11 |
Most přes Mordovu rokli / Viaduct Mordava rokleOndřej, Václav January 2022 (has links)
The aim of this thesis is design of the loadbearing structure of a bridge. Out of two proposed variants was chosen prestressed girder deck of 5 spans. The bridge is built span-by-span in a formwork supported by launching girders. Calculation of load cases is made in software Midas Civil 2021 and Scia Engineer 18.1. The construction is evaluated considering the ultimate limit state and serviceability limit state. The design and evaluation were made according to valid standards.
|
12 |
nádrž ČOV / Cast-in-place tank of sewage plantSivčák, Jozef Unknown Date (has links)
The master’s thesis designs and checks the reinforced concrete tanks of sewage plant. Part of this thesis are also drawings. Tanks are designed as a watertight underground structure with aspect on standards and watertight function. Foundation slab and concrete walls were designed according to ultimate and serviceability limit states. The thesis includes design of reinforcement according to non-force effects in early stage. The structure is checked also to loss of equilibrium of a structure due to uplift by vertical actions from water pressure.
|
13 |
Nosná konstrukce polyfunkčního domu v Brně / Load bearing structure of multifunctional houseStrnad, Stanislav January 2019 (has links)
Subject of this diploma thesis is to design structural system of multifunctional building in Brno. This apartment building has 4 storey. Main load-bearing elements are concrete ceilings, columns and beams in first and second storey. In third and fourth storey are main load-bearing elements masonry and concrete ceilings with beams. Also there is prestressed beam in first storey. The structure was assessed for ultimate and serviceability limit state acording to standarts and regulation. Drawings and drawings of construction are part of the diploma thesis.
|
14 |
Návrh přemostění komunikace / Design of the bridge structure across the streetVáša, Jiří January 2019 (has links)
The diploma thesis deals with the design of the motorway bridge over the II / 464 road between Butovice-Bílovec. For the bridging design four variants were made, from which a variant of the slab with longitudinal extensions was selected for further processing. The design assessment was performed for the ultimate limit state and serviceability limit state according to valid standards. Determination of internal forces was performed on the model developed in Scia Engineer 18.0.
|
15 |
Most přes železniční trať / Bridge ower railway linePrekop, Michal January 2020 (has links)
Diploma thesis is focused on a design of the road bridge of the category S7,5 in cadastral territory of a municipality Polanka nad Odrou. Three preliminary studies have been proposed. Box girder beam with a slant walls were selected for more detailed processing. Construction of the bridge is going to be build by time-dependent analysis on a solid formwork. The calculation of load is done by using computer software Midas Civil 19 v 2.1. and Scia Engineer 19.1. Selected preliminary was assessed according to the recent Europan standards.
|
16 |
Most nad místní komunikací a potokem / Bridge over a local road and a brookŠvancara, Marek January 2020 (has links)
The topic o thlis thesis is design of the structure of a bridge. The beam structure is chosen from three variants of the solution, the structure is formed by a bracket above the pillars and prepared prestressed beams. Various construction procedures have been verified and assessed for the serviceability and load-bearing limit states according to the applicable standards and regulations. Drawing documentation and static calculation are processed.
|
17 |
Most přes řeku Jevišovku / Bridge over the Jevišovka riverČípek, Luboš January 2019 (has links)
This thesis focuses on design and assessment of load-bearing construction of a bridge over Jevišovka river at road I/53 near Lechovice. The bridge was designed as a trapezoidal cross-section slab. This solution was chosen from three sketch eventualities. The work includes an implementing engineering report, construction process report and report about static-analysis, the attachments include the sketch, vizualization, drawings, component drawing, construction process and the static-analysis of this structure. Computing of internal forces was performed by computational software Scia Engineer 17.
|
18 |
Mostní konstrukce přes údolí / Bridge structure over the valleyHroudná, Denisa January 2019 (has links)
The subject of this diploma thesis is the design of post-tensioned road bridge over the valley. Two preliminary studies have been proposed and one of them was selected for more detailed processing. The selected variant is a box girder with a constant height 2,5 m. The construction id divided into five span and its total lenght is 240 m Span length of construction is 18,0 m. The construction was assessed for ultimate and serviceability limit state acording to standarts and regulation. Drawings and vizualizations ard parts of the diploma thesis.
|
19 |
Vícepodlažní budova / Multi-storey buildingHrycík, Martin January 2014 (has links)
Thesis deals with design of steel structure multi-storey office building. Specifically, it is the eight-storey steel structure of rectangular plan with dimensions of 15.4 x 54.4 m and a height of 29.2 meters. The structure is designed for the site Brno. Static calculation is solved by a combination of manual calculation and calculation using software Scia. It is designed structural arrangement, static action, load analysis, calculation of internal forces, the design of dimensions and connections solutions. Thesis includes drawing documentation. The structure is designed in a variant with a frame joints and in variant with articulated joints. Variant with articulated joints is further processed.
|
20 |
Víceúčelová hala v Holicích / Multipurpose hall in HoliceRückerová, Eva January 2014 (has links)
Master´s thesis deals with the design and assessment of the roof construction of the multi-purpose hall in Holice. The other two dimensions of the hall are 28 x 45 m. Height of the hall is 11,28 m. Roofing is done in three variants. The final solution is processed for one presentation. The main supporting element is formed by cross-linking arc beam made of laminated wood. Girders are spaced 5 m and connected purlins. Stability of the construction by three field bracings. The cladding is a rafter, shuttering of OSB particle that carry the roof deck.
|
Page generated in 0.1236 seconds