31 |
Technologický projekt sportovní haly v obci Nové Veselí / Technological project of a sports hall in Nové Veselí villageVaněk, Jiří January 2012 (has links)
This Master's thesis deals with the technological project of sports hall in New Veseli . This work includes the construction and technological equipment for the study site , ZOV , technological regulations, building equipment, wider transport relations, budget calculation , time planning , inspection and test plan , design mechanisms , job security this building , balance resources.
|
32 |
Die postmoderne 'neue Autobiographie' oder die Unmöglichkeit einer Ich-Geschichte am Beispiel von Robbe-Grillets 'Le miroir qui revient' und Doubrovskys 'Livre briséToro, Alfonso de 17 August 2022 (has links)
Der Beitrag befasst sich mit der allgemeinen Diskussion zur „neuen Autobiographie“ sowohl historisch als auch theoretisch. Dabei wir Lejeunes Konzept des „autobiographischen Paktes“ einer grundlegenden Kritik unterzogen. Im Anschluss an Robbe-Grillets Le miroir qui revient, Doubrovskys Livre brisé, an Lacan, Derrida, Deleuze, Ricardou, Barthes, an die poststrukturale Theoriebildung und an die neue Geschichtsschreibung wird Lejeunes Theorie durch ein neues Modell ersetzt, in dem die ‚neue Autobiographie’ als eine ‚aventure d’un récit’, als ‘glissement’, ‘série- aléatoire’, als Wider-Wiederserschreiben‘, als einen Prozess eines Werdens von Biographemen, erfasst wird, deren ‚Wirklichkeit’/‚Wahrheit’ sich in der absoluten Augenblicklichkeit der Niederschrift bzw. des Schreibaktes vollzieht. / The article deals with the general discussion on the „new autobiography“ both historically and theoretically. Lejeune’s concept of the „autobiographical pact“ is subjected to a fundamental critique. Following Robbe-Grillet’s Le miroir qui revient, Doubrovsky’s Livre brisé, Lacan, Derrida, Deleuze, Ricardou, Barthes, the poststructural theory and the new historiography, Lejeune’s theory is replaced by a new model, in which the ‘new autobiography’ is grasped as an ‘aventure d’un récit’, as a ‘glissement’, ‘série- aléatoire’, as ‘re-and-re-writing’ as a process of a becoming of biographical themes whose ‘reality’/’truth’ takes place in the absolute instantaneousness of the act of writing. / L’article aborde la discussion générale sur la „nouvelle autobiographie“, tant du point de vue historique que théorique. Le concept de „pacte autobiographique“ de Lejeune y est soumis à une critique fondamentale. Dans le sillage de Miroir qui revient de Robbe-Grillet, de Livre brisé de Doubrovsky, de Lacan, Derrida, Deleuze, Ricardou, Barthes, de la théorie poststructurale et de la nouvelle historiographie, la théorie de Lejeune est remplacée par un nouveau modèle, dans lequel la ‘nouvelle autobiographie’ est saisie comme une ‘aventure du récit’, comme un ‘glissement’, comme une ‘série aléatoire’, comme ‘ré- and ré-écriture’ comme un processus en devenir de biographèmes dont la ‘réalité’/’vérité’ se produit dans l’instantanéité absolue de l’écriture ou de l’acte d’écriture.
|
33 |
Skladovací hala PFM Flexi - stavebně technologický projekt / PFM Flexi storage hall - construction technology projectChroustovský, David January 2018 (has links)
The aim of this diploma thesis is the design of an effective construction-technological project for the construction of reinforced concrete prefabricated storage halls by PFM-Flexi, s.r.o. The solution of the chosen problem is the design of the building site equipment, the verification of the transport routes of the key materials, the assembly schemes, the technological regulation and the control and test plan for the precast reinforced concrete frame, the BOZP plan, the comparison of the two versions of the installation in financial terms, the budget item and the schedule of the main building, timetable, calculation timetable and environmental aspects of the construction.
|
34 |
Montovaná hala, areál firmy Bosh Diesel s r.o. - stavebně technologická příprava stavby. / Prepared hall of the company Bosh Diesel s.r.o. - civil technical project.Koláček, Ivo January 2019 (has links)
The masters thesis prepares the project of a prefabricated hall in the premises of Bosch Diesel s. r.o. The work completely elaborates the technical report, the coordination situation with the relations to the wider transport routes, the study of the main technological stages, the project of the building site, the design of the machines, the schedule of the main building, the material and human resources, the technological regulations, the control and test plan, safety and health protection during work, noise study, budget and building details.
