Spelling suggestions: "subject:"revis""
1 |
Standardisering och kalkylering av maskinhallarVasic, Darko January 2011 (has links)
This thesis has been carried out on behalf of Lindborg & Sons in Örsundsbro and is a concluding part of the Bachelor of Science program in Construction Engineering at Uppsala University. The aim of the project is to make a plea for a database of good examples of the machine room types using Revit drawing program, and work out a corresponding worksheet . At the start of the process it became apparent that there were some difficulties in using Revit to creating machine room types of the variety which the company builds. For modelling of oblique, curved and irregular lines, I had to use my AutoCAD Architecture and then import them into Revit. The creation of calculus in Excel was time consuming. On the other hand, it is a one-time work to create the template. The advantage of Excel is that there is no need for a re-calculation at the cost of various types of machine hall. All that is needed is to replace the various parameters. A further advantage of Excel is that Microsoft Office is available in most computers, which means that no additional costs are required. When Excel is used, a basic template is created in which the parameters can easily be changed and amended. This generates a new spreadsheet. It is not necessary to do the drawing, which you must do if you only use Revit. In the work, other solutions for cost estimates are briefly discussed.
|
2 |
Jämförelse av programvaror för konstruktion i råa punktmolnEriksson, Martin, Grönlund, Karl January 2011 (has links)
Laser scanning is a method of surveying that has evolved rapidly in recentyears. The technique is based on a laser scanner set up, which can document a structureusing pulsed laser beams. Each time the laser hits a surface it is partly reflectedback to the scanner that stores the point. By using strategically placed targets, storedpoints from different scans can be merged into a point cloud. A point cloud is avisualization of the scanned object with a very high accuracy. The point cloud is thenimported into appropriate software to create a simplification of the object, which thencan be usedin a design or construction tool.The large amount of information that point clouds result in is oftendifficult to manageand simplifications must be done. The purpose of this study is toexplore the possibility to skip this step. In collaboration with Ma'ttja'nstAB, the market will be searched for appropriate software and plug-ins that can handlethis. Some criteria for good software are being able to automatically generatesurfaces, checking the accuracy of the result and in a user-friendly way be able tonavigate through the point cloud. In this study point clouds from Autodesk were used,this were practical because no conversion of the format was needed.Autodesk Revit Architecture and AutoCAD were the design tools that were selectedfor this study. These two programs have recently developed a format compatiblewith large point clouds. Plugins that werealso looked into are Scan To BIM (Revit), ShapeExtraction (AutoCAD) and Kubit pointcloud (AutoCAD). All programs arecompatible with the point cloud format PCG11.This study could establish that it is possible to skip the simplification
|
3 |
Flervåningshus med limträstomme. : Planering och dimensionering av höghus på Fören 1, Karlstad / Multi-story building with glulam frame : Planning and sizing of multi-storey buildings at Fören 1, KarlstadHolm, Herman, Blomberg, Viktor January 2016 (has links)
Världen står inför stora utmaningar när det kommer till miljön och byggsektorn har idag en stor miljöpåverkan, främst när det kommer till koldioxidutsläpp. De två mest använda byggnadsmaterialen idag, stål och betong har visats tillföra otroliga mängder koldioxid till atmosfären och är därför inte rätt väg att gå för en hållbar framtid. Trä som byggnadsmaterial är det enda förnyelsebara materialet av dessa tre och har visat på stora minskningar av koldioxidutsläpp i jämförelse med stål och betong. Kvarteret fören 1 i Karlstad är ett område där Karlstad kommun har tänkt uppföra tre höghus och valdes därför som utgångspunkt för detta arbete. Målet var att dimensionera det högsta huset med limträstomme och samtidigt följa planprogrammets vision. För att göra detta användes programmet Revit Structure för att rita huset och Robot Structural Analysis för att dimensionera. Huset dimensionerades för egentyngd, nyttig last, snölast, vindlast och brand enligt svenska standarder. Efter att Robot Strucural Analysis redovisat de krafter, moment etc. som lasterna gav upphov till används handberäkningar för att hitta rätt dimension för varje byggdel. Resultatet visade att limträstomme är ett rimligt alternativ till andra byggnadsmaterial för det 15-våningar höga huset som beräknats. Detta gav samtidigt ett unikt och attraktivt utseende på byggnaden. Det dimensionerade huset och två andra hus med liknande arkitektur planerades på tomten och en arkitektonisk bild framtogs för att ge en bild över resultatet. / The world stands before large challenges when it comes to the environment and today the construction sector has a huge impact on the environment, especially when it comes to carbon dioxide emissions. Two of the most used construction materials today, steel and concrete have shown to bring large amounts of carbon dioxide to the atmosphere and is therefore not the way to go to a sustainable future. Of these three materials, wood is the only renewable construction material and it has a lot less carbon dioxide emissions compared to steel and concrete. Fören 1 in Karlstad is an area where Karlstad municipality is planning to build multi-storey buildings and therefore this area was chosen as a starting point for this thesis. The goal was to size the tallest building with a glulam frame but at the same time follow the vision in the planning program. To make this happen Revit Structure was used to draw the building and Robot Structural Analysis was used for calculations. The building was sized for self-weight, live load, snow load, wind load and fire according to Swedish standards. When Robot Structural Analysis showed the forces, torque etc. which the loads yielded, calculations by hand was used to find the right size for every part of the construction. The result showed that using a glulam frame is a reasonable alternative to other construction materials for the 15-storey tall building which were calculated. This gave at the same time a unique and attractive appearance to the building. The calculated building and two similar buildings were placed on the property and an architectural 3D view was produced.
