91 |
Montovaná konstrukce haly / Assembled structure of hallBartosch, Václav January 2017 (has links)
Master´s thesis describes the design and static calculating of selected elements of prefabricated reinforced concrete hall with bulit-in office, elaboration of basic drawings of the project documentation, shape and reinforcemenet drawings of these selected structural prefabricated elements. The work also includes technical report, details of selected element´s contacts, drawing of plates and study of the behavior of reinforced buildings. Calculation was performed by using a computer program AxisVm, Microsoft Excel a IDEA StatiCa
|
92 |
Undersökning av grundläggningsmetod, kantbalkar utförda med glas, polystyren och korslimmat-trä.Eliasson, Daniel, Carlsson, Olle January 2023 (has links)
Byggbranschen bidrar till stora utsläpp av växthusgaser, och det är därför viktigt att utforska hållbara material för att minska påverkan. Studien fokuserar på grundfundament för mindre trähus i Sverige, där betong i platta på mark ersätts med korslimmat trä (KLT) för att reducera klimatpåverkan. Eftersom betong har hög tryckhållfasthet gjordes analys av kantbalkens kapacitet. Fyra alternativ på kantbalkar undersöks: KLT/EPS400, KLT/Foamglas, KLT/EPS s100 och EPS400. Studien bedömer även den nuvarande dimensioneringen i hållfasthetsberäkningarna. Testdata för tryckhållfasthet används för att jämföra med förväntade resultat och avgöra om beräkningsmodellen ”2:1 metoden” är tillräcklig.Syftet är att bedöma möjligheterna för användning i två hustyper hos en ledande hustillverkare i Sverige. Miljöpåverkan av alternativen beräknas med IVL Svenska Miljöinstitutets verktyg, BM, där även en betonggrund jämförs. Det utförs även en enklare insikt i skillnader av produktion mellan en klassisk betonggrund och Klaragrunden. Studien visade att 1-plansvillan Lycke kan utföras med KLT och EPS s100, och att 1,5-plansvillan Tyresund kan se möjligheter med KLT och FoamglasT4+. Studien visade också att den bästa genomsnittliga grunden är KLT och EPS s400. Genom att byta ut betongen i en platta på mark med KLT, gör det möjligt att sänka grundens CO2 utsläpp med 65-68%. / The construction industry contributes significantly to greenhouse gas emissions, making it crucial to explore sustainable materials to reduce its impact. This study focuses on foundation systems for small wooden houses in Sweden, where concrete slabs are replaced with cross-laminated timber (CLT) to decrease climate impact. Due to concrete's high compressive strength, an analysis of the edge beam's capacity was done. Four edge beam alternatives are examined: CLT/EPS400, CLT/Foamglas, CLT/EPS s100, and EPS400. The study also evaluates the current dimensioning in strength calculations. Compression strength test data is used to compare with expected results and determine if the calculation model "2:1 method" is sufficient. The aim is to assess the possibilities for use in two house types from a leading house manufacturer in Sweden. The environmental impact of the alternatives is calculated using IVL Swedish Environmental Institute's tool, BM, where a concrete foundation is also compared. There is also a brief insight into the differences in production between a traditional concrete foundation and Klaragrunden. The findings indicated that the single-story villa Lycke can be constructed using CLT and EPS s100, while the 1.5-story villa Tyresund can explore possibilities with CLT and Foamglas T4+. Moreover, the study revealed that the CLT and EPS s400 combination yielded the best average foundation. By replacing the concrete in a ground slab with CLT, it is possible to reduce the CO2 emissions from the foundation by 65-68%.
|
93 |
Montovaná železobetonová konstrukce výrobní haly s administrativou / Prefabricated reinforced concrete structures industrial hall with administrationSitta, Martin January 2017 (has links)
As the main topic this thesis describes the design and evaluation of selected reinforced concrete members of the prefabricated reinforced concrete industrial building with administration at ultimate limit state in accordance with applicable standards. Movable overhead crane with carrying capacity of 50 tons is the main distinction of the industrial hall. Lateral frame whit main structural parts which are roof prestressed girder, load-bearing column supporting the overhead crane and drilled pile transferring loads from the upper construction to the load bearing subsoil, is designed in particular. Furthermore, design of the Gerber beam which forms the slab construction in the administrational part of the building is elaborated. Structural design and evaluation of other structures of the building is not part of this thesis.
|
Page generated in 0.0545 seconds