|
35 |
Příprava realizace dostavby klinické hematologie FN Brno / Preparation of realization of completion of clinical hematology, University Hospital BrnoPrůcha, Aleš January 2020 (has links)
The aim of this diploma thesis is a solution of the extension of clinical hematology of the Faculty Hospital Brno. The thesis deals with the technological regulation for steel construction, coupled ceiling concrete slab with other topics including an inspection-check plan, a time schedule for carcass, time and financial schedule for structures and an item budget. In addition, this work includes the coordination site-layout of the construction with wider transport relations, mechanical assembly, the principles of the organization of site equipment and occupational safety and health risks. Finally this thesis contains several assessments for cranes, scheme of principles of fixing steel columns into structure, scheme of laying building envelope, LEED, site equipment financial assessment.
|
36 |
Rekonstrukce a přístavba Městského muzea Česká Třebová - příprava realizace a řízení stavby / Reconstruction and exctension of the City Museum Česká TřebováStrnadová, Lenka January 2014 (has links)
Master thesis solves construction and technological project which deals with data processing, documentation and technological processes of building reconstruction and extension realization in Muzeum of Česká Třebová. The work contains technological building study, assessment of relationships to the wider transportation routes, time and financial plan, building-site organization project, design of the main building machines and mechanisms, technological prescriptions for excavation work and micropile injection, occupational safety and health protection management, project calculation budget.
|
37 |
Bytový dům Olomouc, Nezvalova ulice, stavebně technologická příprava stavby / The Flat-building in Olomouc, Nezval street, civil technological projectDrexler, Michal January 2016 (has links)
As the basis of this diploma thesis served a project of a flat house in Nezvalova Street. This flat house is designed as 7 floors high building with undergrounds garages and commercial space in the ground floor. Foundation of this building is done using reinforced concrete pilots, continued by monolithic reinforced concrete scelet. Both circumferential casing and internal walls are built using ceramic concrete blocks Porotherm, on top of which is a layer contact insulation system from EPS. Roofing of this building is done using asphalt bands into flat roof; one part of the roof is designed as “green roof” and is covered by soil substrate. This diploma thesis covers building technology preparation of construction. It includes time schedule of construction, accessibility to the building site, technical report and blueprints of building site equipment, risk plan, draft of main tools and processes for construction, instructions on how to use housing units. The main aim of this diploma thesis is around building a monolithicreinforced concrete scelet, for which a technological manual was created, control and probationary plan and blueprints of formwork for vertical and horizontal constructions. Additionally this thesis covers roofing using flat roof and asphalt belts.
|
38 |
Výstavba haly Karusel - stavebně technnologický projekt / Construction of the hall Carousel - construction technology projectUrbánek, Lukáš January 2017 (has links)
This master's thesis aims to create a construction technological project for the construction of production halls of the company Beton Brož s.r.o. The content reveals solution to transport oversized steel construction elements, equipment of construction zone, technological prescription for micropiles including quality control of performed work, ensuring safety and health protection at work, schedule and budget of the main building and draft of contract for work.
|
39 |
Administrativní budova ESKO-T, stavebně technologický projekt / Administrative building ESKO-T, construction technology projectVochyán, David January 2017 (has links)
The aim of this thesis is compile building and technological project of new office building of the company ESKO-T in Třebíč. This is a two-storey building, build technology cast-in-place longitudinal reinforced concrete frame with mono-pitched roof. Work is consist of a possible solution of steel, concrete and formwork of rental shop to building. Building and technological project, technological regulation for concreting, draft machine configuration, documentation broker transport relations, the crane card and concrete pump, control od worte quality, time schedule and building budget rough upper construction, environmental protection, occupational safety and health, object work schedule and price comparison concreting with hanging silo for concrete and concrete pump.
|
40 |
Stavebně technologický projekt přípravy a realizace Domova pro seniory Žacléř / Construction project for implementation of Retirement home ŽacléřBonaventura, Pavel January 2022 (has links)
The aim of this diploma thesis is to prepare the construction of a Home for the Elderly in Žacléř. The work deals with technical regulations for the dismantling of asbestos roofing, demolition work and monolithic structures. For these regulations, a time plan for the implementation of monolithic structures, a control and test plan for monolithic structures, an itemized budget and a time and financial plan - object-oriented will be prepared. Furthermore, this work contains the coordination situation of the construction with broader transport relations, the design of the assembly machine, the report for the construction site equipment with drawings of the construction site equipment for individual technological regulations and last but not least the health and safety plan and assessment of construction noise. As part of the diploma thesis, several appendices were prepared for this stage, such as crane assessment, details of monolithic stair arms, noise wall scheme, budget for construction site equipment, environmental plan, ceiling and wall formwork scheme and staff balance for selected stages.
|
Page generated in 0.0505 seconds