Stavebně technologický projekt stavby Nové byty - Bystřice na Pasekách / Constructive-technological project of building New flats - Bystrice on PasekyLisztwanová, Mariola January 2012 (has links)
The subject of the thesis is the Constructive-Technological Project of building New Flats – Bystrice on Paseky. The building will be realized at the building plot of land within a developed area. The attempt is to leave the calm rural character of the surroundings undisturbed. The bulding is supposed to merge with the surroundings. Concerned are two apartment buildings with grand plans of 18 x 36 meters, disposing of three above-ground floors, no cellar, and a panel roof. In order to make the building merge with the surroundings, a wooden external cladding has been projected. Thus, the building is supposed to give the impression as if it was constructed of wood.
|
232 |
Stavebně technologický projekt přípravy a realizace bytového domu v Brně Líšni / Technological project of preparation and realization of residential house in Brno-LisenNečasová, Barbora January 2012 (has links)
The technological project deals with the processing of materials and documentation for the preparation and realization of the residential building in Brno Lišen.The project includes a technical report which closely provides basic information about the building. These information are complementing and justifying the project documentation of the construction technologies and other related documantation which are focusing on the creation of a control and test plans , support of the implementation of a safety plan on the construction site, proposal of the main building machines and mechanisms, design of the supply processes within the realization phase of the building process. It also contains technical regulations with detailed descriptions of chosen construction processes .
|
233 |
Výstavba sportovní haly v Novém Městě na Moravě - stavebně technologický projekt / Construction of a sports hall in Nové Město na Moravě - construction technology projectTomášek, Martin Unknown Date (has links)
This diploma thesis deals with the construction technological preparation of a sports hall in Nové Město na Moravě. The aim of the work is the most optimal design of the construction process. The work contains a technical report of construction technology project, coordination situation of construction with wider links of transport routes, calculation of construction according to THU, time and financial plan of construction, study of main technological stages of building, construction site project, design of main construction machines and mechanisms, building, time schedule of the main building, technological regulation, control and test plan, environmental and safety risks with a plan of their specific solutions for the cladding of skeleton Kingspan panels. Part of the work is also an alternative design of internal partitions.
|
234 |
Sadová, Bytový dům M1 - stavebně technologický projekt / Sadova, Apartment building M1 - construction technology projectŠtěrba, Marek January 2018 (has links)
The aim of the diploma thesis is construction-technological project of the whole construction focusing on the main building object - Apartment building, which is based on large-diameter drilling piles. The basis of the work is the budget of the main building and its timetable. Part of the thesis is a solution of organization of construction and design of building site equipment, technological regulation of selected activities, quality control and solution of transport relations including oversized transport. In addition, the design of the machine assembly, assessment of lifting mechanisms, safety and health protection and protection of the environment are solved.
|
235 |
Skladová hala v Měříně, příprava a organizace stavby / ProjectMalý, Martin January 2018 (has links)
The aim of this work is the processing of the technological project for the ,,Skladová hala v Měříně“, which addresses the preparation and organization of construction. Construction technology the project involves the processing of time plans, economic evaluation, design of pumping sources for construction, working procedures, construction site equipment, and design of major machines and mechanisms. Further, it is processed a detailed technological regulation and inspection and test plan for a prefabricated reinforced concrete skeleton. All technological procedures are processed with regard to work safety and environment.
|
236 |
Multifunkční pavilon nemocnice v Českém Krumlově - stavebně technologický projekt / Multipurpose Hospital Building in Český Krumlov - Building Technology ProjectMikulášek, Jiří January 2020 (has links)
The diploma thesis is focused on the elaboration of a construction technology project for the construction of a new hospital pavilion in Český Krumlov. The thesis processes the preparation of construction and proposal of the organization of individual activities on the construction site in time sequence. The thesis contains technological regulations for the foundation of construction and realization of the monolithic frame on the 1st floor, which also includes drawings of the formwork of the ceiling slab and a scheme of formwork of columns and walls. Further contents are technological report, technological study of realization, transport relations, time and financial plans, complete construction site equipment for the whole construction phase, design of construction mechanisms and assessment of their suitability for use, resource balance, technological analysis, itemized budget, and occupational health protection for selected processes and noise studies dealing with the impact of building construction on the surrounding development.
|
237 |
Příprava realizace víceúčelového domu Brno - Klíčova / Preparation realization multipurpose building Brno - KlíčovaSviták, Roman January 2014 (has links)
The thesis is focused on the preparation of realization the multipurpose building Brno - Klíčova. The content of this the thesis is study of construction technology followed by the construction technology project. The aim of the thesis is to identify the sources of the time, money, workers and materials of the building and then select the appropriate process of realization.
|
238 |
Komplex bytových domů, Praha - Jarov, stavebně technologická příprava stavby / The complex of residential buildings, Praha - Jarov, civil technological projectKomenda, Tomáš January 2016 (has links)
The goal of this diploma thesis is to create a building technology project for construction of 4 flat houses within stage 3a. of the building project „Green town of Prague – Jarov, phase II“. The flat houses are in two pairs interconnected by basement, each is a 7 floor high reinforced concrete building with flat roof and is functionally connected to others by a terrace garden system. This document focuses on organisation and preparation of the construction. It includes building site equipment, cost calculation for setting up and servicing of the building site with graphical illustrations for selected construction phases. Additionally a detailed time schedule was created with a proposal for stream construction of the reinforced concrete scelet and lining in the pairs of interconnected buildings. A realization study of the main technological phases was also prepared. The diploma thesis covers in detail construction of reinforced steel scelet and circumferential casing including a layer of contact insulation system. A blueprint of formwork for walls and ceiling is included in the manual for construction of reinforced steel scelet. On these particular actions probationary and control plans were added. The required machinery set with detailed placement was also drafted. An itemized budget for the main building was prepared as well. Attached to this document is a detailed manual on how to use housing units including repairs and revisions plan for next 30 years. Part of this diploma thesis is also a detailed study covering the construction in relation to the surronding living and educational areas.
|
239 |
Yacht club Hlučín - stavebně technologický projekt / Construction technology project of Yacht club in HlučínLabudek, Lukáš January 2016 (has links)
The subject of this thesis is a construction technology project object Yacht Club Hlučín. The basis for the elaboration of this work is the diploma thesis from Ing.Radim Kučera - Yacht Club Hlučín. This thesis includes technical report construction technology project, coordinating the situation with the construction of wider relations of routes for transportation of main materials, time and financial plan of the construction according to the technical-economic indicators, drawing building equipment, scheduling, inspection and test plan, technological regulation for the implementation of the gross substructure, itemized budget and the plan for OSH implementation in Yacht club Hlučín.
|
240 |
Vybrané části STP pro výstavbu administrativně bytového komplexu Sochorova / Selected parts of the Construction-technology Project for construction of Administration and Flat Buildings complex SochorovaDvořák, Marian January 2012 (has links)
Masters thesis is engaged of chosen parts of technological-buildig project of administrativ and housing complex of Sochorova in Brno, Žabovřesky. Contains technological-buildig study of first phase with brief description of advancement of construction with grafical scripts of particular steps, timetable and pecuniarytable of objects AB3, AB4, diagrams with various possibilities of using operatives. Thesis continous with calculation of entire first phase and item budged of object AB3(draft construction), statement of masurement, technical report of construction-technological AB3, plan of situaction of the building, technological manual of reiforced concrete ceiling of AB3 including plan of planking parts PERI, timetable, design of construction site equipment with technical report, proposal of machineries and crane, plane of inspections for chosen items, ecology and report about safety and health protecting on construction site.
|