|
4 |
Informationsutbyte från BIM-modeller : Från BIM-modell till format hanterbara av förvaltning- och GIS-system / Exchange of information from BIM ModelsRis, Johannes January 2014 (has links)
BIM has been a trend in recent years when it comes to design and construction of new buildings. However, there has been less talk about what happens to BIM models after the construction phase. This issue has been raised at the Forsmark construction documentation department. This thesis aims to look at how the information in a BIM model can be transferred to facility management and GIS systems and thus add value, even after the construction phase. Questions raises how such an exchange might look like and whether it is reliable. How should a claim be brought to planners for such an exchange to work. This thesis tested some of the most common methods for this kind of exchange of information from BIM models to facility management and GIS. It was formats like IFC, Fi2xml and a database connectivity that was analyzed by a computer simulation of a model provided by Forsmark. The model consisted of an existing office building at Forsmark, modeled in Autodesk Revit. The results indicate that the formats tested require a precise plotting of the models. The loss of information that came to light in the simulation could be attributed to failure modeling in Revit. Even such things as naming of areas must be consistent. To achieve more efficient naming process, test where carried out to deal with parameters outside the Revit environment. However, it did not work optimally. Support for some parameters was lost and the information that was built up in the database was too extensive.
|
5 |
Anpassning av BIM-metodik för bättre mängdavtagningPersäter, Jens, Vinka, Amanda January 2014 (has links)
Byggnadsinformationsmodellering (BIM) är det informationshanteringssystem som de flesta konsultföretag och beställare strävar att implementera. Många har redan tillämpat BIM-metodiken som en del av byggprocessen. Eftersom tekniken går framåt tvingar detta också individen att utvecklas. Svårigheter uppstår när tekniken går framåt utan att den implementeras på rätt sätt av branschen. Problem finns i överföringen av information mellan olika parter. Ett av dessa problem är vid mängdavtagningar och kalkyler. Ett företag som ligger i framkant i utvecklingen och gärna vill effektivisera processen är Sweco Architects i Uppsala. De vill med hjälp av detta examensarbete undersöka beställarens krav och önskemål gällande kalkylering och mängdavtagning. Examensarbetets syfte är att med hjälp av en intervjustudie visa vad beställaren tycker behöver förändras och förbättras inom kalkylering och mängavtagningar från projektören. Målet med arbetet blir att med hjälp av intervjustudien ta fram en metodik till projektören som följer beställarens kravställning. Metodiken riktas in mot programvaran Autodesk Revit. Slutsatsen av arbetet är att en tydligare dialog mellan beställare och projektör behövs för att kunna förbättra mängdavtagningarna, men även en bättre arbetsmetodik för litterering. För att säkerställa detta bör en branschstandard upprättas men tills dess måste kravställningen bli tydligare.
