Spelling suggestions: "subject:"stavební""
221 |
Rekonstrukce a přístavba Městského muzea Česká Třebová - příprava realizace a řízení stavby / Reconstruction and exctension of the City Museum Česká TřebováStrnadová, Lenka January 2014 (has links)
Master thesis solves construction and technological project which deals with data processing, documentation and technological processes of building reconstruction and extension realization in Muzeum of Česká Třebová. The work contains technological building study, assessment of relationships to the wider transportation routes, time and financial plan, building-site organization project, design of the main building machines and mechanisms, technological prescriptions for excavation work and micropile injection, occupational safety and health protection management, project calculation budget.
|
222 |
Stavebně technologický projekt sídla firmy Snowboard Zezula / Construction technology project of Company Snowboard ZezulaNěmec, Martin January 2014 (has links)
In this master´s thesis I am focusing on the Construction technology project of Snowboard Zezula Company. Major part of my thesis informs on a technical report for a construction technology project, a time and a financial plan of a construction, a realization study of the main technological stage, a plan of the main construction mechanism, a project of a construction site device with drawings, a financial calculation of the construction site devices and some technological rules, checking and testing plan for designed operations. Lastly I compare the two different designs of a load-bearing construction level and I calculate time of sheat removing with the economical calculation of the work fissure number.
|
223 |
Stavebně technologický projekt výrobní haly Valaššké Meziříčí / Construction and technological project of the manufacturing hall in Valašské MeziříčíPobořil, Petr January 2015 (has links)
In my diploma thesis I solved construction and technological project of the manufacturing hall in Valašské Meziříčí. In my final thesis I focused on reinforced concrete structure for manufacturing press. For tis construction I processed technological prescription, control and test plan, budget, scheldule and assembly detail. Further I wrote up financial plan and scheldule for whole building, hazards in the workplace plan, proposal machinery, budget and scheldule for main building, site equipment project. In my final thesis, I have also dealt with solving transport roof girder on building site.
|
224 |
Stavebně technologický projekt pavilonu laboratoří technologií Akademie věd v Brně / Constructional and Technological Project of Laboratoty Pavilion for Technology of AS in BrnoCihelka, Karel January 2015 (has links)
The topic of this master thesis is dealing with selected parts of the constructional and technological project of laboratoty pavilion for technology of AS in Brno. Thesis is mainly focused for technological instructions of ground works, support of next building and solving of city center problems. Components of this thesis are evaluation plans and work place safety protocols. Next content of thesis are study of main technological phases, time and finanical plans, items budget, selected details, construction site equipment and design and verification of tower crain.
|
225 |
Rezidence Sochorova - bytový dům BD 2, stavebně technologický projekt / Residence Sochorova - apartment building BD 2, construction and technology projectVybíral, David January 2015 (has links)
This thesis describes the building of a residential house called Rezidence Sochorova BD02 in Brno, Žabovřesky. The aim was the creation of the main parts of a constructional-technological project focused on the design of transport relations, the construction site facilities and its machinery, the creation of selected technological regulations and their control and testing plans. To secure safety and to protect health during the construction work itself, a risk plan and a suggestion of safety aids was created. In addition, an itemized budget of the construction, a time plan, environmental protection and a financial and time comparison of using a hopper in contrast to a concrete pump.
|
226 |
Bytový dům Olomouc, Nezvalova ulice, stavebně technologická příprava stavby / The Flat-building in Olomouc, Nezval street, civil technological projectDrexler, Michal January 2016 (has links)
As the basis of this diploma thesis served a project of a flat house in Nezvalova Street. This flat house is designed as 7 floors high building with undergrounds garages and commercial space in the ground floor. Foundation of this building is done using reinforced concrete pilots, continued by monolithic reinforced concrete scelet. Both circumferential casing and internal walls are built using ceramic concrete blocks Porotherm, on top of which is a layer contact insulation system from EPS. Roofing of this building is done using asphalt bands into flat roof; one part of the roof is designed as “green roof” and is covered by soil substrate. This diploma thesis covers building technology preparation of construction. It includes time schedule of construction, accessibility to the building site, technical report and blueprints of building site equipment, risk plan, draft of main tools and processes for construction, instructions on how to use housing units. The main aim of this diploma thesis is around building a monolithicreinforced concrete scelet, for which a technological manual was created, control and probationary plan and blueprints of formwork for vertical and horizontal constructions. Additionally this thesis covers roofing using flat roof and asphalt belts.
|
227 |
Stavebně technologický projekt výrobní haly Massag v Bílovci / Construction technological project of factory hall in BílovecCarbol, Štěpán January 2017 (has links)
This thesis addresses the construction of steel buildings in Bílovec. In this work we are solved structurally technological study of the construction of steel buildings. The work deals with the traffic situation around the building and a landing distance. The thesis focuses on the installation for the steel skeleton and industrial floors of wire reinforced concrete, time and financial plan, project, site equipment, design of main construction machines and mechanisms, timelines, capital construction object, then control plan for the steel skeleton and industrial floor. Moreover, it is processed itemized budget including bills of quantities, Risk Plan for the steel skeleton and industrial flooring and design details. The basis for this work was the design documentation for the realization of this project.
|
228 |
Přístavba hotelu Tři Věžičky ve Stříteži - příprava realizace stavby / Extension of a hotel Tři Věžičky in Střítež - planning of implementation of constructionPupíková, Ingrid January 2017 (has links)
This thesis solves the construction technology project extension at Three Steeples in Střítež, building apartments. Work includes the complete study of the implementation, including timing and the financial plan, assessment of the wider relations of transport routes, the project site equipment, design of the main building machines and mechanisms, technological specifications for masonry, inspection and test quality plan for walling, technological prescription for clay plasters and itemized budget rough construction of the main building.
|
229 |
Stavebně technologický projekt výrobní haly v Uherském Hradišti / Construction technology project of production hall in Uherske HradisteRadmil, Aleš January 2017 (has links)
The subject of this diploma thesis is the solution of selected components of construction-technology project construction of the II. stage production hall of the company Schlote Automotive Czech Ltd. This work includes financial, temporal, technical and technological aspects of the construction process. For selected component is created technologic direction and inspection plan.
|
230 |
Stavebně technologický projekt novostavby pavilonu Veterinární a farmaceutické fakulty v Brně / Constructive-technological project of a new building University of Veterinary and Pharmaceutical Sciences BrnoGwoździová, Joanna January 2012 (has links)
The subject of the thesis is the construction-technological project New flats of Study and Information Centre of Faculty of Veterinary Medicine in Brno. The building will offer a modern study environment for students. There will be a space for the central library as well as the study centre in the SIC. Also, the university archive and museum depository of the Institute of the History of Veterinary Medicine and Pharmacy will take place there. The building will be constituted of three five-floor blocks with overall groundplan size 72,40 x 30,50 m. The construction system is comprised by a ferroconcrete frame. The block C (the northern one) has one underground floor. At the level of the first uderground floor, the particular blocks are interconnected by an installation corridor. At the level of the second and third above-ground floor, the blocks are linked up with ferroconcrete connecting bridges. In the case of the fourth above-ground floor, the blocks are bridged by a dimensional steel construction which at the same time forms a roof and lifts the glassed frontage along the perimeter of the building. The fifth above-ground floor disposes of recessive steel extenstions of the engine rooms of air conditioning system.
|
Page generated in 0.0536 seconds