påverkad utan fortsatt tillverkning kan ske. Flaskhalsen kan inte reduceras, men med lådflöde kan buffertlager användas. Med detta kan material från extrudern (råmaterial) som egentligen skulle gå till att fylla lådor skickas mot en annan linje. Detta leder till att två linjer kör samtidigt och här finns produktionsökningen. Genom att undvika produktionsstopp som orsakas av det befintliga flödet kan det ge en produktionsökning på närmare 8 % och möjlighet att köra flera linjer samtidigt kan ge ytterligare produktionsökning men är svår att uppskatta. En fortsatt analys behöver genomföras av flödet innan det kan implementeras i verkligheten. / This bachelor thesis was made with the support from Tarkett AB, Ronneby. The purpose of this task was to construct a new production flow, which should minimize the stop time and also increase the production ratio with 15%. The basics for lean principles were used in order to come up with the new production flow. Also methods like value flow analysis and the seven management tools were used to make a status report of today's production flow. Information was gathered from observations, which came from inspections of the machines that are meant to be used in the new flow, interviews and also theory about lean production. A value stream mapping was made on the already existing production flow, in order to create new ideas for the new production flow. These ideas were then evaluated with tools and general assessment, where the best concept was chosen to move on with further analysis. The next step was to plan the placement of machines and plan the forklift traffic at the given area. This will gave an understanding on how the new flow could work with the known limitations. The result shows a value flow analysis for the already existing production flow, which gives an overview on how to collect value-added and non-valueadded activities. The flow is restricted by stoppages due to the non-valueadded activities and bottlenecks. Alternative flows have been considered in the result, but the chosen flow is called box flow. With this concept the material will be filled in big boxes that can hold up to 1.1 tons of granulate. These boxes will then be stored in a warehouse until it’s collected and sent towards the machine which will use the material to produce the given amount of floor mat. The boxes can be filled 15 % faster, but the bottleneck will still not be able to keep up with this production increase. This was solved with a continuous flow on all processes and a buffer stock that will need to be continuously consumed from time to time. The bottleneck won’t increase in production speed, but with the box flow a buffer stock can be used. With this flow the material from extrusion (raw material) can be sent to other production lines. Which leads to two lines running simultaneously and here is the production increase. By avoiding production stops that are inflicted by the existing production flow, a production increase that is closer to 8 % can be performed and a possibility to increase it even further if more production lines can run at the same time. However, the production increase when taking the other production lines to account is hard to estimate. A continued analysis needs to be carried through to implement the new flow at Tarkett.

Page generated in 0.1164 seconds