• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 12
  • 7
  • 4
  • 1
  • Tagged with
  • 24
  • 10
  • 7
  • 6
  • 5
  • 5
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Transient effects of linear dynamical systems

Plischke, Elmar January 2005 (has links) (PDF)
Bremen, Univ., Diss., 2005
2

Elkvalitetsutredning vid ett kartong- och massabruk / Quality investigation regarding electricity at a board and pulp mill

Granberg, Niklas January 2016 (has links)
Rapporten behandlar en elkvalitetsutredning vid Metsä Boards fabrik i Husum. Utredningen ska utföras eftersom fabriken har genomgått en förändring då kartong tillverkas istället för papper. Detta påverkar hur konsumtionen av el ser ut både vad gäller mängd men även hur den konsumeras. Exempelvis har många strömriktare ersatts av frekvensomriktare. Någon sammangripande bild av hur läget innan såg ut finns inte så en elkvalitetutredning kommer utföras på hela fabriken, även på massabruket där processen är lika som innan omvandlingen. Störningarna i elkvaliten som rapporten kommer behandla är, övertoner, spänningsdippar, flimmer och transienter med extra fokus på THD. Nivåerna på dessa störningar kommer jämföras med de avtal som finns med elleverantören samt med standarder och föreskrifter inom området. Efter att enlinjeschemat på huvudfördelningen av el har granskats, samt genomgång om var befintlig mätutrustning finns installerad sätts en plan upp om hur utredningen skall utföras. Detta leder till att mätningar utförs på inkommande linjer från Gideåbacka transformatorstation som distribueras av Vattenfall, men även på underliggande mellanställverk inne i fabriken. Resultatet ger dels en helhetsbild men också en aning om var eventuella störningskällor kan vara placerade i fabriken. Utredningen visar att elkvaliteten överlag är god, de störningar som ligger i närheten av de gränsvärden som finns är 7e övertonen på inkommande linjer HSM1 och HSM2. Utredningen visar att Metsä Boards fabrik i Husum inte är orsaken till uppkomsten av den höga övertonhalten. Problemet uppstår från det kondensatorbatteri som är anslutet till 44 kV-skenan i Vattenfalls transformatorstation i Gideåbacka, vilket skapar resonans med lasten som är ansluten. / This report contains an investigation on the quality of the distributed electricity to Metsä Board Mill in Husum. Because the Mill has gone through large changes in the process, the end product is nowadays cardboard instead of paper and an investigation is needed. These changes have lead to a different consumption of electricity, both of the amount and the way it is consumed. There’s no summarizing image of how the electricity quality looked like before therefore a full investigation of the whole factory is needed. That includes an investigation of the pulp mill that hasn’t gone through any changes. The report investigates disturbances such as THD, voltage dips, flicker and transients with extra focus on THD. The result of the measurements is compared to agreement that’s been signed with Vattenfall but also to regulations and standards that exist. After the schedule of the main distribution of electricity for the factory has been studied, a plan is set for how the work should be done. Measurements is going to be taken at the incoming lines that are distributed by Vattenfall, but also at lower voltage transformers in the factory to be able to see where sources of disturbances might be.   The result shows that the quality of the electricity overall is good, the only thing is that the 7th harmonic on the incoming lines sometimes is higher that the acceptable limits. Further the investigation shows that the factory itself isn’t the source of these distortions. The distortion comes from a VAr (reaktiv effect) capacitor bank that is installed at Vattenfalls transformer station in Gideåbacka. The capacitor bank creates resonance with the connected load and that leads to amplification of certain harmonics.
3

Transiente Öldruckmessung zur Diagnose der Wicklungseinspannkräfte von Leistungstransformatoren

Kraetge, Alexander January 2007 (has links)
Zugl.: Berlin, Techn. Univ., Diss., 2007
4

Reduktion der dieselmotorischen Abgasemissionen in den transienten Betriebsphasen mittels modellbasierter Optimierung und Echtzeitsimulation

Klar, Henning January 2008 (has links)
Zugl.: Kassel, Univ., Diss., 2008
5

Numerical modelling of transients in electrical systems /

Zitnik, Mihael. January 2001 (has links)
University, Diss., 2001--Uppsala.
6

Modellierung und Simulation zyklisch betriebener Festbettprozesse am Beispiel der hybriden Distickstoffoxid-Zersetzung unter Strömungsumkehr

Platte, Frank January 2007 (has links)
Zugl.: Dortmund, Techn. Univ., Diss., 2007
7

Numerische Analyse transienter Wärmetransport- und Wärmespeicherungmechanismen in Heizwand und Fluid beim Blasensieden eines binären Gemisches

Fuchs, Thomas January 2008 (has links)
Zugl.: Darmstadt, Techn. Univ., Diss., 2008
8

Online-Validierung energietechnischer Prozesse unter Zulassung transienter Messdatenverläufe

Laipple, Bernd. Unknown Date (has links) (PDF)
Universiẗat, Diss., 2003--Stuttgart.
9

Minimale Zustandsform asymmetrischer dreiphasiger Energieversorgungsnetze /

Lotter, Olaf. January 2005 (has links)
Helmut-Schmidt-Universiẗat, Diss., 2005--Hamburg.
10

Data processing of Controlled Source Audio Magnetotelluric (CSAMT) Data / Data processering av Controlled Source Audio Magnetotelluric (CSAMT) data

Rydman, Oskar January 2019 (has links)
During this project three distinct methods to improve the data processing of Controlled Source Audio Magnetotellurics (CSAMT) data are implemented and their advantages and disadvantages are discussed. The methods in question are: Detrending the time series in the time domain, instead of detrending in the frequencydomain. Implementation of a coherency test to pinpoint data segments of low quality andremove these data from the calculations. Implementing a method to detect and remove transients from the time series toreduce background noise in the frequency spectra. Both the detrending in time domain and the transient removal shows potential in improvingdata quality even if the improvements are small(both in the (1-10% range). Due totechnical limitations no coherency test was implemented. Overall the processes discussedin the report did improve the data quality and may serve as groundwork for further improvementsto come. / Projektet behandlar tre stycken metoder för att förbättra signalkvaliten hos Controlled Source Audio Magnetotellurics (CSAMT) data, dessa implementeras och deras för- och nackdelar diskuteras. Metoderna som hanteras är: Avlägsnandet av trender från tidsserier i tidsdomänen istället för i frekvensdomänen. Implementationen av ett koherenstest för att identifiera ”dåliga” datasegment ochavlägsna dessa från vidare beräkningar. Implementationen av en metod för att både hitta och avlägsna transienter (dataspikar) från tidsserien för att minska bakgrundsbruset i frekvensspektrat. Både avlägsnandet av trender samt transienter visar positiv inverkan på datakvaliteten,även om skillnaderna är relativt små (båda på ungefär 1-10%). På grund av begränsningarfrån mätdatan kunde inget meningsfullt koherenstest utformas. Överlag har processernasom diskuteras i rapporten förbättrat datakvaliten och kan ses som ett grundarbete förfortsatta förbättringar inom området.

Page generated in 0.0951 seconds