|
6 |
Framtagning av handbok till Revit StructureNilsson, Simon January 2010 (has links)
<p>Revit Structure är ett nytt 3D-modellerings program i Autodesks serie med ritprogram, speciellt utvecklad för byggnadsinformationsmodellering (BIM). Revit bygger på att användaren själv laddar in och placerar ut standardprofiler som till exempel pelare, balkar och väggar. När standardprofilerna är placerade i 3D-modellen kan de enkelt redigeras och förändras för att uppfylla de specifika kraven för just det byggnadsprojektet. </p><p> </p><p>Den här rapporten är särskilt framtagen för att underlätta en övergång mellan programmen AutoCad och Revit Structure. Med rapporten följer en handbok som ska fungera som en introduktionskurs av programmet för studenter och konstruktörer.</p><p> </p><p>Handboken börjar med att gå igenom programmets upplägg och layout. Där efter följer handboken ett byggnadsprojekt från start till mål. Varefter successivt byggnaden växer fram får användaren kunskaper om de vanliga verktygen då fler element tillförs och sammanfogas. I och med detta låter handbokens övningar användaren träna på de viktigaste verktygen på flera olika sätt och tillsammans med flera olika byggnadselement. Användaren får på det här sättet grundläggande kunskaper om programmet för att enkelt kunna fortsätta med fördjupande kurser eller mer avancerad litteratur.</p>
|
7 |
Assessing the Potential of Developing a Tool for Residential Facility Management Using Building Information Modeling SoftwareMadhani, Himanshu 1986- 14 March 2013 (has links)
Building Information Modeling (BIM) has changed the ways buildings are designed and constructed. Along with design and construction, operation and maintenance of the built facility is also gaining importance in the Architecture-Engineering-Construction industry. Facility management (FM) is widely adopted by industrial, healthcare and other types of commercial facilities for better maintenance and management of assets. BIM is being adopted in the field of Facility management and has become one of the most important tools for better application of operation and maintenance.
Facility management is performed by professionals with training and experience in the related fields of building operation, maintenance, upgrade and repair. BIM is a professional tool which requires intense training and knowledge. This tool cannot be used and is hard to understand for non-professionals and people who do not have training to use it. Management of residences is as important as management of commercial, industrial and healthcare facilities for the life and smooth running of such facilities. Residential facilities are properties with one or more residential units or buildings. These buildings could be low rise, high rise or individual units.
This thesis will help in analyzing the scope of using BIM and Application Programming Interface (API) for management of maintenance in residences by the owner who are not professionally trained. The research analyzes a single, basic function of a BIM tool to determine the potential for such a tool to help non-expert, first time user to be able to understand their residential facilities maintenance requirements. It is an attempt to propose a system which provides alerts to the owners regarding required maintenance and which shows the location of the work in a 3D model.
The system was designed and tested in Microsoft Windows 7 operating system by using Autodesk® Revit building information software to make the 3D model, a Revit API plug-in to craft the alerts and show the location of work and Open Database Connectivity (ODBC) to export the model to a web browser. The system worked through Revit program, but the concept of applying the system to work through web browser failed.
|
8 |
Framtagning av handbok till Revit StructureNilsson, Simon January 2010 (has links)
Revit Structure är ett nytt 3D-modellerings program i Autodesks serie med ritprogram, speciellt utvecklad för byggnadsinformationsmodellering (BIM). Revit bygger på att användaren själv laddar in och placerar ut standardprofiler som till exempel pelare, balkar och väggar. När standardprofilerna är placerade i 3D-modellen kan de enkelt redigeras och förändras för att uppfylla de specifika kraven för just det byggnadsprojektet. Den här rapporten är särskilt framtagen för att underlätta en övergång mellan programmen AutoCad och Revit Structure. Med rapporten följer en handbok som ska fungera som en introduktionskurs av programmet för studenter och konstruktörer. Handboken börjar med att gå igenom programmets upplägg och layout. Där efter följer handboken ett byggnadsprojekt från start till mål. Varefter successivt byggnaden växer fram får användaren kunskaper om de vanliga verktygen då fler element tillförs och sammanfogas. I och med detta låter handbokens övningar användaren träna på de viktigaste verktygen på flera olika sätt och tillsammans med flera olika byggnadselement. Användaren får på det här sättet grundläggande kunskaper om programmet för att enkelt kunna fortsätta med fördjupande kurser eller mer avancerad litteratur.
|
9 |
Visualisering av byggprojekt i Revit / Visualization of a building project in RevitAlriksson, Tobias January 2014 (has links)
Rapporten avhandlar visualiseringen i marknadsföringsstadiet av ett byggnadsprojekt med tillämpning på Trivselhus bostäder. För att få en grund till vad som ska ändras gällande företagets nuvarande visualisering har intervjuer genomförts med samtliga berörda parter. Dessa är säljare, kunder och husdesigners. Efter detta har två förslag till förändringar av nuvarande visualiseringar arbetats fram i Revit med intervjuerna som underlag.
|
10 |
Framställning av komplementbyggnader i RevitJohansson, Charlotta January 2018 (has links)
No description available.
|
Page generated in 0.0537 seconds